Loading...
HomeMy WebLinkAbout20121050 Ver 1_Email_20130619Euliss, Amy From: Euliss, Amy Sent: Wednesday, June 19, 2013 3:00 PM To: Slaughter, Johnathan H; Matthews, Monte K SAW Subject: RE: SR 1128C Andy Hicks Okay. Thanks for letting me know. From: Slaughter, Johnathan H Sent: Wednesday, June 19, 2013 2:33 PM To: Matthews, Monte K SAW; Euliss, Amy Subject: FW: SR 1128C Andy Hicks FYI and see below. This will steepen up the pipe a little but there isn't anything we can do about it. I told them not to bury the inlet. From: Pilkington, Olivia L Sent: Wednesday, June 19, 20131:48 PM To: Slaughter, Johnathan H Cc: Dishman, Ivan H Subject: SR 1128C Andy Hicks Good afternoon Heath Slaughter, This email is pertaining a permitted pipe in Watauga County on SR 1128C, at station 91 +90. At this location, the fill slopes hit at the inlet of a private pipe. We believe a junction box is necessary to tie both systems together. There will not be a linear change in the impacted stream, only a change in the percent fall of the pipe. This change is to ensure the pipe /box /pipe system performs in a safe, fluid manner next to the road way. I do not believe this violates the permit conditions but is a change in the approved plan. Please notify the appropriate people. Thank you Olivia L. Pilkington Assistant District 2 Engineer NCDOT Division 11 oloilkington @ncdot.gov 828.265.5380 Email correron(dence, to and from `hi_ il I to 'he I I,^,, PL,hjjr Rec or(I's La,,,, an(d ma he (disclose' to thir(d pa r'IP-