HomeMy WebLinkAboutNCC214431_ESC Approval Submitted_20210804NORTH CAROLINA Lr�Kiairmen�'al �urx(IOy July 23 2021 LETTER OF APPROVAL W/ MODIFICATIONS The Rick Herrema Foundation, Inc. Diana. Juergens, Executive Director 5572 Shenandoah Drive Fayetteville, NC 28304 RE: Project Name:: Rick Herrema Foundation — Misc. Site Improvements Acres Approved: 7.0 Project ID CUMBE-2021-149 County: Cumberland, City: Fayetteville Address: Shenandoah Drive River Basin: Cape Fear Stream Classification: Other Submitted by: James Reed Date Received by.LQS: June 25, 2021 Plan Type: Commercial Dear Mrs. Juergens: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and herebyissue this Letter of Approval.. The enclosed . Certificate of Approval must be posted at the job site: This plan shall expire three .(3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form. MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette. lueas gcdenr.gov or Paul Clark at Paul.clarkgncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. -Initially, DEMLR will not charge a fee for coverage under the NCGOI permit. However, on or after June 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. North carogna epartmentof Envltonmentat Quality Diufston,of Energy Mtneca(and Land_Resacrrcea E. k 5Y izab fi, �. Fay "ev. ille ltegi*04t ot`fte 22S Greets Steeee.. itite?�4; .FayeitGt t€Ce i c rth C�rvtin 2& ioi Title 15A NCAC 4B .0118(a) and the NCGO 1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO 1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to. meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. Any addition in impervious surface, over that already noted on the approved plan, would also require a revised plan to verify the appropriateness of the erosion control measures and the stormwater retention measures. (GS 113A-54.1(b)). In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, GV.— Z>... Chris Baker Assistant Regional Engineer DEMLR - Fayetteville Regional Office Enclosures: Certificate of Approval cc: James Reed, P. E., Gradient, PLLC — electronic copy Joe Staton, City of Fayetteville Permit Office — electronic copy Fayetteville Regional Office Letter of Approval with Modifications Project Name: Rick Herrema Foundation — Misc. Site Improvements Date: July 23, 2021 Project Number: CUMBE-2021-149 County: Cumberland MODIFICATIONS REQUIRED FOR APPROVAL Please include maintenance requirements for the skimmer and for the riprap dissipator pad for the skimmer. Our office must receive a hard copy of these modifications by August 13, 2021, otherwise the permit may be rescinded. Ref. G. S. 113A-54.1 Through G. S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities