HomeMy WebLinkAboutSW4210704_Plansheet - Cover Sheet_20210803a
BEFORE YOU DIG!
CALL 811
N.C. ONE -CALL CENTER
IT'S THE LAW.
FLOOD CERTIFICATION RESTRAIN ALL FITTINGS AND STRAIGHT
The undersigned hereby certifies to the best of his knowledge and
belief the location of the subject property has been checked against / \ \\ PIPE BOTH SIDES PER DIPRA
area HUD/FIA maps and information provided by the Department of /
Housing and Urban Development and finds that: \\d,
j The subject property is located in a SPECIAL FLOOD \\
HAZARD AREA as determined by HUD/FIA flood map.
The subject property is not located in a SPECIAL FLOOD
HAZARD AREA as determined by HUD/FIA flood map.
( � The subject property is located in an area which has
not been mapped as to flood areas by HUD/FIA.
LINE TABLE
LINE
BEARING
DISTANCE
L1
N W-24'-37" E
23.14'
L2
N 39°-34'-44" E
59.42'
L3
N 34° 00'-33" W
111.59,
CURVE TABLE
CURVE
ARC LENGTH
RADIUS DELTA
C1
216.56'
152.72' 81-14-43
SITE NOTES (APPLIES TO ALL SHEETS):
1. ALL WORK PERFORMED WITHIN THE BIESECKER RD., WEBB RD. & W. CENTER ST. EXT.
SHALL BE IN ACCORDANCE WITH NCDOT STANDARDS.
2. ALL SUB -GRADES SHALL BE APPROVED BY GEO-TECHNICAL
PERSONNEL, AND PROOF ROLLED PRIOR TO PLACEMENT OF
STONE BASE MATERIAL. SURFACE COARSE SHALL OVERLAP
EXISTING PAVEMENT AT TIES TO PROVIDE FOR SMOOTH TRANSITION.
(SEE PAVING REQUIREMENTS)
3. FINISHED ASPHALT PAVEMENT AND CONCRETE SHOULD BE
COMPLETED SO THAT NO PONDING OCCURS. IF PONDING DOES
OCCUR, THE OWNER HAS THE RIGHT TO REQUIRE REMOVAL
AND REPLACEMENT.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING
APPLICABLE UTILITY LOCATION COMPANIES TO PROVIDE UTILITY
LOCATIONS PRIOR TO ANY CONSTRUCTION ACTIVITIES.
5. BOUNDARY INFORMATION SHOWN TAKEN FROM WORK BY OTHERS.
THIS IS NOT A SURVEY.
6. NO ATTEMPT WAS MADE TO LOCATE ANY UNDERGROUND UTILITIES.
7. THE OWNER IS RESPONSIBLE FOR SECURING ALL PERMITS FOR ANY IMPACTS TO
JURISDICTIONAL STREAM FEATURES OR WETLANDS.
8. THIS PLAN IS NOT A SURVEY. THIS PLAN SHALL NOT BE USED FOR
RECORDATION, SALES OR CONVEYANCES.
9. ALL FILL MATERIAL WITHIN THE LIMITS OF THE ROADWAY WILL BE PLACED IN
ACCORDANCE WITH THE GEO-TECH ENGINEER RECOMMENDATIONS TO A MINIMUM
95% STANDARD PROCTOR MAX. DENSITY. PRIOR TO PLACEMENT OF CABC BASE COURSE,
A PROOF ROLL WILL BE PROVIDED AND COORDINATED BY THE CONTRACTOR WITH THE OWNER'S
GEO-TECH ENGINEER. MATERIAL WILL BE REMOVED/REPLACED AT NO COST TO THE OWNER AS
DIRECTED BY THE OWNER'S GEO-TECH ENGINEER.
10. ALL UTILITIES SHALL BE LOCATED UNDERGROUND
11. TOPOGRAPHY SHOWN WITHIN IS A COMBINATION OF LIDAR AND FIELD SURVEY.
NCDOT NOTES: (APPLIES TO ALL SHEETS)
1. NEW ROAD WILL BE CONSTRUCTED TO N.C.D.O.T. STANDARDS, INCLUDING
DRAINAGE STRUCTURES AND PIPE, AND WILL BE A PUBLIC DEDICATED ROAD.
