HomeMy WebLinkAboutNCC203205_NOT Closeout Documents_202108024HOLLY
SPRINGS
iDipm we F The 5owrcc.
Town of Holly Springs
Engineering Department
Certificate of Completion For
Erosion and Sedimentation Control
PROJECT Rosewood Professional Centre PHASE n/a
ENVIRONMENTAL DEVELOPMENT PERMIT NO. 17-2020
FINANCIALLY RESPONSIBLE PARTY Rosewood Centre, LLC — Bunn Olive
DATE 3-11-2021
This is to certify that on the above referenced project the grading has been
completed, all utilities and streets have been installed, and permanent stabilization
has been successfully achieved in or along all roads and utilities in accordance with
the approved erosion control plan. With this certificate, the Town of Holly Springs
Engineering Department certifies that the above referenced project is in final
compliance with the Town's Soil Erosion and Sedimentation Control Ordinance
and therefore closes the active erosion control file for the above referenced project.
Jeff Peters, Engineering Technician
Note: This document does not preclude the Town from taking action on future land disturbance or other erosion or
sedimentation issues at this site.