Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW4210704_Plansheet - Other_20210803
CD 0 cv 0 0 66 v cv D TD a.� is a 4-, 0 a 01 3 cn c� J a U 0 rT- U i rn 0 rn CD N i rn 0 CV c� a� w 0 a U C_ O U NOTE: THE CONTRACTOR SHALL OBTAIN A COPY OF THE NPDES STORM WATER PERMIT ISSUED WITH THE GRADING PERMIT AND COMPLY WITH ALL CONDITIONS AND REQUIREMENTS INCLUDING, BUT NOT LIMITED TO, MAINTAINING RAIN GAUGE AT, THE SITE AT ALL TIMES, AND PROVISION OF INSPECTIONS BOX TO HOUSE INSPECTIONS LOGS AND PLANS. INSPECTIONS REQUIRED BY THE NPDES PERMIT MALL BE PROVIDED BY THE OWNER, HOWEVER, THE CONTRACTOR SHALL PROVIDE FOR MAINTENANCE OF EROSION CONTROL DEVICES AS RECOMMENDED IN THE MAINTENANCE INSPECTION LOGS. FLOOD CERTIFICATION The undersigned hereby certifies to the best of his knowledge and belief the location of the subject property has been checked against area HUD/FIA maps and information provided by the Department of Housing and Urban Development and finds that: The subject property is located in a SPECIAL FLOOD HAZARD AREA as determined by HUD/FIA flood map. The subject property is not located In a SPECIAL FLOOD HAZARD AREA as determined by HUD/FIA flood map. The subject property is located in an area which has not been mapped as to flood areas by HUD/FIA. SEDIMENT BASIN 1 SEDIMENT TRAP 2 SEDIMENT TRAP 3 SEDIMENT BASIN 4 SEDIMENT BASIN 5 SEDIMENT TRAP 6 C UNDISTURBED AREA 0.40 0.40 0.40 0.40 0.40 0.40 C DISTURBED AREA 0.50 0.50 0.50 0.50 0.50 0.50 I-10 5.8 in hr 5.8 in hr 5.8 in hr 5.8 in hr 5.8 in hr 5.8 in hr TOTAL AREA 15.80 ac 5.00 ac 5.00 ac 5.77 ac 13.17 ac 1.31 ac DISTURBED AREA 15.00 ac 4.00 ac 4.80 ac 4.80 ac 13.00 ac 1.30 ac Q 10 Q=CIA 45.36 cfs 13.92 cfs 14.38 cfs 16.17 cfs ' 38.09 cfs 3.79 cfs REQUIRED VOLUME V=1800 x DIST. AREA 27000 cf 3600x 14400 cf 3600x 17280 cf 8640 cf 23400 cf 3600x 4680 cf REQUIRES SURFACE AREA SA=325*(Q 16 14741 sf 4524 sf 4675 sf 5255 sf 12381 sf 1233 sf DEPTH 3.6 ft 3.5 ft 3.5 ft 4.3 ft 4.2 ft 3.5 ft TOP POND DIMENSIONS W x L 86 ft x 172 ft 52 ft x 104 ft 56 ft x 112 ft 52 ft x 104 ft 80 ft x 160 ft 32 ft x 64 ft BOTTOM POND DIMENSIONS W x L 72 ft x 158 ft 38 ft x 90 ft 42 ft x 98 ft 35 ft x 87 ft 63 ft x 143 ft 18 ft x 50 ft VOLUME PROVIDED 46937 cf 15449 cf 18179 cf 18122 cf 45886 cf 5159 cf SURFACE AREA PROVIDED 14792 sf 5408 sf 6272 sf 5408 sf 12800 sf 2048 sf AVERAGE AREA 13038.1 sf 4414 sf 5194 sf 4214.3 sf 10925 sf 1474 sf WEIR LENGTH REQUIRED (Q10) L=Q(10)/(3*h-.5) where h = 0.5' 48" RISER 36" BARREL 20' SPILLWAY 14 ft 14 ft 30" RISER 18" BARREL 15' SPILLWAY 42" RISER 30" BARREL 20' SPILLWAY 4 ft SKIMMER SIZE ORIFICE 3" 2.9" 2.5" 2.2 2.5" 2.4" 2" 1.8" 3" 2.7" 1.5" 1.4" CONSTRUCTION SEQUENCE 1. OBTAIN PLAN APPROVAL FROM NCDEQ AND ALL APPLICABLE PERMITS FROM OTHER REVIEWING AGENCIES. 2. FLAGGING OF ALL THE CONSTRUCTION/DENUDED LIMITS AND ANY OTHER BUFFERS SHALL BE PERFORMED PRIOR TO THE PRECONSTRUCTION MEETING. THE CONTRACTOR IS TO STAY WITHIN THE LIMITS OF CONSTRUCTION. ANY NEED TO CROSS THIS LIMIT LINE WILL NEED TO BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO ANY CROSS OVER. THE CLEARING LIMITS MUST BE FLAGGED PRIOR TO THE PRECONSTRUCTION MEETING IN ORDER TO PREVENT ACCIDENTAL ENTRY OUTSIDE THE CLEARING LIMITS. 