2. THE CONTRACTOR SHALL OBTAIN A COPY OF THE N.C. DEPT.
OF TRANSPORTATION DRIVEWAY PERMIT AND ENCROACHMENT AGREEMENT
AND COMPLY WITH ALL CONDITIONS THERE -IN. ALL ASSOCIATED COSTS
SHALL BE INCLUDED IN THE ESTABLISHED CONTRACT UNIT PRICE OF THE
APPLICABLE TIE-IN AND CROSSING.
3. THE CONTRACTOR SHALL PROVIDE FOR TRAFFIC CONTROL IN
CONFORMANCE WITH CURRENT N.C. DEPT. OF TRANSPORTATION
STANDARDS. THE METHOD OF TRAFFIC CONTROL WILL BE REVIEWED
BY REPRESENTATIVES OF THE N.C. DEPT. OF TRANSPORTATION PRIOR
TO ANY CONSTRUCTION ACTIVITIES WITHIN THE RIGHTS -OF -WAY.
ALL ASSOCIATED COSTS SHALL BE INCLUDED IN THE ESTABLISHED
CONTRACT UNIT PRICE OF THE APPLICABLE TIE-IN AND CROSSING.
4. PRIOR TO BEGINNING CONSTRUCTION, A MEETING WITH MR. KEVIN HEDRICK,
COUNTY MAINTENANCE ENGINEER (336-224-3200) SHALL BE HELD. FAILURE TO
CONTACT MR. HEDRICK PRIOR TO BEGINNING CONSTRUCTION AND AFTER COMPLETING
THE INSTALLATION SHALL MAKE THE ENCROACHMENT AGREEMENT NULL AND VOID.
5. ALL RCP PIPE WITHIN NCDOT PUBLIC RIGHT-OF-WAY SHALL BE CLASS III RATED.
6. ALL DITCHES MUST BE STABLE PRIOR TO ACCEPTANCE ONTO THE STATE SYSTEM.
7. THE 20' DRAINAGE EASEMENTS (D.E.) SHALL BE PRIVATE AND MAINTAINED
BY HOA AND WILL NOT BE MAINTAINED BY N.C.D.O.T.
CITY OF LEXINGTON UTILITY NOTES
1. CONTRACTOR SHALL CONTACT N.C. 811 FOR LOCATES AND NOTIFY
CITY OF LEXINGTON PUBLIC WORKS DEPT. AT 336-248-3930 A MINIMUM
OF 5 WORKING DAYS PRIOR TO SUBSURFACE EXCAVATIONS FOR
PUBLIC WATER AND SEWER.
2. CONTRACTOR AND ALL PUBLIC WATER AND SEWER SUBCONTRACTORS SHALL
ATTEND A MANDATORY PRE -CONSTRUCTION MEETING WITH THE CITY OF
LEXINGTON PUBLIC WORKS DEPT. PRIOR TO ANY WATER AND SEWER WORK.
3. ALL MATERIALS MUST BE APPROVED BY L;EXINGTON PUBLIC WORKS DEPT.
PRIOR TO SCHEDULING THE PRE -CONSTRUCTION MEETING.
4. CONTACT ROGER JONES, P.E., AT 336-248-3930 REGARDING MATERIALS
SUBMITTALS AND FOR SCHEDULING THE PRE -CONSTRUCTION MEETING.
5. TIE-INS TO PUBLIC WATER AND SEWER AND WATER AND SEWER CONSTRUCTION
SHALL BE INSPECTED BY THE CITY OF LEXINGTON PUBLIC WORKS INSPECTOR.
UNSCHEDULED/UNINSPECTED PUBLIC UTILITIES INSTALLATIONS ARE SUBJECT
TO REMOVAL AT THE CITY'S DISCRETION.
