Loading...
HomeMy WebLinkAboutNCC191502_NOT Closeout Documents_20210802North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200 County: Wake Project: Wakefield Trail Repaving River basin: Neuse Person financially responsible: City of Raleigh -Scott Payne, Assistant Director Project #: WAKE-2020-015 Address: PO Box 590, Raleigh, NC 27602 1. Project Location: Wakefiled Plantation Drive, Raleigh Pictures: No 2. Weather and soil conditions: overcast, dry, workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): no one on site Title: Inspection report: Sent Report Date given/sent: May 21, 2021 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Kimberly Summers Others present: Date of inspection: May 18, 2021 Time arriving on site: 12:30 PM Time leaving site: 1:00 PM cc: Yes