3. SET UP PRE -CONSTRUCTION MEETING ON SITE PRIOR TO ANY CONSTRUCTION, WITH THE OWNER, WITH ALL CONTRACTORS INVOLVED WITH LAND DISTURBANCE AND THE EROSION CONTROL INSPECTOR. 4. INSTALL STONE CONSTRUCTION ENTRANCE. 5. CLEAR AND GRUB THOSE AREAS NEEDED TO INSTALL EROSION CONTROL MEASURES IN THE SEQUENCE OUTLINED BELOW. EROSION CONTROL DEVICES ARE TO BE INSTALLED BASED ON DETAILS PROVIDED UNDER THE APPROVED PLANS. THE PLANS AND DETAILS ARE BASED ON THE N.C. EROSION AND SEDIMENT PLANNING AND DESIGN MANUAL, AND RECOGNIZED BEST MANAGEMENT PRACTICES (BMP'S). ENSURE POSITIVE DRAINAGE TO ALL STRUCTURES ALONG DIVERSION BERMS. TOPSOIL SHALL BE UTILIZED IN THE SLOPES TO THE EXTENT ALLOWED BY THE GEO-TECH ENGINEER OF RECORD. REMAINING TOPSOIL SHALL BE STORED ON LOTS CLOSE TO GRADE AND AS APPROVED BY THE OWNER. TOPSOIL BERMS MAY ALSO BE UTILIZED IN THE AREAS AND SIZES APPROVED BY THE OWNER. 7. CLEAR ENOUGH TO INSTALL SEDIMENT TRAPS. INSTALL THE SEDIMENT TRAPS. CLEAR AREAS REQUIRED FOR THE INSTALLATION OF DIVERSION BERMS. INSTALL DIVERSION BERMS. 8. INSTALL SILT FENCE BELOW SEDIMENT TRAPS AND SEED ALL DEVERSIONS AND MEASURES. 9. CLEAR AND GRUB REMAINDER OF THE SITE AND BEGIN GRADING. 10. AS THE SITE IS BROUGHT TO GRADE, INSTALL STORM DRAINAGE AND IMMEDIATELY INSTALL INLET PROTECTION MEASURES. 11. STABILIZE THE SITE PER THE TIME TABLES LISTED ON THIS SHEET AS WELL AS SHEET NCGO1. 12. AS THE ROADWAY IS BROUGHT TO GRADE AND DITCHES ARE CUT IN, INSTALL DITCH MATTING PER TABLE ON THIS SHEET. 13. ONCE ROADWAY IS BROUGHT TO GRADE, INSTALL UTILITIES. SEE SHEETS 12 AND 14 FOR ADDITIONAL DETAILS AND SEQUENCING OF THE SEWER LINE INSTALLATION ACROSS THE STREAM. FOLLOWING INSTALLATION OF UTILITIES, REINSTALL MATTING OR RE -SEED PREVIOUSLY STABILIZED AREAS AS NECESSARY. 14. UPON STABILIZATION OF THE SITE, UPON APPROVAL OF THE EROSION CONTROL INSPECTOR, DIVERSION BERMS, SILT FENCE, AND DONUT INLET PROTECTION SHALL BE REMOVED. SEDIMENT TRAPS AND BASINS SHALL BE FILLED. AREAS DISTURBED IN THIS PROCESS SHALL BE STABILIZED. 15. FOLLOWING STABILIZATION OF SITE, REQUEST CLOSURE OF THE GRADING PERMIT FROM THE NCDEQ EROSION CONTROL INSPECTOR. EROSION CONTROL NOTES 1. THE CONTRACTOR SHALL MAINTAIN CLOSE CONTACT WITH THE EROSION CONTROL INSPECTOR. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED THAT ARE NOT INDICATED ON THE PLANS BY THE EROSION CONTROL INSPECTOR. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN EROSION ONSITE, REGARDLESS OF THE MEASURES REQUIRED. ANY CHANGE IN THE EROSION CONTROL MEASURES AND/OR GRADING SHALL BE CALLED TO THE ATTENTION OF THE ENGINEER AND THE EROSION CONTROL INSPECTOR. ALL MEASURES MUST REMAIN OPERABLE UNTIL THE SITE IS STABILIZED. 2. EROSION CONTROL DEVICES SHALL BE DILIGENTLY MAINTAINED THROUGHOUT CONSTRUCTION. DEVICES SHALL BE INSPECTED AND REPAIRED AFTER EACH SIGNIFICANT RAINFALL. 3. SEDIMENT TRAPS/BASINS ARE TO BE CLEANED OUT WHEN THE BASIN IS NO MORE THAN HALF FULL. THEY SHALL BE CLEARED OF ALL SILT AND RESHAPED TO THE ORIGINAL DESIGN PARAMETER. 4. GRASS OR OTHERWISE STABILIZE ALL AREAS AS THEY ARE BROUGHT UP TO GRADE. STABILIZE WITH GROUND COVER. (SEE G.C. PLAN NOTES FOR STABILIZATION REQUIREMENTS.) 5. STABILIZE WITH GROUND COVER ALL SLOPES, CUT OF FILL, WITHIN THE TIMEFRAME LISTED ON THE ADJOINING TABLE. 