Loading...
HomeMy WebLinkAboutSW4210704_Supplement-EZ Form_20210803Permit No. (to be provided by DWQ- ��an�tiVN Nr v STORMWATER MANAGEMENT PERMIT APPLICATION FORM o NCDENR 401 CERTIFICATION APPLICATION FORM DRY EXTENDED DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Fart 111) must be printed, filled out and submitted along with all the required information. 1. PROJECT INFORMATION,' . Project name Dolcetlo Contact person Rich Glover Phone number 336-886.5523 Date 7/7/2021 Drainage area number 1 11, DE$IGN INFORMATION Site Characteristics Drainage area 566,393.00 ft2 Impervious area 185,566.00 ft2 % Impervious 0.33 Design rainfall depth 1.00 in Peak Flow Calculations 1-yr, 24-hr rainfall depth 2.84 in Rational C, pre -development 0.40 (unitless) Rational C, post -development 0.50 (unitless) Rainfall intensity: l-yr, 24-hr storm 0.12 in/hr Pre -development 1-yr, 24-hr peak flow 0.62 ft3/sec Post -development 1-yr, 24-hr peak flow 0.78 ft'/sec Pre/Post 1-yr, 24-hr peak control 0,16 ft'/sec Storage Volume: Non -SA Waters Minimum required volume 16,264.00 ff3 Provided volume 28,381.00 ft3 OK Sediment storage volume provided 7,096.00 ft3 OK Storage Volume: SA Waters 1.5" runoff volume ft3 Pre -development 1-yr, 24-hr runoff volume ft3 Post -development 1-yr, 24-hr runoff volume ft' Minimum required volume ft3 Provided volume ft3 Sediment storage volume provided ft3 Basin Design Parameters Drawdown time 3.80 days OK SHWT elevation 718.00 fmsl Basin bottom elevation 720.00 fmsl OK Storage elevation 724.00 fmsl Basin side slopes 3.0 :1 OK Top elevation 729.00 fmsl OK Freeboard provided 1.60 ft OK Basin Bottom Dimensions Basin length 118.00 it Basin width 7200 —it Length to width ratio 1.60 :1 OK Form SW401-Dry Extended Detention Basin-Rov.3 Parts I. & II. Design Summary, Page 1 of 2 Permit No. Additional information (to be provided by DWQ) Total runoff volume captured by basin 7.81 ac-in Forebay is not required Forebay provided N (Y or N) Is basin in a recorded drainage easement? Y (Y or N) OK Does basin capture all runoff at ultimate build -out? Y (Y or N) OK Is a sediment depth indicator included? Y (Y or N) OK Does the basin include a drain? Y (Y or N) OK Form SMal-Dry Extended Detention Basin-Rev.3 Parts I. & 11. Resign Summary, Page 2 of 2 A% Permit No. (to be provided by DWQ) III. REQUIREDITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information, This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. 1. Plans (1" - 50' or larger) of the entire site showing: Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. -10 ) A 2. Plan details (1" = 30' or larger) for the bioretention cell showing: - Basin dimensions - Pretreatment system, - Maintenance access, - Outlet structure, - Overflow device, - Flow distribution detail for basin inflow, and - Vegetation specifications. 1 3. Section view of the basin 0" = 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. 6. A construction sequence that shows how the dry detention basin will be protected from sediment until the entire drainage area is stabilized. _M W0,W 7. The supporting calculations. -I 1k) S8. A copy of the signed and notarized operation and maintenance (0&M) agreement. _t L" 5 07 9. A copy of the deed restrictions (if required). Sd�c)ft,�lf- 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Dry Extended Detention Basin-Rev.3 Part Ill. Required Items Checklist, Page 1 of 1