6. ALL RESTRAINT PIPE FITTINGS INSTALLATION SHALL FOLLOW DIPRA
RESTRAINT PROGRAM.
7. HORIZONTAL AND VERTICAL LOCATION OF EX. 12" W.L. IS APPROXIMATE.
CONTRACTOR SHALL LOCATE EXISTING W.L. PRIOR TO W.L. INSTALLATION.
CONTRACTOR SHALL FOLLOW TERMS OF APPROVED N.C.D.O.T. ENCROACHMENT
AGREEMENT WHEN WORKING WITHIN R/W LIMITS.
SELF -INSPECTION CHECKLIST
INSTALLATION OF PERIMETER EROSION CONTROL MEASURES
SIGNATURE DATE
CLEARING AND GRUBBING OF EXISTING GROUND COVER
SIGNATURE DATE
COMPLETION OF ANY PHASE OF GRADING OF SLOPES OR FILLS
SIGNATURE DATE
INSTALLATION OF STORM DRAINAGE FACILITIES
SIGNATURE DATE
COMPLETION OF CONSTRUCTION OR DEVELOPMENT
SIGNATURE DATE
ESTABLISHMENT OF PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION
SIGNATURE DATE
-mr- v
75
\ S�
� 74
•>/ / - / 73 COMMON
AREA
PARCEL #1132800000061A
N/F
ALLIED CAPITAL PARTNERSHIP
DB. 2150, PG. 1241 ' 72
�. S 87•-24'-20" E COMMON
AREA \ 80
OWNER/DEVELOPER:
NEW VENTURES LAND DEVELOPMENT, L.L.C.
P.O. BOX 36
WALLBURG, N.C. 27373
336-970-7935
SHEET INDEX
1 COVER SHEET
2 PLAN/PROFILE DOLCETTO AVE. STA 1+00 - 8+00
3 PLAN/PROFILE DOLCETTO AVE. STA 8+00 - 17+00
4 PLAN/PROFILE DOLCETTO AVE STA 17+00 - END
5 PLAN/PROFILE DOLCETTO COURT
6 PLAN/PROFILE OVADA AVE. STA 1+00 - 7+00
7 PLAN/PROFILE OVADA AVE. STA 7+00 - 15+00
8 PLAN/PROFILE OVADA AVE. STA 15+00 - END
9 SEWER OUTFALL
10 SEWER OUTFALL
it INITIAL EROSION CONTROL PLAN PHASE 1
12 INITIAL EROSION CONTROL PLAN PHASE 2
13 FINAL GRADING & EROSION CONTROL PHASE 1
14 FINAL GRADING & EROSION CONTROL PHASE 2
15 EROSION CONTROL DATA AND CALCULATIONS
16 EROSION CONTROL DETAILS
17 ROAD WIDENING DETAILS
18 WATERLINE DETAILS
\ 19 DRY DETENTION POND DETAILS
\ \ 70 NCGO1 CONSTRUCTION GENERAL PERMIT REQUIREMENTS
\ / 81
/
\ PARCEL #11331000000216 \ 92 / / / \ / / / \ 6'- 8 -37" W
RUSSELL CLAYTON SCOTT
\ DB. 2238, PG. 2195 \ 2
�94
28 E E-�-
\ I PARCEL #1 NSF 00000036
PARCEL #1133100000021 A
N/F \ �t JEFFERY R. COUGH
COREY L JACOBS / \ \ 35 / m DERE A L. G�OU�GH
DB. 2282, PG. 1063 / / 65 \ \ /
rn
87
ae
s
� /Sae /�
\/ /
99/sari//sari
\ / / \ 60 \ •� \ 39 j 23 / /1 "1
s
\ 100
PARCEL #1133100000049
N/F 56 \
BRANDON M. POWELL �f 102
,O s
DB. 2242, PG. 158
/sde/sdSd9 /
103
18
/opa
16 \ / /sari j San
105 \ 15 /s"n //San
PARCEL #1133100000052
N/F / COMMON j/ae tJ
KEITH L YOKELEY j 106 7 AREA%/
TERESA S YOKELEY 51 / sari
DB. 862, PG. 1500 `"'--•- - - / / / \ O \ \ / / � e / o
12 s �sa
•tin / \ ri
107 I � I
SITE DATA
EXISTING ZONING: MX-R
PROP. LAND USE: SINGLE FAMILY
TOTAL No. LOTS PROPOSED: 119
TOTAL SITE AREA: 77.73 AC.