6. ALL EROSION CONTROL DEVICES ARE TO REMAIN IN THE PLACE UNTIL THE SITE IS PROPERLY STABILIZED WITH GROUND COVER. ALL UPSTREAM AREAS MUST BE STABILIZED PRIOR TO REMOVAL OF EROSION CONTROL DEVICES. ONCE THIS OCCURS, REMOVE SEDIMENT GRADE TO FINAL ELEVATIONS AND STABILIZE. 7. REMOVE EROSION CONTROL DEVICES ONLY UPON RECEIPT OF APPROVAL FROM EROSION CONTROL INSPECTOR. 8. IF FILL MATERIALS ARE TO BE BROUGHT ONTO THIS PROJECT OR WASTE MATERIALS ARE TO BE TAKEN FROM THIS PROJECT, THIS INFORMATION MUST BE DISCLOSED AND SHOWN ON THE EROSION CONTROL AND GRADING PLAN. BORROW AREAS AND DUMP SITES ARE CONSIDERED TO BE PART OF THIS PROJECT AND THE OWNER IS RESPONSIBLE FOR STABILIZATION AND EROSION CONTROL MEASURES AT THESE SITES. 9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SITE EROSION CONTROL MAINTENANCE DURING CONSTRUCTION. IN ADDITION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ALL ITEMS/RECORDS REQUIRED BY THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT. 10. AS OF MARCH 10, 2003, ALL CONSTRUCTION SITES ONE (1) ACRE OR MORE, REQUIRES A NPDES PERMIT. THEREFORE: -WRITTEN DOCUMENTATION OF A DEVIATION FROM APPROVED PLAN MUST BE NOTED ON THE APPROVED PLANS. -WRITTEN DOCUMENTATION OF AN EMERGENCY SITUATION WHERE SEDIMENT HAS BEEN DISCHARGED OFF SITE MUST BE RECORDED. ALSO, CONTRACTOR'S ACTIONS TO REPAIR AND RETURN AREA TO PRE -STORM CONDITION MUST BE RECORDED. -THE PERMITTEE SHALL INSPECT ALL EROSION AND SEDIMENTATION CONTROL FACILITIES EVERY SEVEN DAYS AND WITHIN 24 HOURS OF A 1 INCH RAINFALL. FINDINGS SHALL BE RECORDED AND PRESENTED UPON INSPECTOR'S REQUEST. -THE CONTRACTOR SHALL PROVIDE RAIN -RECORDING DEVICE AND RECORD EACH RAINFALL. -ANY FAILURES THAT CAUSE VISIBLE SEDIMENTATION TO LEAVE THE APPROVED DISTURBED LIMITS SHALL BE CORRECTED IMMEDIATELY AND DOCUMENTED. -A COPY OF THE NPDES PERMIT SHOULD BE KEPT ON SITE FOR REFERENCE. 11. THE CONTRACTOR SHALL HAVE ON SITE THE MEANS TO REMOVE ANY SEDIMENT TRACKED ONTO THE STREET. IF CONDITIONS REQUIRE, EQUIPMENT MUST BE ON SITE TO WASH TIRES OF VEHICLES PRIOR TO ENTERING STREET. RIP -RAP APRONS LENGTH FT WIDTH FT DEPTH FT CLASS TEMP 1-2 50 9 2.0 1 FES 2-1 A 16 6 2.0 1 FES 4-1 20 6 3.0 1 2 FES 5-1 20 8 2.0 1 1 FES 6-1 12 5 2.0 1 1 FROM TOP/THROAT ELEV INV OUT TO INV IN I AREA SUB TOTAL C Tc I10 Q10=CIA CFS Q10(total) PIPE HW/D PIPE DIAM. IN LENGTH L.F. SLOPE 1-13 793.54 789.72 1-12 789.22 1.17 1.2 0.70 5 5.8 1 4.8 4.8 1.1 15 42.00 1.19% 1-12 793.54 788.87 1-10 81.07 1.41 2a__ 0.70 5 5.8 5.7 10.5 1.5 18 260.00 3.00% 1-11 785.32 781.57 1-10 781.07 0.86 0.9 170 5 5.8 3.5 3.5 1.0 15 42.00 1.19% 1-10 785.32 780.57 1-8 766.80 1.79 5.2 0.70 5 5.8 7.3 21.2 1.5 24 335.00 4.11 % 1-9 770.10 766.70 1-8 766.17 0.63 0.6 0.70 5 5.8 2.6 6 1.1 15 44.33 1. 0% 1-8 771. 765.17 1-4 762.35 0.56 .4 0.7 5 5. 2.3 26.1 1. 30 70.00 4.03% 1-7A 787.89 783.52 1-7 783.01 1.4 1.4 .70 5 5.8 5.8 1.3 15 42.13 1. 