HomeMy WebLinkAbout20080102 Ver 2_Inspection_20130618NCDEN '�Fr� , ,� 10/'? �
North Carolina Department of Environment and Natural Resoikco§�v���TY
Division of Water Quality rFRB
Pat McCrory Thomas A. Reeder JoY'..�Wkvarla, III
Governor Acting Director Secretary
June 18, 2013
Mr. J. J. Swain, Jr., P.E.
Division 13 Engineer
N.C. Department of Transportation
Post Office Box 3279
Asheville, North Carolina 28802
Subject: Inspection
TIP No. B -4182
DWQ Project 20080102V.2
NCSR 1503 (Upper Laurel Road)
Madison County
Dear Mr. Swain:
On June 4, 2013, I inspected the construction work on TIP Project No. B -4182, over Big Laurel Creek, on
NCSR 1503 (Upper Laurel Road), in Madison County. The inspection included a review of the construction
and compliance with the 401 Water Quality Certification.
Please ensure that all sediment and erosion control structures are maintained and seeding and mulching are
performed as required to protect State surface waters. Also, please refer to the attached inspection report for
any specific items noted during the inspection.
If you have questions, please call me at 828 - 296 -4500.
Sincerely,
PA-t-1—
i�
Michael R. Parker
Environmental Senior Specialist
Attachment
cc: Randy McKinney, PE
Roger Bryan, Division 13, DEO
Ben DeWit, Roadside Environmental
Transportation Permitting Unit
Mike Parker, Asheville Regional Office
TIP No. B -4182 NCSR 1503 June 2013 Inspection Letter
SURFACE WATER PROTECTION SECTION — Asheville Regional Office
2090 U.S. 70 Highway, Swannanoa. NC 28778 -8211
Phone. 828- 2964500 l FAX - 828 - 299 -7043 One
Internet: www.ncwatercluality orq NorthCarolina
An Equal Opportunity 1 Affirmative Action Employer NaturalltY
Wetland Inspection Report
Project Num: 20080102
Project Name: NCDOT- Bridge No. 246 on SR 1503
County: Madison
Location: NCDOT- Bridge No. 246 on SR 1503
Latitude:
SW Plan Location:
Site Owner Name: NC DOT Division 13
Inspection Date: 06/04/2013
Reason for Inspection: Routine
Inspection Type: Site Inspection (DOT)
Inspection Contact Person:
On -Site Representative(s):
Primary Inspector: Michael R Parker
Secondary Inspector(s):
Facility compliance Status: U Compliant
Program Area: 401 (includes isolated /non -404)
Version: 2 Status: Issued
Project Type: Replace bridge with bridge
Region: Asheville
Title:
Longitude:
n Not Compliant
Phone:
Phone: 828 -296 -4500
Question Areas:
0 Permit (401 WQC)
Inspection Summary:
Contractor had removed old bridge and was in process of excavating foundation for culvert bottom.
Sediment and erosion control measures appeared to be operating properly.
Seed and mulch all bare areas as required and continue to maintain sediment and erosion control measures.
Permit (401 WQC)
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and /or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment:
■Q❑❑
■nnn
■nnn
Page: 1