L.F. STREETS: 4710 L.F.
SEWER: CITY OF LEXINGTON
WATER: CITY OF LEXINGTON
SOIL TYPE: CeD2, CcB, PaE, SfB, ChA,
PaD, EnD
AVERAGE SLOPE: 8% f
DISTANCE TO FLOODWAY: 50 LF
DISTURBED AREA: 44.3 AC.
PHASE 1: 21.0 Ac.f
PHASE 2: 23.3 Ac.f
PARCEL ID: 67216-01-36-0231
DEED REF: 1584-1466
RIVER BASIN: YADKIN/PEE-DEE
LAT/LON G: 35.8466/-80.2766
IMPERVIOUS SURFACE AREA:
ROADS: 2.40 AC.f
LOTS: 8.20 AC.t
TOTAL: 10.60 AC.f (13.77.)
OPEN SPACE: 39.2 Ac.f (507)
EST. START DATE: JUNE, 2020
EST. END DATE: DECEMBER, 2022
my 3.4 _ 50 ,� \ 10 \ /sa/San
S 8T-52'-14" E / GENERAL NOTES (APPLIES TO ALL SHEETS) - \ \ 1. It shall be the General Contractor's responsibility to establish cut and fill quantities necessary to
142. 89 � / / / �/ / \ 0 \ / /s � / P Y q y provide the final grades indicated on
s sari / these plans. Fill material not available at the site shall be provided by the General Contractor at no additional cost to the owner.
Furthermore, the General Contractor, by way of establishing a contract price for site grading, has acknowledged that he is aware of the
R \ 108 / \ O / / limited subsurface information and available fill material necessary to complete the work, and that his established
2 contract price is sufficient to ensure the proper completion of the project and conditions which may affect the work, including but not
0
i N N`Q \ \ O7 / /San//dn �6� restricted to those bearing upon transportation, disposal, handling and storage of materials; water tables or similar conditions at the site;
o \ 109 i° / an / / COMMON �� PARCEL 1133100000020B availability of labor, water, electric
/ S"n AREA # Y power, roads, and uncertainties of weather; and the character of equipment and facilities needed
\ ® San/o C, 1° N/F preliminary to and during proceedings of the Work. Any failure by the Contractor to acquaint himself with these facts will not relieve him
110
/ / s ` RM DAVIDSON NC LLC
from responsibility for estimating properly the difficulty or cost of successfully performing the work. The Owner assumes no responsibility
% RM CHARTER HOLDINGS LLC
P.B.71, PG. 47 for any conclusions or interpretations made by the Contractor on the basis of the information, if any, made available by the Owner.
111 / \ San oo san� DB. 2388, PG. 2359
2. The Contractor shall be responsible for any damage to gas or water pipes, public or private sewers, drains or culverts, railroad or traffic
signal cables, telephone or power conduits, or other structures. When utility lines that are to be removed are encountered within the area
CARMAN / / \ sae ooj/dn / of operations, the Contractor shall notify the Owner's representative in ample time for the necessary measures to be taken to prevent
interruption of the services. Reasonable care has been exercised in showing the location of existing utilities on the plans. The exact
s / O San// % location of such utilities is not known in all cases. The Contractor shall explore the area ahead of the grading operation by observations,
/nojs/ electronic devices, and by personal contacts with utility companies, and locate such utilities in advance of the trenching or grading
operations, and shall conduct his work so as to eliminate or minimize damage to the existing structures or utilities.