1% 1-7 787.71 782.81 1- 75.78 0.97 4 0.70 5 5.8 3.9 .7 1.418 130.19 .40% -6 780.02 775.28 1-5 773.38 0.39 .8 0.70 5 5.8 .6 11.3 1.0 24 49.90 3.81% 1-5 778.43 773.18 1-4 762.85 0.70 3.5 0.70 5 5.8 2.8 14.1 1.1 24 108.77 .50% 1-4 767.86 761.85 1-3 743.10 0.37 10.3 0.70 5 5.8 1 1.5 41.7 1.1 36 250.00 7.50% 1-3 748.61 742.60 1-2 742.18 0.10 10.4 0.70 5 5.8 0.4 42.1 1.1 36 42.00 1.00% 1-2 748.61 741.98 1-1 730.24 0.78 11.2 0.70 5 5.8 3.2 45.3 1.3 36 168.20 6.98% 1-1 735.50 728.94 EX B 722.45 0.44 11.6 0.70 5 5.8 1.8 47.1 1.3 36 68.35 9.50% EX B 728.70 720.45 EX A 717.48 9.26 20.9 0.50 5 5.8 26.9 73.9 2.4 36 174.00 1.71 % EX A 724.30 717.45 42 OUT 716.50 1.12 22.0 0.70 5 5.8 4.5 78.5 1.5 42 97.00 0.98% n� n� 70 r, 2-6 757.50 754.51 2-5 751.65 0.76 0.8 1 0.70 5 5.8 3.1 3.1 0.9 15 92.17 3.10% 2-5 755.79 750.65 2-4 749.24 0.37 1.1 0.70 5 5.8 1.5 4.6 1.1 15 54.71 2.58% 2-4 753.45 749.04 2-2 736.41 0.36 1.5 0.70 5 5.8 1.5 6.0 1.5 15 214.15 5.90% 2-3 740.51 736.91 2-2 736.41 0.92 0.9 0.70 5 5.8 3.7 3.7 1.0 15 42.00 1.19% 2-2 740.51 736.21 2-1 735.17 0.61 3.0 0.70 5 5.8 2.5 12.3 1.8 18 104.31 1.00% 2-1 1 741.00 1 734.97 2-1A 733.18 0.00 1 3:0 0.55 5 5.8 0.0 1 12.3 1.3 18 179.00 zn7 17 Z 4-7 788.33 784.73 4-6 783.40 1.07 1.1 0.70 5 5.8 4.3 4.3 1.1 15 44.17 3.01% 4-6 787.59 783.20 4-4 773.50 1.08 2.2 0.70 5 5.8 4.4 8.7 1.3 18 181.33 5.35% 4-5 777.79 774.01 4-4 773.50 0.61 0.6 0.70 5 5.8 2.5 2.5 0.8 15 42.75 1.19% 4-4 777.79 773.00 4-3 767.82 0.80 3.6 0.70 5 5.8 3.2 14.5 1.1 24 103.48 5.01% 4-3 772.60 767. 4-2 1 766.44 0.9 45 0.70 5 5.8 .9 .4 1.3 24 117.7 1.00% 4-2 776.00 763.63 4-1 742.00 0.47 5.0 0.70 5 5.8 1.9 1 20.3 1 1.5 1 24 108.13 1 20.00% A Oh 'Jn _J; 5-9 793.71 789.30 5-8 787.40 1.79 1.8 0.70 5 1 5.8 1 7.3 7.3 1.6M30228.68 3.80% 5-8 791.41 786.90 5-6 776.58 1.33 3.1 0.70 5 5.8 5.4 12.7 1.14.80% 5-7* 781.59 777.59 5-6 777.08 2.01 2.0 0.70 5 5.8 8.2 8.2' 1.21.21 % 5-6 781.59 776.08 5-4 768.20 0.49 5.6 0.70 5 5.8 2.0 22.8 1.1 3.45% 5-5* 773.49 769.50 5-4 769.00 2.61 2.6 0.70 5 5.8 10.6 10.6 1.51.19% 5-4 773.49 768.00 5-3 766.85 1.18 9.4 0.70 5 5.8 4.8 38.2 1.61.00% 5-3 777.00 764.96 1 5-2 1 753.50 1 0.16 9.6 0.70 1 5 1 5.8 1 0.6 38.9 1.6 30 76.43 1 14.99% 5-2 753.10 5-1 752.00 0.00 9.R 0.70 5 1 5.8 0.0 38.9 1.6 30 27.52 1 4.00% *DOUBLE INLET 9.57 38.9 6-5 774.65 771.10 6-3 768.67 0.38 4 0 5 5.8 1.5 1 1.5 0.5 15 60.81 4.0 % 6-4 769.85 766.0 6-3 765.17 0.98 0.70 5 5.8 4.0 4.0 0. 1 8 .45 0.99% 6-3 773.20 764.97 6-2 763.67 0.45 1.8 0.7 5 5,8 1.8 73 1.0 18 0 1.0 6-2 775.00 763.47 6-1 750.00 0.44 2. 0.7 5 5.8 1.8 9.1 1.4 18 94.87 14. 0% NOTE: NOTE: C.M.P. = CORRUGATED METAL PIPE OWNER SHALL PROVIDE SOILS ENGINEER TO 8' TOP WIDTH APPROVE SUBGRADE AND KEYWAY PRIOR TO ANY FILL MATERIAL BEING PLACED. ALL EL. = 740.0 FILL MATERIAL AND COMPACTION WILL ALSO TRASH RACK BE MONITORED BY SOILS ENGINEER TO BE TOP OF RISER PROVIDED BY OWNER.AN EL. = 737.5 60"x60" ANTI SEEP COLLAR EMER. SPILL. EL. = 738.5 C.M.P -J 1 11 TEMP. 3 FAIRCLOTH SKIMMER W/ 2.9 ORIFICE RISE 2.5 2.5 " W/ 4" SCHD 40 PVC BARREL 4" FLEXIBLE HOSE AND 4" STEEL NIPPLE 6" C.A.P. STUBBED OUT OF 48 L.F. 36" CMP ® 1.0% RISER 12" AT ELEV 733.9 WITH REMOVABLE 6" PLATE WITH 4" THREADED HOLE TO :�`,: `: FLANGED JDINT RECEIVE THE 4" NIPPLE WITH GASKET (2) #8 REBAR PREFABRICATED BARREL TO RISER BOTTOM EL. (WATERTIGHT CONNECTION) 732.9 INV. EL = 733.9 6.5'(W)x6.5'(W)x2.0'(H)=84 CF NOT TO SCALE 3000 PSI CONCRETE POURED IN AND AROUND BASE SECTION SEDIMENT BASIN No. 1 INV OUT EL. = 733.4 NOTE: NOTE: C.M.P. = CORRUGATED METAL PIPE OWNER SHALL PROVIDE SOILS ENGINEER TO 8' TOP WIDTH APPROVE SUBGRADE AND KEYWAY PRIOR TO ANY FILL MATERIAL BEING PLACED. ALL EL. = 728.3 FILL MATERIAL