HomeMy WebLinkAboutNCC203411_NOT Closeout Documents_20210802North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094
(910) 433-3300
County: Hoke Project: The Eastlands at Bedford - Lot 339 River basin: Cape Fear
Person financially responsible: H&H Constructors, Inc. - Brian Walker, Division Project #: HOKE-2021-002
Manager & Agent NCC203411
Address: 2919 Breezewood Avenue, Suite 400, Fayetteville, NC
1. Project Location: Cromwell Court, McLauchlan
Pictures: No
2. Weather and soil conditions: sunny/workable soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name):
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: April 29, 2021
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO1) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at:
https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Penny Markle Others present:
Date of inspection: April 27, 2021 Time arriving on site: 3:36 PM Time leaving site: 4:00 PM
cc: