Loading...
HomeMy WebLinkAboutNCG020863_ARO Letter Approving Dormant Status_20210730ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director Vulcan Construction Materials, LP NORTH CAROLINA Envimnmental Quality July 30, 2021 Attn: Tony Johnson, Environmental Engineer 11020 David Taylor Drive, Suite 400 Charlotte, North Carolina 28262 Subject: Exemption from Monitoring During Dormant Status Certificate of Coverage #NCG020863 Vulcan Construction Materials, LP — N. 321 Quarry Caldwell County Dear Mr. Johnson: A Compliance Evaluation hnspection performed at the N. 321 Quarry on May 27, 2021, by personnel from this office verified that no industrial activity was taking place at the time of the inspection. Your recent request to keep the NCG020863 permit, but to discontinue stormwater monitoring is hereby approved based on the following conditions: • There shall be no industrial activities taking place, no stockpiles of raw materials (to include chemical additives) stored on the site, or wastewater or stormwater industrial discharges while the permittee is not monitoring. • No wastewater shall be generated and all wastewater treatment units, if any, shall be cleaned and stabilized, and inactivated as to render them harmless to the environment while the site is dormant. • The Stormwater Pollution Prevention Plan (SWPPP) shall be kept updated to reflect the status of the facility. Updates and conditions of the SWPPP of note are: The BMP Summary shall be reviewed and updated annually. Training programs shall be developed, and training provided at least once a year for facility personnel with responsibilities for: spill response and cleanup, preventative maintenance activities, and for any of the facility's operations that have the potential to contaminate stormwater runoff. All aspects of the Stormwater Pollution Prevention Plan shall be reviewed and updated on an annual basis. The annual update shall include an updated list of significant spills or leaks of pollutants for the previous three years, or the notation that no spills have occurred. The annual update shall include written recertification that the stormwater outfalls have been evaluated for the presence of non-stormwater North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 2090 U.S. Flighmay 70 1 Swannanoa, North Carolina 28778 u—mm.maaonp� �'"'� 828,296.4500 NCG020863, N. 321 Quarry July 30, 2021 Page 2 of 2 discharges. (Should non-stormwater discharges be discovered the permittee shall contact this office as soon as possible but in no case greater than 24 hours or the next business day). o Inspections of the facility and all stormwater systems shall occur as part of the Preventative Maintenance and Good Housekeeping Program at a minimum on a semi-annual schedule. • Qualitative and analytical monitoring actions as described in Part III, Sections A, B, C, D, and E do not have to be conducted — as long as the above conditions and all other permit conditions and limitations are met, including: o The annual permit fee must be paid. Failure to Pay the annual permit fee will be considered a violation of the subject permit. This office must be notified in writing and all components of the stormwater permit requiring updates made at least 30 days prior to commencing any industrial activity on the site, even if they are temporary. A copy of this letter must be maintained with the facility permit and associated plans and records for the life of the permit. Should you have any questions, please contact Shawna Riddle or me at 828-296-4500. Sincerely, J,,., Stanley E. Aike PE Regional En ' eer Land Quality Section ec: Bethany Georgoulias, Environmental Engineer,(bethany.georgouliasCa)nedenr.gov) Compliance Inspection Report Permit: NCG020863 Effective: 05/06/21 Expiration: 06/30/21 Owner : Vulcan Construction Materials LLC SOC: Effective: Expiration: Facility: North 321 Quarry County: Caldwell 3578 Blowing Rock Blvd Region: Asheville Lenoir NC 286457706 Contact Person: Travis Barnes Title: Phone:828-754-5348 Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): 24 hour contact name Related Permits: Inspection Date: 05/27/2021 Primary Inspector: Shawna Riddle Secondary Inspector(s): Certification: Tony Johnson Phone: 704-547-7076 Entry Time 10:OOAM Exit Time: 10:15AM Phone: Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: 0 Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG020B63 Owner - Facility:Vulcan Construction Materials LLC Inspection Date: 05/27/2021 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: I met with Tony Johnson, Environmental Engineer, with Vulcan Materials Company. Mr. Johnson has requested dormancy status for the mine site as discussed during a previous inspection. N. 321 Quarry is not active and disturbed areas have been stablized with groundcover. The site is in compliance with the current mining permit. Vulcan Materials will contiue to pay the annual stormwater fees and understands that in the future if the the site decides to operate - a request must be submitted first to re -instate the stormwater permit. I recommend issuing dormancy stauts for the mine. Page 2 of 3 Permit: NCG020863 Owner - Facility:Vulcan Construction Materials LLC Inspection Date: 05/27/2021 Inspection Type : Compliance Evaluation Reason for Visit: Routine Page 3 of 3