AND COMPACTION WILL ALSO TRASH RACK EMER. SPILL. BE MONITORED BY SOILS ENGINEER TO BE PROVIDED BY OWNER. TOP OF RISER EL = 726.8 EL. = 725.8 66"x66" ANTI 30" SEEP COLLAR TEMP. 2" FAIRCLOTH SKIMMER W/ .8" ORIFICE RISE 2.5 1 1 5 W/ 4" SCHD 40 PVC BARREL 4" FLEXIBLE HOSE AND 4" STEEL NIPPLE 6" C.A.P. STUBBED OUT OF 45 L.F. 18" CMP @ 1.1% RISER 12" AT ELEV 721.5 WITH REMOVABLE 6" PLATE INV OUT WITH 4" THREADED HOLE TO ''y ": FLANGED OINT EL. = 721.0 RECEIVE THE 4" NIPPLE WITH GAS ET (2) #8 REBAR PREFABRICATED BARREL TO RISER BOTTOM EL. (WATERTIGHT CONNECTION) 720.5 INV. EL = 721.5 4'(W)x4'(W)x2'(H)=32 CF NOT TO SCALE 3000 PSI CONCRETE POURED IN AND AROUND BASE SECTION SEDIMENT BASIN No. 4 2.25 y.-I NEW STABILIZATION TIME FRAMES SITE AREA DESCRIPTION STABILIZATION TIME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES AND SLOPES 7 DAYS NONE HIGH QUALITY WATER (HWQ) ZONES 7 DAYS NONE SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH, AND ARE NOT STEEPER THAN 2: 1. 14 DAYS ARE ALLOWED. SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS NONE, EXCEPT FOR PERIMETERS AND HOW ZONES **BANDED GASKETS ARE ALLOWED IN LIEU OF FLANGED JOINT FOR ALUMINIZED STEEL PIPE. MINIMUM BAND WITH OF 24" WITH STRAP AND ANCHOR TO CONCRETE BASE. NOTE: OWNER SHALL PROVIDE SOILS ENGINEER TO APPROVE SUBGRADE AND KEYWAY PRIOR TO ANY FILL MATERIAL BEING PLACED. ALL FILL MATERIAL AND COMPACTION WILL ALSO BE MONITORED BY SOILS ENGINEER TO BE PROVIDED BY OWNER. TEMP. 3" FAIRCLOTH SKIMMER W/ 2.7" ORIFICE W/ 4" SCHD 40 PVC BARREL 4" FLEXIBLE HOSE AND 4" STEEL NIPPLE NOTE: C.M.P. = CORRUGATED METAL PIPE 8' TOP WIDTH EL. = 752.2 TRASH RACK TOP OF RISER EL. = 749.7 60"x6O" ANTI 42�� SEEP COLLAR C.M.P RISE -J 1 2.5 I 4" C.A.P. STUBBED OUT OF RISER 12" AT ELEV 745.5 WITH REMOVABLE 6" PLATE EMER. SPILL. EL. = 750.7 42 L.F. 30"1 CMP ® 1.2% WITH 4" THREADED HOLE TO f :„ �.,;1"',- 5�_ FLANGED ..JOINT RECEIVE THE 4" NIPPLE WITH GASI9ET (2) #8 REBAR PREFABRICATED BARREL TO RISER BOTTOM EL. (WATERTIGHT CONNECTION) 744.5 INV. EL = 745.5 5.7'(W)x5.7'(W)x2.0'(H)=65 CF NOT TO SCALE 3000 PSI CONCRETE POURED IN AND AROUND BASE SECTION SEDIMENT BASIN No. 5 1L 2.5 INV OUT EL. = 745.0 SWALE NO. AREA I 10 C Q 10 BOTTOM WIDTH IT SS RT SS SLOPE LINDIG n DEPTH VEL SHEAR STRESS WP A MATERIAL 1-13 1.17 5.8 0.7 4.4 1.0 3: 1 3 : 1 2.0% EXCEL R-1 0.066 0.55 1.99 0.69 4.5 2.2 1-13 1.17 5.8 0.7 4.4 1.0 3: 1 3: 1 2.0% VEGETATED 0.035 0.33 3.42 0.41 3.1 1.3- 1-12 1.41 5.8 0.7 5.3 1.0 3 : 1 3 : 1 2.0% EXCEL R-1 0.066 0.65 2.03 0.81 5.1 2.6 1-12 1.41 5.8 0.7 5.3 1.0 3: 1 3: 1 2.0% VEGETATED 0.035 0.38 3.52 0.47 3.4 1.5 1-11 0.86 5.8 0.7 3.2 1.0 3 : 1 3 : 1 2.6% EXCEL R-1 0.066 0.38 2.13 0.62 3.4 1.5 1-11 0.86 5.8 0.7 3.2 1.0 3: 1 3: 1 2.6% VEGETATED 0.035 0.23 3.57 0.37 2.5 0.9 1-10A 1.20 5.8 0.7 4.5 1.0 3 : 1 3 : 1 2.6% EXCEL R-1 0.066 0.51 2.24 0.83 4.2 2.0 1-10A 1.20 5.8 0.71 4.5 1.0 3: 1 3: 1 2.6% IVEGETATED 0.0351 0.30 3.81 0.49 2.9 1.2 1-10B 1.79 1 5.8 0.7 6.7 1.0 3 : 1 3 : 1 2.6% EXCEL S-2 0.066 0.72 2.35 1.17 5.6 2.9 1-10B 1.79 5.8 0.7 6.7 1.0 3: 1 3: 1 2.6% VEGETATED 0.035 0.42 4.08 0.67 3.6 1.7 1-9A 0.39 5.8 0.7 1.5 1.0 3 : 1 3 : 1 4.8% EXCEL R-1 0.066 0.16 2.30 0.48 2.0 0.6 1-98 0.39 5.8 1 0.7 1.5 1.0 3 : 1 3 : 11 4.8% VEGETATED 0.035 0.10 3.65 0.30 1.6 