Loading...
HomeMy WebLinkAboutNCC214427_ESC Approval Submitted_20210804ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director q. NORTH CAROLINA Environmental Quality July 27, 2021 LETTER OF APPROVAL WITH MODIFICATIONS Mark Oil Co. Inc. Attention: William Tome Jr, President Post Office Box 32064 Charlotte, North Carolina 28232 RE: Project Name: BP Mills Project — Rocky River Road Concord Acres Approved: 3.16 Project ID: CABAR-2022-001 County: Cabarrus, City: Concord Address: Holden Avenue SW River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: Mark Oil Co. Inc. Date Received by LQS: July 01, 2021 Plan Type: New Dear Mr. Tome: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 413 .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov, After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: The approved E&SC plan as well as any approved deviation. 2, The NCGO 1 permit and the COC, once it is received. Records of inspections made during the previous 30 days. North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Mooresville Regional Office 1610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 704-663-1699 Letter of Approval Mark Oil Co. Inc. July 27, 2021 Page 3 of 3 MODIFICATIONS REQUY ED FOR APPROVAL Project Name: BP Mills Project — Rocky River Road Concord Project ID: CABAR-2022-001 County: Cabarrus The new NCGOI Construction stormwater permit requires Ground Stabilization and Materials Handling and Self -Inspection, Recordkeeping and Reporting requirements on your plans. The NCGOI compliance plan sheets for these can be found at https://deq.nc.gov/about/divisions/energy-mineral-laird-resources/energy-mineral-land- permits/stormwater-permits/construction-sw.