Loading...
HomeMy WebLinkAboutNC0021920_authorization to construct_20030226State of North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor William G. Ross, Jr., Secretary Alan W. Klimek, P.E., Director February 26, 2003 Mr. Rob Armstrong, P.E. Public Works Director City of Whiteville P.O. Box 607 Whiteville, North Carolina 28472 NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subject: Authorization to Construct Permit Issuance ATC Number 021920A01 Whiteville WWTP NPDES Permit NC0021920 Columbus County Dear Mr. Armstrong: A request for an Authorization to Construct (ATC) was received by the Division and final plans and specifications for this project have been reviewed and found to be satisfactory. Authorization is hereby granted for additions to the City of Whiteville's wastewater treatment plant. Specifically, this ATC allows for the construction of a headworks structure consisting of a vortex grit removal chamber, a mechanical bar screen, a headworks bypass with manual bar screen, and all necessary piping and appurtenances. This Authorization to Construct is issued under the assumption that headworks structure dead weight will be greater than buoyancy reactions. This Authorization to Construct is issued in accordance with NPDES Permit No. NC0021920 issued March 30, 2000, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in the permit. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the North Carolina Division of Water Quality. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Wilmington Regional Office, telephone number (910) 395-3900, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an in -place inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. 1617 MAIL SERVICE CENTER, RALEIGH, NORTH CAROLINA 27699-161 7 - TELEPHONE 919-733-5083/FAX 919-733-0719 AN EQUAL OPPORTUNITY AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED/ 1 0% POST -CONSUMER PAPER VISIT US ON THE WEB AT http://h2o.enr.state.nc.us/NPDES Mr. Armstrong NC0021920 2 Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified water pollution control treatment system operator to be in responsible charge (ORC) of the water pollution control treatment system. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the water pollution control treatment system by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of Title 15A, Chapter 8G, .0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III, and IV facility at least daily, excluding weekends and holidays, and must properly manage and document daily operation and maintenance of the facility and must comply with all other conditions outlined in Title 15A, Chapter 8G, .0204. Once the facility is classified, the Permittee must submit a letter to the Certification Commission which designates the operator in responsible charge within: (A) Sixty calendar days prior to wastewater being introduced into a new system or (B) within 120 calendar days of the following, (i) after receiving notification of a change in the classification of the system requiring the designation of a new ORC and back-up ORC or (ii) a vacancy in the position of ORC or back-up ORC. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. The Operational Agreement between the Permittee and the Environmental Management Commission is incorporated herein by reference and is a condition of this Permit. Noncompliance with the terms of the Operational Agreement shall subject the Permittee to all sanctions provided by G. S. 143- 215.6 for violation of or failure to act in accordance with the terms and conditions of this Permit. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to the NPDES Unit, Division of Water Quality, 1617 Mail Service Center, Raleigh, NC 27699-1617. One (1) set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Mr. Mark McIntire, P.E., telephone number (919) 733-5083, extension 508. 17.(Alan W. Klimek, P.E. cc: Central Files NPDES Unit, Permit File Wilmington Regional Office, Water Quality Technical Assistance and Certification