0.4 1-9B 0.63 5.8 0.7 2.4 1.0 3 : 1 3 : 1 4.8% EXCEL S-2 0.066 0.23 2.57 0.69 2.5 0.9 1-9B 0.63 5.8 0.7 2.4 1.0 3: 1 3: 1 4.8% VEGETATED 0.035 0.14 4.15 0.42 1.9 0.6 1-8.1 0.14 5.8 0.7 0.5 1.0 3 : 11 3 : 1 7.4% EXCEL R-1 0.066 0.07 1.99 0.30 1.4 0.3 1-8.1 0.14 5.8 0.7 0.5 1.0 3: 11 3: 1 7.4% VEGETATED 0.035 0.04 3.05 0.20 1.3 0.2 1-8.2 0.42 1 5.8 0.7 1.6 1.0 3 : 1 3 : 1 4.8% EXCEL R-1 0.066 0.17 2.35 0.51 2.1 0.7 1-8.2 0.42 1 5.8 0.7 1.6 1.0 3: 1 3: 11 4.8% VEGETATED 0.035 0.11 3.72 0.31 1.7 0.4 1-7A-A 0.40 1 5.8 0.7 1.5 1.0 3 : 1 3 : 11 5.3% EXCEL R-1 0.066 0.16 2.40 0.52 2.0 0.6 1-7A-A 0.40 1 5.8 0.7 1.5 1.0 3: 1 3: 11 5.3% VEGETATED 0.035 0.10 3.84 0.33 1.6 0.4 1-78-8 1.42 5.8 0.7 5.4 1.0 3 : 1 3 : 1 5.3% EXCEL S-2 0.066 0.43 3.11 1.42 3.7 1.7 1-7A-B 1.42 5.8 0.7 5.4 1.0 3: 1 3: 1 5.3% VEGETATED 0.035 0.26 5.26 0.86 2.6 1.0 1-7A 0.40 5.8 0.7 1.5 1.0 3 : 1 3 : 1 5.3% EXCEL R-1 0.066 0.16 2.40 0.52 2.0 0.6 1-7A 0.40 5.8 0.7 1.5 1.0 3: 11 3: 1 5.3% VEGETATED 0.035 0.10 3.84 0.33 1.6 0.4 1-7B 0.97 5.8 0.7 1 3.7 1.0 3 : 11 3 : 1 5.3% EXCEL S-2 0.066 0.32 2.92 1.04 3.0 1.3 1-7B 0.97 5.8 0.7 1 3.7 1.0 3: 1 3: 1 5.3% VEGETATED 0.035 0.19 4.82 0.63 2.2 0.8 1-6A 0.32 5.8 0.7 1.2 1.0 3 : 1 3 : 1 6.1% EXCEL R-1 0.066 0.13 2.38 0.48 1.8 0.5 1-6A 0.32 5.8 0.7 1.2 1.0 3: 1 3: 1 6.1% VEGETATED 0.035 0.08 3.74 0.30 1.5 0.3 1-6B 0.39 5.8 0.7 1.5 1.0 3 : 1 3 : 11 6.1% EXCEL S-2 0.066 0.15 2.54 0.57 1.9 0.6 1-6B 0.39 5.8 0.7 1.5 1.0 3: 1 3: 1 6.1% VEGETATED 0.035 0.10 4.03 1 0.36 1.6 1 0.4 1-5A 0.40 5.8 0.7 1.5 1.0 3 : 1 3 : 1 5.0% EXCEL R-1 0.0661 0.16 2.35 0.50 2.0 0.6 1-5A 0.40 5.8 0.7 1.5 1.0 3: 1 3: 1 5.0% VEGETATED 0.035 0.10 3.73 0.31 1.6 0.4 1-5B 0.70 1 5.8 0.7 2.6 1.0 3 : 1 3 : 1 5.0% EXCEL S-2 0.066 0.25 2.68 0.78 2.6 1.0 1-58 0.70 5.8 0.7 2.6 1.0 3: 11 3: 1 5.0% VEGETATED 0.035 0.15 4.34 0.47 1.9 0.6 1-4A 0.20 5.81 0.7 0.8 1.0 3 : 11 3 : 1 10.0% EXCEL R-1 0.066 0.08 2.47 0.47 1.5 0.3 1-4A 0.20 5.8 1 0.7 0.8 1.0 3: 11 3: 1 10.0% IVEGETATED 0.035 0.05 1 3.83 0.31 1.3 0.2 1-4B 0.37 5.8 1,0.7 1.4 1.0 3 : 11 3 : 1 10.0% EXCEL S-2 0.066 0.12 3.00 0.75 1.8 0.5 1-413 0.37 5.8 0.7 1.4 1.0 3: 11 3: 1 10.0% VEGETATED 0.035 0.08 4.66 0.47 1.5 0.3 1-3 0.10 5.8 0.7 0.4 1.0 3 : 1 3 : 1 7.87 EXCEL R-1 0.066 0.06 1.88 0.27 1.3 0.2 1-3 0.10 5.8 0.7 0.4 1.0 3 : 1 3 : 1 7.8% VEGETATED 0.035 0.04 2.81 0.17 1.2 0.1 1-2A 0.24 5.8 0.7 0.9 1.0 3 : 1 3 : 11 7.8% EXCEL R-1 0.066 0.10 2.42 0.46 1.6 0.4 1-28 0.24 5.8 0.7 0.9 1 1.0 3 : 1 3 : 1 7.8% VEGETATED 0.035 0.06 3.71 0.29 1.4 0.2 1-2B 0.78 5.8 0.7 2.9 1 1.0 3 : 1 3 : 1 7.8% EXCEL S-2 0.066 0.23 3.26 1.10 2.4 0.9 1-2B 0.78 5.8 0.7 2.9 1.0 3: 11 3: 1 7.8% VEGETATED 0.035 0.14 5.29 0.68 1.9 0.6 1-1A 0.24 5.8 0.7 0.9 1.0 3 : 1 3 : 1 8.2% EXCEL R-1 0.066 0.10 2.48 0.49 1.6 0.4 1-1A 0.24 5.8 0.7 0.9 1.0 3: 1 3: 1 8.27. VEGETATED 0.035 0.06 3.80 0.31 1.4 0.2 1-1B 0.44 5.8 0.7 1.7 1.0 3 : 1 3 : 11 8.2% EXCEL S-2 0.066 0.15 2.91 0.74 1.9 1 0.6 1-1B 0.44 5.8 0.7 1.7 1.0 3: 1 3: 1 8.2% VEGETATED 0.035 0.09 4.57 0.46 1.6 0.4 EX B 0.15 5.8 0.7 0.6 1 1.0 3 : 1 3 : 1 9.5% EXCEL R-1 0.066 0.06 2.17 0.36 1.4 0.2 EX B 0.15 5.8 0.7 0.6 1 1.0 3 : 1 3 ; 1 9.5% VEGETATED 0.035 0.04 3.33 0.24 1.3 0.2 EX A 0.50 5.8 0.7 1.9 1.0 3 : 1 3 : 1 1.5% 1EXCEL R-1 0.066 0.31 1.54 0.29 2.9 1.2 EX A 0.50 5.8 0.7 1.9 1.0 