HomeMy WebLinkAbout20210298 Ver 1_Compliance Evaluation Inspection_20210804Wetland Inspection Report
Inspection Type:
Reason for Inspection:
Inspection Date:
Site Owner Name:
Latitude:
County:
Project Name:
Project Num:
Location:
SW Plan Location:
20210298
NCDOT - James Chapel Road Widening Project
Haywood
NCDOT - James Chapel Road Widening Project
NC DOT Division 14 - Sylva
8/4/2021
Routine
Records/File Review (DOT)
Version: 1 Status:Issued
Project Type:Road/Highway Widening
Region:Asheville
Longitude:-82° 53' 33''+35° 38' 03''
Inspection Contact Person:Title:Phone:
On-Site Representative(s):
Secondary Inspector(s):
Primary Inspector:Phone:Robert K Mitchell
Facility Compliance Status:Compliant Not Compliant
Question Areas:
Program Areas:401 (includes isolated/non-404)
Permit (401 WQC)
Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on August 4, 2021. Kevin Barnett
was present during the inspection.
Remove small checks in JS and erosion control baffle before it enters Bald creek.
Inspection Summary:
page:1
Inspection Date:
Site Number:
Inspection Type:
Owner:
Reason for Visit:
20210298
8/4/2021
Blazer, Keith
Records/File Review (DOT)Routine
Permit (401 WQC)Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment:
page:2