Loading...
HomeMy WebLinkAbout820466_Sludge POA_20160111pusga PLAN OF ACTION (POA) FOR LAGOON SLUDGE REDUCTION Facility Number: 82-466 Facility Name: 20383 A Certified Operator Name: Murphy -Brown LLC Operator #: County: Sampson Note: A certified Sludge Management Plan may be submitted in lieu of this POA. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon 6 a. Lagoon Name/ Identifier 20383 A b. Total Sludge Depth (ft) 5.65 c. Sludge Depth to be Removed for Compliance (ft) .29 d. Sludge Volume to be Removed (gallons) 2000000 e. Sludge PAN (Ibs/1000 gal) 10 f. Liquid PAN (Ibs/1000 gal) 2 g. PAN of Sludge (Ibs) (d x e)/1000 20000 Compliance Timeframes: If the sludge level is equal to or higher than the stop pump level of the lagoon or if the sludge level results in an elevated waste analysis, a sludge management plan that meets the requirements of SB Interagency Group Guidance Document 1.26 must be prepared by a technical specialist and submitted to DWQ within 180 days. Work to reduce the sludge level must begin within another 180 days. Compliance with NRCS Standard 359 must be achieved by the expiration date of the current permit. If the sludge level is non -compliant but below the stop pump level of the lagoon, a POA must be filed within 90 days and compliance with NRCS Standard 359 must be achieved within two years of the original sludge survey indicating non-compliance. If future sludge surveys do not show improvement in sludge levels, DWQ may require the owner to develop a sludge management plan that meets the requirements of SB Interagency Group Guidance Document 1.26. SPOA 3-22-2010 Page 1 of 2 RECEIVEDINCDEQ/DWR JAN 1 1 2016 Water Quality Regional Operations Section NARRATIVE: Use this section to describe the method(s) that will be used to lower the sludge depth. If microbe use is planned, specify the product to be used. Mechanical Removal By Pump and Haul —Land has been identified in the vicinity of the lagoon that will allow for the agitation and mixing of the sludge layer, and subsequent land application of the material on these acres. A sludge management plan will be developed prior to initiating these activities, and records will be kept of these applications as required by permit. Or Sludge will be mechanically removed by a dredged or lagoon agitator pump then mixed with polymer and pumped into geotextile tubes for dewatering of the solids. Solids will be harvested from geotextile tubes after adequate drying and hauled to agricultural fields for agronomic application. I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. I further certify and acknowledge that compliance with regard to sludge accumulation must be achieved within two years of the original sludge survey indicating non-compliance. Sludge Survey Date: 1/7/15 Compliance Due Date: 1/7/17 Murphy -Brown LLC Facility Owner/Manager (pri Facility Owner/Manager (signature) Phone: 910-293-3434 Date: 10/1/15 Return this form to: Animal Feeding Operations Unit NC Division of Water Resources 1636 Mail Service Center Raleigh, NC 27699-1636 SPOA 3-22-2010 Page 2 of 2