3 : 1 3 : 1 1.5% VEGETATED 0.035 0.19 2.54 0.17 2.2 0.7 2-6 0.76 5.8 0.7 2.9 1.0 3 : 1 3 : 1 3.2% EXCEL R-1 0.066 0.32 2.28 0.64 3.0 1.3 2-6 0.76 5.8 0.7 2.9 1.0 3 : 1 3 : 11 3.2% VEGETATED 0.035 0.19 3.75 0.38 2.2 0.8 2-5 0.37 5.8 0.7 1.4 1.0 3 : 1 3 : 11 6.3% EXCEL R-1 0.066 0.14 2.52 0.55 1.9 0.6 2-5 0.37 5.8 0.7 1.4 1.0 3: 1 3: 1 6.3% IVEGETATED 0.035 0.09 3.97 0.35 1.6 0.4 2-4A 0.29 5.8 0.7 1.1 1.0 3 : 1 3 : 1 7.4% EXCEL R-1 0.066 0.11 2.50 0.51 1.7 0.4 2-4A 0.29 5.8 0.7 1.1 1.0 3 ; 1 3 : 1 7.4% VEGETATED 0.035 0.07 3.88 0.32 1.4 0.3 2-46 0.36 5.8 0.7 1.4 1.0 3 : 1 3 : 1 7.4% EXCEL S-2 0.066 0.13 2.66 0.60 1.8 0.5 2-4B 0.36 5.8 0.7 1.4 1.0 3: 1 3: 1 7.4% VEGETATED 0.035 0.08 4.17 0.38 1.5 0.3 2-3A 0.40 5.8 0.7 1.5 1.0 3 : 1 3 : 1 5.3% EXCEL R-1 0.066 0.16 2.40 0.51 2.0 0.6 2-3A 0.40 5.8 0.7 1.5 1.0 3: 1 3: 1 5.3% VEGETATED 0.035 0.10 3.84 0.33 1.6 0.4 2-3B 0.92 5.8 0.7 3.5 1.0 3 : 1 3 : 1 5.3% EXCEL S-2 0.066 0.30 2.89 0.99 2.9 1.2 2-3B 0.92 5.8 0.7 3.5 1.0 3: 1 3: 1 5.3% VEGETATED 0.035 0.19 4.78 0.61 2.2 0.7 2-2A 0.40 5.8 0.7 1.5 1.0 3 : 1 3 : 1 5.3. EXCEL R-1 0.066 0.16 2.40 0.52 2.0 0.6 2-2A 0.40 5.8 1 0.7 1.5 1.0 3: 1 3: 11 5.3% VEGETATED 0.035 0.10 3.84 0.33 1.6 0.4 2-2B 0.61 5.8 0.7 2.3 1.0 3 : 1 3 : 11 5.3% 1EXCEL S-2 0.066 0.22 2.67 0.73 2.4 0.9 2-2B 0.61 5.8 0.7 2.3 1.0 3: 1 3: 1 5.3% VEGETATED 0.035 0.14 4.31 0.45 1.9 0.5 4-7A 0.40 5.8 0.7 1.5 1.0 3 : 11 3 : 11 5.2% EXCEL R-1 0.066 0.16 2.40 0.52 2.0 0.6 4-78 0.40 5.81 0.7 1.5 1.0 3: 1 3: 11 5.2% VEGETATED 0.035 0.10 3.80 0.32 1.6 0.4 4-7B 1.07 5.8 1 0.7 4.0 1.0 3 : 1 3 : 11 5.2% EXCEL S-2 0.066 0.34 2.94 1.10 3.2 1.4 4-7B 1.07 5.8 10.7 4.0 1.0 3: 1 3: 11 5.2% VEGETATED 0.035 0.21 4.89 0.67 2.3 0.8 4-6A 0.40 5.8 1 0.7 1.5 1.0 3 : 1 3 : 11 5.2% EXCEL R-1 0.066 0.16 2.40 0.52 2.0 0.6 4-6A 0.40 5.8 1 0.7 1.5 1.0 3: 1 3: 11 5.2% VEGETATED 0.035 0.10 3.80 0.32 1.6 0.4 4-6B 1.08 5.8 10.7 4.1 1.0 3 : 1 3 : 11 5.2% EXCEL S-2 0.066 0.35 2.95 1.12 3.2 1.4 4-613 1.08 5.8 1 0.7 4.1 1.0 3: 1 3: 1 5.2% VEGETATED 0.035 0.21 4.92 0.68 2.3 0.8 4-5A 0.40 5.8 1 0.7 1.5 1.0 3 : 1 3 : 1 5.2% EXCEL R-1 0.066 0.16 2.40 0.52 2.0 0.6 4-5A 0.40 5.810.7 1.5 1.0 3: 1 3: 1 5.2% VEGETATED 0.035 0.10 1 3.80 0.32 1.6 0.4 4-5B 0.61 5.8 1 0.7 2.3 1.0 3 : 1 3 : 1 5.2% EXCEL S-2 0.066 0.22 1 2.64 0.71 2.4 0.9 4-5B 0.61 5.81 0.7 2.3 1.0 3: 1 3 1 5.2% IVEGETATED 0.035 0.14 1 4.27 0.44 1.9 0.5 4-4A 0.40 5.8 0.7 1.5 1.0 3 : 11 3 : 1 5.2% EXCEL R-1 0.066 0.16 2.40 0.52 2.0 0.6 4-4A 0.40 5.8 0.7 1.5 1.0 3: 1 3: 1 5.2% VEGETATED 0.035 0.10 3.80 0.32 1.6 0.4 4-4B 0.80 5.8 0.7 3.0 1.0 3 : 1 3 : 1 5.2% EXCEL S-2 0.066 0.28 2.80 0.89 2.7 1.1 4-413 0.80 5.8 0.7 3.0 1.0 3: 1 3: 1 5.2% VEGETATED 0.035 0.17 4.57 0.54 2.0 0.7 4-3.1A 0.33 5.8 0.7 1.2 1 1.0 3 : 1 3 : 1 6.4% EXCEL R-1 0.066 0.13 2.48 0.52 1.8 0.5 4-3.1A 0.33 5.81 0.7 1.2 1 1.0 3: 1 3: 1 6.4% IVEGETATED 0.035 0.08 3.83 0.32 1.5 0.3 4-3.1B 0.46 5.8 10.7 1.7 1 1.0 3 : 1 3 : 1 6.4% 1EXCEL S-2 0.066 0.16 2.67 0.64 2.0 0.6 4-3.1B 0.46 5.8 0.7 1.7 1.0 3: 1 3: 1 6.4% VEGETATED 0.035 0.10 4.28 0.42 1.7 0.4 4-3.2 0.50 5.8 0.7 1.9 1.0 3 : 1 3 : 1 3.6% EXCEL R-1 0.066 0.22 2.19 0.48 2.4 0.9 4-3.2 0.50 5.8 0.7 1.9 1.0 3: 1 3: 1 3.6% VEGETATED 0.035 0.14 3.55 0.30 1.9 0.5 4-2 0.47 5.8 0.7 1.8 1.0 3 : 1 3 : 1 2.0% EXCEL R-1 0.066 0.26 1.71 0.32 2.6 1.0 4-2 0.47 5.8 0.7 1.8 1.0 3: 1 3: 1 2.0% VEGETATED 0.035 0.16 2.81 0.20 2.0 0.6 5-9.1 0.30 5.8 0.7 1.1 1.0 3 : 1 3 : 1 3.7% EXCEL R-1 0.066 0.15 1.96 0.33 1.9 0.6 5-9.1 0.30 5.8 0.7 1.1 1.0 3: 1 3: 11 3.7% VEGETATED 0.035 0.09 3.10 0.21 1.6 0.4 5-9.2 1.49 5.8 0.7 5.6 1.0 3 : 1 3 : 1 1.2% EXCEL R-1 0.066 0.86 1.63 0.64 6.4 3.4 5-9.2 1.49 5.8 0.7 5.6 1.0 3: 1 3: 1 1.2% VEGETATED 0.0351 0.50 2.86 1 0.37 4.1 2.0. 