Loading...
HomeMy WebLinkAbout20210925 Ver 1_Correct Permit Drawings_20210728 Carpenter,Kristi From:Parker, Jerry A Sent:Wednesday, July 28, 2021 3:28 PM To:David.E.Bailey2@usace.army.mil; Conchilla, Ryan Subject:Correct Permit Drawings for Tabernacle Church Rd (17BP.7.R.138) Attachments:Tabernacle Church Rd Permit Drawings.pdf Dave and Ryan, I haver no idea how, but the permit drawings that you received for the Tabernacle Church Rd Bridge Project (Bridge # 584) are different from what I thought I submitted. I am submitting the drawings I intended to send. Please use the attached drawings for your permit review. I apologize for the confusion. Jerry Jerry Parker Environmental Supervisor Division 7 North Carolina Department of Transportation 336 256 2063 office jparker@ncdot.gov 1584 Yanceyville St. P.O. Box 14996 Greensboro, NC. 27415-4996 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1 HAWN..„,. lin. North Carolina Department of Transportation \ Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 2.08;Released April 2018) FOR NCDOT PROJECTS WBS Element: 17BP.7.R.138 TIP No.: SF-400584 County(ies): Guilford Page 1 of 1 General Project Information WBS Element: 17BP.7.R.138 TIP Number: SF-400584 Project Type: Bridge replacement Date: 3/31/2021 NCDOT Contact: Galen Cail Contractor/Designer: Reid Robol Address: 1000 Birch Ridge Drive Address: 940 Main Campus Drive Raleigh,27610 NC Suite 500 Raleigh,NC 27606 Phone: 919-707-6711 Phone: 919-754-5005 Email:gcail@ncdot.gov Email: rrobol@vhb.com City/Town: Pleasant Garden County(ies): Guilford River Basin(s): Cape Fear CAMA County? No Wetlands within Project Limits? Project Description Project Length(lin.miles or feet): 0.12 I _Surrounding Land Use: Forest,rural residential j AM Proposed Project ml Existing Site . Project Built-Upon Area(ac.) 0.4 ac. 0.3 ac. Typical Cross Section Description: 2 @ 11'lanes with 4'paved shoulders and 2'grass shoulders(road)and 2 @ 11'lanes 2 @ 10'lanes with 0.5'paved shoulders. with 4'-3"paved shoulders(bridge). Annual Avg Daily Traffic(veh/hr/day): Design/Future: 1060 Year:2025 Existing: 530 Year: 2015 General Project Narrative: TIP project SF-400584 involves the replacement of the existing NCDOT Bridge#400584 on SR 3412(Tabernacle Church Road)over Big Alamance Creek at Guilford County. (Description of Minimization of Water Bridge#400584 consists of 3 @ 30'precast prestressed concrete channels with end bents made of PPC cap and timber piles and interior bents made of PPC cap and steel Quality Impacts) piles.The proposed bridge consists of 1 @ 100'-39"box beam with 4'-0"caps.Rip-rap pads will be utilized to disspate energy and to reduce velocity at all proposed outfalls.No deck drains are required for the proposed bridge. The bridge subject to the Jordan Lake Buffer Rules. Waterbody Information Surface Water Body(1): Big Alamance Creek NCDWR