Loading...
HomeMy WebLinkAbout20210298 Ver 1_Compliance Evaluation Inspection_20210804Wetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20210298 NCDOT - James Chapel Road Widening Project Haywood NCDOT - James Chapel Road Widening Project NC DOT Division 14 - Sylva 8/4/2021 Routine Records/File Review (DOT) Version: 1 Status:Issued Project Type:Road/Highway Widening Region:Asheville Longitude:-82° 53' 33''+35° 38' 03'' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant Question Areas: Program Areas:401 (includes isolated/non-404) Permit (401 WQC) Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on August 4, 2021. Kevin Barnett was present during the inspection. Remove small checks in JS and erosion control baffle before it enters Bald creek. Inspection Summary: page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20210298 8/4/2021 Blazer, Keith Records/File Review (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: page:2