115 \ a s
3. Vertical and horizontal reference points provided on these plans are intended to establish base lines for locating the principal components
s �
of the Work. From this information the Contractors shall develop and make all detailed surveys needed for construction of all types.
Costs associated with the provision of construction lay -out shall be included in the contract price for the related work. In no case shall
sari//Soy/ information provided on the plans relieve the Contractor from his responsibility of providing building locations and dimensions as
indicated on the architectural plans. The Contractor shall carefully preserve bench marks, reference points and stakes and, in case of willful
or careless destruction, shall be charged with the resulting expense and shall be responsible for any mistake that may be caused by their
0
unnecessary loss or disturbance.
4. The General Contractor shall be responsible for the provision and routine
/sae/�sa� 118 I maintenance of erosion control devices, either indicated or required by Division of Land Resources Personnel, necessary to comply with the
Sae /sari Sedimentation Pollution Control Act of 1973 and amendments thereto. Any fines resulting from the improper provision or maintenance
of required devices shall be burdened by the General Contractor.
5. The General Contractor shall be responsible for conformance with all current local, state, and OSHA safety codes during all phases of the
�ePSFo°San/ CARMAN 119 I O work. Contract prices established for the work shall include costs associated with the provision of safety equipment, and personnel necessary
eP4 /eP4 I I I to complete the work, including but not limited to, trench bracing, and personnel licensed by OSHA as competent for evaluating soil stability.
G /G / ---•-- 6. No sub -surface investigations have been performed at the site. The General Contractor is encouraged to
perform additional sub -surface investigations prior to establishing his contract price for site grading. It shall be the
General Contractor's responsibility to establish cut and fill quantities necessary to provide the final grades indicated
s l on these plans. Fill material not available at the site shall be provided by the General Contractor, or excess material
ePs / °° - -•-�M ` 4 N. -, _ - _ - _ shall be removed/disposed of by the contractor, at no additional cost to the owner. Furthermore, the General
Contractor, by way of establishing a contract price for site grading, has acknowledged that he is aware of the
_ - M-- limited subsurface information and available fill material or excess material necessary to complete the work, and that
o° his established contract rice is sufficient to ensure the proper completion of the y
° 'fit- s � price p p p project and conditions which may
BIESEC! r'R - affect the work, including but not restricted to those bearing upon transportation, disposal, handling and storage of
ROAD SR #140�- -' - 100' 50' 0 100' 200' materials; water tables or similar conditions at the site; availability of labor, water, electric power, roads, and
o �
S \ uncertainties of weather; and the character of equipment and facilities needed preliminary to and during prosecution
` \ - of the work. Any failure by the Contractor to acquaint himself with these facts will not relieve him
SCALE: 1 - 1001 from responsibility for estimating properly the difficulty or cost of successfully performing the work. The Owner
-•• •� assumes no responsibility for any conclusions or interpretations made by the Contractor on the basis of the
information, if any, made available by the Owner.All fill material shall be placed in conformance with the
Geo-Tech Engineer's recommendation, and compacted to a minimum of 95% Standard Proctor density.
U
c
q
O
W
N04
00
W
u'
I- u7
w r I
z
ryL"�
H
z
I- c0
V)nC300co
W W
Z X Z -0(c)
Z
�MZV)
Z
Z
LJ
W , 7
oU
I� w
z
Q
O O
N
U)
Q�• o`'� _ J
w
U ob N
�2 4
0
O
o
LLJ
N
N
m
O
F_
M
1_Z
a
Q
ry
LLJ
m
�
LL]
0
z
z
0
z
w
J
m
W
to
Q
0
W
Q
OQ
Li
ry=
0
-�
0
0
U
(n
C!
m
M
O
F-
0
z
LLJ
Z
Q
�
o
F-
0-
in
iz
L.iJ
U
LLJ
Q
p
O
I-
Q
w
o_
V1
Z
Z
_
0
O
r2l
m
^
H
O
LLL J
_
�
Z
v1
LLJ
O
F-
Z
0
O
U
W
Z
O
v
�
0
SHEET NO.
0
w
0
I