Stream Index No.: 16-19-(1) NCDWR Surface Water Classification for Water Body Primary Classification: Water Supply IV(WS-IV) Supplemental Classification: Nutrient Sensitive Waters(NSW) Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Buffer Rules in Effect: Jordan Lake Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? No Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? No (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) o, / 1 / SHEET TOTAL 2 00 - - 3652 3�42 8 9 NORTH CAROLINA STATE STATE PROJECT REFERENCE NO. 3�71 3589 � / \ (�/J'`Q' '�/J NO. SHEETS 2 CY) L) 7 3�38 32 3-92 3-43 A 3�48SI 3�—r . , - , b\ O tlO 1!/ It PO7ORo 581 3�37 3�18 44IVISION OF HIGHWAYS STATE PROJ.NO. F.A.PROJ.NO. DESCRIPTION 34 1 3549 3�45 3�37 ' ' 3603 • 3332 , 3612 3548124 3604 3�43 360 n 3723 3�12 Z 3�25 3�01 3-00 3414 3680 3739 GUILFORD�6 3694 3�6? 3�59 .i.Q C 0 UNTY 5:2 O `3 _ 3.30 3 • � 3�56 al . 17BP.7.R.138 �\ 3551 3 °::1 .. 3476 34H4 354 _ PROJECT =49 =51 9 1_77 LIMITS 351-r' =H° =51 339a LOCATION: BRIDGE NO. 584 OVER BIG ALAM. ANCE CREEK pi" ," PERMIT DRAWING 3311 ON SR 3412 (TABERNACLE CHURCH ROAD) 3438 SHEET1OF6 [1'4. " 3623 3622.„ TYPE OF WORK: GRADING, PAVING, DRAINAGE AND STRUCTURE C.) . 3712 3�18 3714 1 3�67 237 biL1111114 �93_ D WETLAND AND SURFACE WATERS IMPACTS PERMIT 3 87 80 93 3564 3�10 t=i327 G 687 N y..., �07 - ,^^' 78,573 ' 3740 VICINITY MAP „I:4 (NOT TO SCALE) 0 0 0 0 0 OFF—SITE DETOUR 16...__°14 El"! , nil 44 Pliiilli N SITE l Z co BEGIN PROJECT /7BP.7.RJ38 END PROJECT /7BP.7.RJ38 0 -L- POC Sta. /1+00.00 BEGIN BRIDGE m END BRIDGE -L- POT Sta. 17+50.00 Q —L Sta. /3+75.00 �m. A L Sta. /4 75.00 /j Z i —L— I I N / I B TO T L--- TO n PLEASANT GARDEN 1 / US 42/ � SR 34/2 V 73 (TABERNACLE CHURCH ROAD) 1— F- BEGIN APPROACH SLAB END APPROACH SLAB L —L— Sta. 13+63.00 m —L— Star].4+87.00 a / * .* \ / y co * ± Ln O O I LL V) / ca U E 0 L CI DOCUMENT NOT CONSIDERED FINAL / • • UNLESS ALL SIGNATURES COMPLETED -H E1114 1 E w Prepared In the Office of Simpson Engineers & Associates for ROADWAY DESIGN ENGINEER E LI) GRAPHIC SCALES DESIGN DATA PROJECT LENGTHPLANS PREPARED BY: L ADT (2015) = 530 DIVISION 7 50 25 0 50 100 NORTH CAROLINA DEPARTMENT OF TRANSPORTATION IMPSON 5640 Dillard Drive ADT (2025)= 1,060 NGINEERS Suite 200 Cary, NC 27518 LENGTH ROADWAY TIP PROJECT = 0.104 MILES 2018 STANDARD SPECIFICATIONS SSOCIATES (919) 852-0468 1- PLANS DAVID SIMPSON, PE Z- www(919) 852-0598 (Fax) www.simpsonengr.com Eitti V = 45 MPH RIGHT OF WAY DATE: PROJECT ENGINEER SIGNATURE: P.E. 50 25 0 50 100 LENGTH STRUCTURE TIP PROJECT = 0.019 MILES HYDRAULICS ENGINEER LICENSE NO. C-2.521 REID B. ROBOL, PE F U N C CLASS = LETTING DATE: CelliPROFILE (HORIZONTAL) HYDRAULIC ENGINEER **I°D+ LOCAL TOTAL LENGTH TIP PROJECT = 0.123 MILES �/VI1b aLL 10 5 0 10 20 N� TIM POWERS, PE VHB Engineering NC, P.C. (C-3705) I 1 SUB REGIONAL TIER NCDOT