5-8 1.33 5.8 0.7 5.0 1.0 3 : 1 3 : 1 1.2% EXCEL R-1 0.0661 0.78 1.61 0.58 5.9 3.1 5-8 1.33 5.8 0.7 5.0 1.0 3: 1 3: 1 1.2% VEGETATED 0.035 0.45 2.81 0.33 3.8 1.8 5-7A 0.55 5.8 0.7 2.1 1.0 3 : 11 3 : 1 4.6% EXCEL R-1 0.066 0.21 2.45 0.60 2.3 0.8 5-7A 0.55 5.8 0.7 2.1 1.0 3: 1 3: 1 4.6% IVEGETATED 0.035 0.13 3.96 0.37 1.8 0.5 5-7B 2.01 5.8 0.7 7.6 1.0 3 : 1 3 : 1 4.6% 1EXCEL S-2 0.066 0.62 3.07 1.78 4.9 2.5 5-7B 2.01 5.8 0.7 7.6 1.0 3: 1 3: 1 4.6% IVEGETATED 0.035 0.36 5.28 1.03 3.3 1.4 5-6 0.49 5.8 0.7 1.8 1.0 3 : 1 3 : 1 4.6% EXCEL R-1 0.066 0.20 2.40 0.56 2.2 0.8 5-6 0.49 5.8 0.7 1.8 1.0 3: 1 3: 1 4.6% VEGETATED 0.035 0.12 3.84 0.34 1.8 0.5 5-5.1 1.25 5.8 0.7 4.7 1.0 3: 11 3: 1 1.9% EXCEL R-1 0.066 0.60 1.96 0.71 4.8 2.4 5-5.1 1.25 5.8 0.7 4.7 1.0 3: 1 3: 1 1.9% VEGETATED 0.035 0.35 3.37 0.41 3.2 1.4 5-5.2A 1.00 5.8 0.7 3.8 1.0 3 : 1 3 : 11 2.8% EXCEL R-1 0.066 0.42 2.25 1 0.73 3.7 1.7 5-5.2A 1.00 5.8 0.7 3.8 1.0 3: 1 3: 1 2.8% VEGETATED 0.035 0.25 3.79 0.44 2.6 1.0 5-5.2B 1.36 5.8 0.7 5.1 1.0 3 : 1 3 : 1 2.8% EXCEL S-2 0.066 0.55 2.35 0.96 4.5 2.2 5-5.2B 1.36 5.8 0.7 5.1 1.0 3 : 1 3 : 1 2.8% VEGETATED 0.035 0.32 4.02 0.56 3.0 1.3 5-4.1 0.50 5.8 0.7 1.9 1.0 3 : 1 3 : 1 1.9% EXCEL R-1 0.066 0.28 1.70 0.33 2.8 1.1 5-4.1 0.50 5.8 0.7 1.9 1.0 3: 1 3: 1 1.9% VEGETATED 0.035 0.17 2.79 0.20 2.1 0.7 5-4.2 0.68 5.8 0.7 2.6 1.0 3 : 1 3 : 1 2.8% EXCEL R-1 0.066 0.31 1 2.11 0.53 2.9 1.2 5-4.2 0.68 5.8 0.7 2.6 1.0 3: 1 3: 1 2.8% VEGETATED 0.035 0.19 1 3.48 0.32 2.2 0.7 5-3 0.16 5.8 0.7 0.6 1.0 3 : 1 3 : 1 2.0% EXCEL R-1 0.066 0.12 1 1.32 0.14 1.7 0.5 5-3 0.16 5.8 0.7 0.6 1.0 3: 1 3: 1 2.0% VEGETATED 0.035 0.07 2.06 0.09 1.5 0.3 6-5 0.38 5.8 0.7 1.4 1.0 3 : 1 3 : 11 2.9% EXCEL R-1 0.066 0.19 1.89 0.34 2.2 0.8 6-5 0.38 5.8 0.7 1.4 1.0 3: 1 3: 11 2.9% VEGETATED 0.035 0.12 3.05 0.22 1.8 1 0.5 6-4.1 0.65 5.8 0.7 2.5 1.0 3 : 1 3 : 1 3.3% EXCEL R-1 0.066 0.28 2.23 0.57 2.7 1.1 6-4.1 0.65 5.81 0.7 2.5 1 1.0 3: 1 3: 1 3.3% VEGETATED 0.035 0.17 3.68 0.35 2.1 0.7 6-4.2 0.33 5.81 0.7 1.2 1.0 3 : 1 3 : 1 5.1% EXCEL R-1 0.066 0.14 2.27 0.45 1.9 0.6 6-4.2 0.33 5.8 0.7 1.2 1.0 3 : 1 3 : 1 5.1 % VEGETATED 0.035 0.09 3.55 0.28 1.6 0.3 6-3 0.45 5.8 0.7 1.7 1.0 3 : 1 3 : 1 3.7% EXCEL R-1 0.066 0.20 2.17 0.46 2.3 0.8 6-3 0.45 5.8 0.7 1.7 1.0 3: 1 3: 1 3.7% VEGETATED 0.035 0.12 3.48 0.28 1.8 0.5 6-2 0.44 5.8 0.7 1.7 1.0 3 : 1 3 : 1 2.0% XCEL R-1 0.066 0.25 1.70 0.31 2.6 1.0 6-2 0.44 5.8 OJ 1.7 1.0 3: 1 3: 1 2.0. VEGETATED 0.035 0.15 2.75 0.19 1.9 0.6 U c O U a.a O L3 W (-4 tc 0 W F- Cs! u7 w z �-+ r N c0 Z V)Pr) (300 ro W W zXzm C14 Z �mzvo Z w0000 Way w� Q Z F_ O O E-+ U W QF aN W W �l�,S,°� •ham O N O N 0) O O_ r W m Lli z W z 0� z W U J m O Q (/') LW Q r W = Q U 0 p 0 U (n >-- m z O F_ t1 U LLJ 0 F_ 0 LiJ rr Q z z Ory O Q U J � ryO O z0 o z � z Uw W zQ i O z I� V) Q c z ry Q o z O0 OO V Q SHEET NO. 5 Vi a U I O o- w i W, L