July 27, 2021
LETTER OF APPROVAL WITH MODIFICATIONS
Mark Oil Co. Inc.
Attention: William Tome Jr, President
Post Office Box 32064
Charlotte, North Carolina 28232
RE: Project Name: BP Mills Project — Rocky River Road Concord
Acres Approved: 3.16
Project ID: CABAR-2022-001
County: Cabarrus, City: Concord
Address: Holden Avenue SW
River Basin: Yadkin-PeeDee
Stream Classification: Other
Submitted By: Mark Oil Co. Inc.
Date Received by LQS: July 01, 2021
Plan Type: New
Dear Mr. Tome:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with
modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are
listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -
disturbing activity has been undertaken, as is required by Title 15A NCAC 413 .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent
(NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General
Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named
project. The NOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette
Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov, After you submit a complete and correct
NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for
coverage under the NCGO1 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is
to be sent to the DEMLR Stormwater Central Office staff in Raleigh.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job
site:
The approved E&SC plan as well as any approved deviation.
2, The NCGO 1 permit and the COC, once it is received.
Records of inspections made during the previous 30 days.
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Mooresville Regional Office 1610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115
704-663-1699
Letter of Approval
Mark Oil Co. Inc.
July 27, 2021
Page 3 of 3
MODIFICATIONS REQUY ED FOR APPROVAL
Project Name: BP Mills Project — Rocky River Road Concord
Project ID: CABAR-2022-001
County: Cabarrus
The new NCGOI Construction stormwater permit requires Ground Stabilization and Materials Handling and
Self -Inspection, Recordkeeping and Reporting requirements on your plans. The NCGOI compliance plan sheets
for these can be found at https://deq.nc.gov/about/divisions/energy-mineral-laird-resources/energy-mineral-land-
permits/stormwater-permits/construction-sw.