CONTACT: DIVISION BRIDGE40 Main Campus Drive, Suite 500 P.E.E Raleigh, NC 27606 %� P PROFILE (VERTICAL) PROGRAM MANAGER g � `'"- J \ /\ J\ J\ SIGNATURE: �.1 PROJECT REFERENCE SHEET NO. DETAIL 1 DETAIL 2 DETAIL 3 DETAIL 4 LATERAL BASE DITCH TOE PROTECTION STANDARD BASE DITCH RIP RAP AT EMBANKMENT 17BP.7.R.138 - GUILFORD 584 4 (Not to Scale) (Not to Scale) (Not to Scale) (Not to Scale) ROADWAY DESIGN HYDRAULICS Natural Natural 10'min. ENGINEER ENGINEER o Fill Ground �• . Ground Natural 1 oC Fill Natural �p��et Slope y D Ditch 1.0'min. Ground ?.•j I- 3- 'c'te< Slope d I D ��p Ground d 1.$' d I Geotextile Grade F Geotextile B Min. D=1.5 Ft. Geotextile B \ \ d=1.0 Ft. Max. d=1.5 Ft. GEOTEXTILE Min. D=1.5 Ft. ISFD *When B is < 6.0' B=2.0 Ft. Max. d=1.5 Ft. B=2.0 Ft. FINISHED FLOOR Type of Liner= CLASS B RIP RAP I Type of Liner= CLASS I RIP RAP Type of Liner= CLASS I RIP RAP Type of Liner= CLASS B RIP RAP ELEVATION: 684.53 MH -L- STA. 14+95 TO 16+O6 LT -L- STA. 13+00 TO 13+57 RT -L- STA. 14+12 TO 14+24 LT -L- STA. 11+00 TO 13+00 RT / Am / DENO0 1///j/ DENOTES FILL IN TES IMPACTS IN t //� SURFACE WATER WETLAND cS LO �+ MOTE MACDONALD I& E,LLC VHB ENGINEERING �� S F� LICENSE NO.F-0669 LICENSE NO.C-3705 �" ` DAVID R HANKINS �,�// DENOTES TEMPORARYWI/A DENOTES HAND DOCUMENT NOT CONSIDERED FINAL ZI/ 0 .� �� 9`' PEGGY A HANKINS �� IMPACTS IN SURFACE WATER CLEARING UNLESS ALL SIGNATURES COMPLETED JAMES G GADDY oo�o `a�A Prepared in the END BRIDGE Office of: M BOBBI B GADDY RIP RAP @ EMBANKMENT `� :400,1, END PROJECT 17BP7.R.138FINISHED FLOOR r wA Po Box 700 \V(‘ ELEVATION: 680.30 SEE DETAIL 4 ��� o MOTT 11/� Fuay-Vahna,NC 27526 EST. 30 TONS RIP RAP , �� \ -L- StO. 14+75.00 -L- POT Sta. 17+50.00EST. 60 SY GEOTEXTILE � ` `" MACDONALD www.mottmac.corr✓americas END APPROACH SLAB DELLA C ELLIS MICHAEL G ELLIS �•.��� VHB Engineering NC, P.C. (C 3705) SLAB Om 940E Main Cam us Drive,Suite 500 CLASS B RIP RAP 2SFD BEGIN BRIDGE a -L- Sta. 14+87.00 �' '' Raleigh,NC 27606 EST. 3 TONS • - `�� EST. 10 SY GEOTEXTILE -L- Ski. /3+75.00 CLASS B RIP RAP VERTICAL SCALE HORIZONTAL SCALE il EST. 2 TONS TOE PROTECTION 1 2 2 5 ' -L- PT Ski. 11+8O.64 CONCRETE ''` I JEsT. 7 SYEOTEXTILE I ��' L 20PAVED Sm •' _ „ EST. ?? TONS RIP RAP DITCH N 1 1� rwi �5SEST. ?? SY GEOTEXTILE -L- POT Sta. 18+50.00 -L- PC Ski. 10+00.00 STD. 850.01 / �. N N _m m IOODS �� ,� `-� WOODSi WOODSWOOD. '1 t t mI I P E RM I T D RAWI N G ��� / Z PDE •DE - "vim 1 �, --r -. / .` I M 0.2' TO P PDE ,,,�, .l �,► ,- PDE_ Im SF-I E ET 2 OF 6 EIP -E E E 1111/1, N N �: / r PDE-_ , X XISTING R/W E� E C CO_ mom -- -. : � „,,,,•.,,.,,. _-- ppE .... .. �► -----F 'i , XISTING R/W .` -r' =Z- -) r� • - 0 . peoutimal!.._,.:'. i a� � �� �ii%/Il����il� TB GI iME T ' f. `• - O - _ A - �� 'j I15" RCP-I -L- I SR 34/2 20'BST ZD o / 1 1ITO US 42/ TO PLEASANT GARDEN o - TABERNACLE CHURCH RD/1!