HomeMy WebLinkAbout20121050 Ver 1_Email_20130619Euliss, Amy
From: Euliss, Amy
Sent: Wednesday, June 19, 2013 3:00 PM
To: Slaughter, Johnathan H; Matthews, Monte K SAW
Subject: RE: SR 1128C Andy Hicks
Okay. Thanks for letting me know.
From: Slaughter, Johnathan H
Sent: Wednesday, June 19, 2013 2:33 PM
To: Matthews, Monte K SAW; Euliss, Amy
Subject: FW: SR 1128C Andy Hicks
FYI and see below. This will steepen up the pipe a little but there isn't anything we can do about it. I told them not to bury the inlet.
From: Pilkington, Olivia L
Sent: Wednesday, June 19, 20131:48 PM
To: Slaughter, Johnathan H
Cc: Dishman, Ivan H
Subject: SR 1128C Andy Hicks
Good afternoon Heath Slaughter,
This email is pertaining a permitted pipe in Watauga County on SR 1128C, at station 91 +90.
At this location, the fill slopes hit at the inlet of a private pipe. We believe a junction box is necessary to tie both systems together. There will not be a linear
change in the impacted stream, only a change in the percent fall of the pipe. This change is to ensure the pipe /box /pipe system performs in a safe, fluid manner
next to the road way.
I do not believe this violates the permit conditions but is a change in the approved plan. Please notify the appropriate people.
Thank you
Olivia L. Pilkington
Assistant District 2 Engineer
NCDOT Division 11
oloilkington @ncdot.gov
828.265.5380
Email correron(dence, to and from `hi_ il I to 'he I I,^,, PL,hjjr Rec or(I's La,,,, an(d ma he (disclose' to thir(d pa r'IP-