Loading...
HomeMy WebLinkAbout20211069 Ver 1_Pre-Filing Meeting Request_20210706 tie R•.'. DWR Pre-Filing Meeting Request Form NORTH CAROLINA EnYlmnal2nlrtl Qua fay ID#* 20211069 Version* 1 Regional Office* Washington Regional Office-(252)946-6481 Reviewer List* Garcy Ward Pre-Filing Meeting Request submitted 7/6/2021 ......................................................................................................................................................................................................................................................................................................................................................................................................................................................... Contact Name* John McNulty Contact Email Address* jmcnulty@kcaeng.com Project Name* BP2.R018.1 Project Owner* NCDOT(Division 2) Project County* Pitt Owner Address: Street Address 2815 Rouse Road Extension Address Line 2 City State/Rovince/Region Kinston NC Fbstal/Zip Code Country 28504 Pitt Is this a transportation project?* r Yes r No Type(s)of approval sought from the DWR: rJ 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express • Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Garcy Ward Please give a brief project description below and include location information.* State project BP2.R018.1 will consist of replacing the structurally deficient NCDOT bridge#730015 on SR 1565 over Chicod Creek. The proposed replacement structure is a 2-span (1@55;1@50")21" PCCS with 2.5'caps with an out-to-out deck width of 30'which will replace the existing 3-span(1@30'-5", 1@30'-0", 1@30'-7"). Roadway fill slopes will be 3:1 or flatter,with the exception around the bridge opening,and will all be grassy to encourage a diffuse flow pattern and passive stormwater treatment. Stormwater runoff from the bridge and approach slabs will be collected by traffic bearing grated inlets where it will discharge to roadside swales with rip rap dissipator pads at the pipe outlets.All areas in which fill slopes impact existing ditches will be replaced by a swale to maintain existing drainage patterns. Please attach the documentation you would like to have the meeting about. BP2.R018.1_Redline_Plans.pdf 12.69MB BP2.R018.1 DRAFT_NRTR.pdf 7.79MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. . I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. . I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature C,4iar fc rer Submittal Date 7/6/2021