•1 I I ME 15 RCP-IV N 83'58 4I.2' E 53 1 ...•.,.... .� .� .a. AF ��� ,I '011►� , I _G END s$z---_�.�. --- 0' CME ._ _�:i •• EXISTING R/W \ .:r. hifalf��._.::�_nc-- __ c- . 7C " �C TO T 2 ,, - .. ..at:��n - %It+20 L VE / ; XISTING R/W EIP ou 24 STON C v;c.. 7 / \ o F Ac.... ..-i', UE STO I I I 1 ,�:c.. J+ , D O \ / `'`� pp \ ( WOODS r DUE DUE " k_ 15'UE \ \ GR I I I / 41p,,,,..„ ',, }, OUE W/ELBOWS WOODS WOOD' ,..1 , Y. �� \ I I I QUF ��' m DUE ` DU • UE D. BEGIN APPROACH SLAB WOODS t m CLASS B RIP RAP BEGIN PROJECT l7BP.7.R.138 ► m m EST. 2 TONS A -L- POC Ski. /1+00.00 -L- Sta. /3+63.00 , m D ;`ma" Nn\ EST. 7 SY GEOTESXSTILE 4 •STANDARD BASE DITCH "rn / WALTL- G RICKS III LATERAL BASE DITCH SEE DETAIL 3 ''' / - MARY N RICKS SEE DETAIL 1 SLOPE = 0.078 CUT EXISTING STfrEL PILE FLUSH WITH EST. 70 TONS RIP RAP EXISTING (EAST BANK) CONCRETE FOOTER EST. ?? TONS RIP RAP EST. 130 SY GEOTEXTILE AND RETAIN THE T NCRETE FOOTER AS IS. //let - EST. ?? SY GEOTEXTILE EST. 10 CY DDE / Z \ / CLASS B RIP RAP / w 0 EST. 4 TONS \ \ -' -- EST. 10 SY GEOTEXTILE ��5�� AA% QUATE LIVING TRUST JOHN W A'CHER, JR - '9 '\ a mR, CLARENCE W QUATE TRUSTEE m =o w LINDA W. ARCHER CLASS II RIP RAP i HAZEL W QUATE TRUSTEE 0 , UP TO E,LEV. 640.0' (TYP.) fi, (STRUCTURE PAY ITEM) ' JOHN W AHL;HLR. JR o LINDA W. ARCHER D / 1 MH \ i , . _ L MK C, 4 si i LI cn BEGIN P J aT BEGIN GRADE MIDGE 4 SIA. 14+25.D -L- END P-RO. ECT: �39" 30X BEAM END GRADE 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . STA. 11 + 0 STA. 17+50.00 c STA. 11 +50.100 I SPAN: a1100'. SKEW ''° STA. T/ + - O EL = 642 18' W/4' DEEPCAPS EL = 691.,40' 0 GP LL:V. - 68/.45' 1 - L PI = 12 +55.00 PI = 15 +80.00 MILL EL = 688.12' EL = 686.84' M .L L TO VC = 210 VC = 210' T -0 700 • • • �.?cI-s-- = = 50 EX ST 700 5 7 i co SI LO 6 9 0 -rune,- , 3. . --� 7�iil'� ._ . . . . . . . . . . . 690 / ' 3. gc,o .��` = N _ BR/DGF DRAUL/C DATA 3 DESIGN / HARG = /494 CFS • 0 680 3 V _ : ,� DESIGN FREQUE 25 YRE---- 680 s +Qs s y N i � _ DESIGN HJ4[ ELEVATION = 679J FT - r 11 "� II . r •_ r Ilk ,'�' BASE DISCHARGE _ �� _Z _Z�, - N _ ~ = BASE FREQUENCY I ' = /00 YR 670 O IW .� IW I -i - I W I .7a 1 L_I a_ I Ll-L LLI ILL LL I w /11115.VBASE HJtY �l F►/ATION 70 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - > P/N CH GE = - 6666 CFS c w OVERTOPPING r QUENCY = 500+ YRS 1- 660 660 • 'TOPPING ELEVATION = 6872 FT • X rAVA E TO i ELE-V=67'.5' ai i ci 4 II1.SIP(2 RAP I MC - BATS iOF SURVEY DE/Q61/OI9 N (NORMAL. TO CAP) (TYPI 0 _ - - - - - - - - - - - - AIC)RMAI W� WWS.ELEVATION - - - - - - - - - - - - (STRJCTURC PAY ITEM) ELEV.-671.L' - AT-D E OF SUfi�/t Y 671.4 _a DATE: 02-28-2019 EXCAVATION = 175 -cv TI N O M i iO 650 (STRUCTURE PAY IT;M) 650 NI T ,r�_ 0 10 11 12 13 14 15 16 17 18 CV _, Ln coCC E PROJECT REFERENCE SHEET NO. DETAIL 1 DETAIL 2 DETAIL 3 DETAIL 4 LATERAL BASE DITCH TOE PROTECTION STANDARD BASE DITCH RIP RAP AT EMBANKMENT 17BP.7.R.138 - GUILFORD 584 4 (Not to Scale) (Not to Scale) (Not to Scale) (Not to Scale) ROADWAY DESIGN HYDRAULICS 1 Natural Natural 10'min. ENGINEER ENGINEER o Fill Ground �• 1 Ground Natural 101 Fill Natural �p��et Slope / D Ditch 1.0'min. Ground ?.