Loading...
HomeMy WebLinkAboutNCC214432_ESC Approval Submitted_20210805r., f TOWN of WAKE FOREST EROSION AND SEDIMENT CONTROL LAND DISTURBING PERMIT LETTER OF APPROVAL July 30, 2021 Toll Southeast LP Company, Inc 900 Perimeter Park Drive Suite 3B Morrisville, NC 27560 RE: Project Name: Holding Village South Lake Subdivision — Ph. 4 Permit No: 2020-00000127 Location: 0 Friendship Chapel Rd (PIN 1840643841) Wake Forest, NC 27587 Acres Approved: 12.85 Submitted By: McAdams Date Approved: February 17, 2020 Revision Approved: July 30, 2021 (Change of Ownership) Dear Sir/Madam: 301 S. Brooks Street Wake Forest, NC 27587 t 919.435.9400 www makeforestnc.gov This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. Final signature copies shall be submitted to the Town of Wake Forest, as well as, a digital copy at least one week prior to the preconstruction meeting. The land disturbance permit shall expire two (2) years from the date of approval and can be renewed in one-year increments. Per the Unified Development Ordinance (UDO), a copy of the approved erosion control plan shall be on file at the job site. Also, this letter gives the notice of our right to periodically inspect the jobsite to ensure compliance with the approved plan as outlined in the UDO. The Town of Wake Forest Erosion and Sediment Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Town of Wake Forest Erosion and Sediment Control Ordinance, this office may require revisions to the plan and implementation of the revisions to ensure compliance with the UDO. Acceptance and approval of this plan is conditioned upon your compliance with Federal, State, and Local water quality laws, regulations, and rules. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form. You are requested to file an amended form if there are any changes in the information. Please set up a preconstruction conference with all parties involved through the Planning Department. A preconstruction meeting must be held with the Town prior to starting any work, including installation of erosion control measures, demolition, any clearing and grubbing or earth moving activities. Be aware that your project is subject to the NPDES General Stormwater Permit NCG01000 (Construction Activities). The Town will no longer distribute the NCG01 permit, you will have to obtain the permit from NC DEMLR. To receive a Certificate of Coverage, you must submit an electronic Notice of Intent with this approval letter. You will also need to have copies of the compliance plans sheets, (Ground Stabilization and Material Handling, and Inspection, Recordkeeping, and Reporting), if they were not included in the approved erosion and sediment control plan onsite. Sincerely, Carrie Mitchell, PE Environmental Engineering Manager Town of Wake Forest