•j i- 3' 'c'te< Slope d I D Ground d 1.$' di Geotextile Grade F Geotextile B Min. D=1.5 Ft. Geotextile B \ \ d=1.0 Ft. Max. d=1.5 Ft. GEOTEXTILE Min. D=1.5 Ft. ISFD *When B is < 6.0' B=2.0 Ft. Max. d=1.5 Ft. B=2.0 Ft. FINISHED FLOOR Type of Liner= CLASS B RIP RAP Type of Liner= CLASS I RIP RAP Type of Liner= CLASS I RIP RAP Type of Liner= CLASS B RIP RAP ELEVATION: 684.53 MH C> -L- STA. 14+95 TO 16+06 LT -L- STA. 13+00 TO 13+57 RT -L- STA. 14+12 TO 14+24 LT -L- STA. 11+00 TO 13+00 RT \ � � WZ DENOLO 0 TES IMPACTS IN 1///j/ / DENOTES FILL IN � _ �Gs SURFACE WATER WETLAND MOTT MACDONALD I& E,LLC VHB ENGINEERING ` S F, LICENSE NO.F-0669 LICENSE NO.C-3705 �m� F` ` DENOTES TEMPORARY Z1/ 0 \� '• �� 9`� PEGGY R HANKINS /// / IMPACTS IN SURFACE WATER /i//? DE CLEARING DOCUMENT UNLESS ALL SIGNATURES COMPLETED Pres JAMES G GADDY � \?a'" Office read in the n A BOBBI B GADDY RIP RAP @ EMBANKMENT END PROJECT 17BP7.RJ38 1Y1 N� F Box °�a,NC 27526 FINISHED FLOOR 9� END BRIDGE ELEVATION: 680.30 SEE ! T1EEE -L- Sta. 14+75.00. -L- POT Sta. 17+50.00. 1. ' ms MACDONALD www.mottmac.corr✓americas END APPROACH SLAB DELLA C ELLIS MICHAEL G ELLIS �•.��" VHB Engineering NC, P.C. (C-3705) SLAB o�\T,.;) i. 940 Main Campus Drive,Suite 500 CLASS B RIP RAP 2SFD BEGIN BRIDGE n • -L- Sta. 14+87.00 �' '' Raleigh,NC 27606 EST. 3 TONS J, `A• f I J / ( EST. 10 SY GEOTEXTILE -L- Sta. 13+75.00 CLASS B RIP RAP r / / - VERTICAL SCALE HORIZONTAL SCALE ri ,I I EST. 2 TONS 71- TOE PROTECTION -L- PT Sta. 11+80.64 CONCRETE \ ` JEST. 7 SY GEOTEXTILE SEE DETAIL 2 I I I 111 IL¶� 2 l II I IL 2 0 DITCH �- N( _ I ca PAVED N -WL: 15" EST. ?? SY GEOTEXTILE -L- POT Sta. 18+50.00 -L- PC Sta. 10+00.00 STD. 850.01 N N 1� -W�ELBO�S WOOD: !IN Ds'', - WOoo PERMIT DRAWING ��o PDE ,-5T .- --r . SHEET 3 OF 6 j F c- t .` LL r,�, �� ����/� PDE 0.EIP 0 EXIST _ W W. E� E-E E E PD II.. cn N ��I;� „.I"�> ,,,,.,.,,-,. _ PDE-_PD , I m rnX(.1 ul��ia17 Cop� 1111111i• •� - ice' ' ---- F E . A YI- TILJ(zB/W II _ -- awl': --= -�'. .... ����1��' •/11/1/ :Ar41-; a _• / • ' . - /iI1A1aiii. �� ///t1111ti1 TB �� Litz- L - ! ` 1- ♦ �� • / IIIIw11U�1 ±= ,,� .'�i/111111U�1 t GI - -T - - --4_:--- - r`' `' A - �.�... err - - - s ':- r ji i �f 'j I15, RCP-I - --L - �- SR 34/2 / .• BST t/TO US 42/ TO PLEASANT GARDE �� ' 'f N 83'58' 412" E TABERNACLE C URCH RD Ul / I. ':::. ll 15 CP-IV _ A. -. --- - ---- - :Q Al-J77 - a u ,ill/_ - ter. lix -V -- '� - �`- ✓ _i ;i i_ .tl. �l-Mf \' =__ram Wear m . - f � 4 IC lb yi S - / 11/ea "' tri yam- 0.6 EXISTING R/W _ - 4har:r" .�: .' - ::...�` ei� .�-. .� �� -�'.E'i END S�B�----- 30" CMS�._ -15:�►�"' �� TO \ 2 , ..E.�;0.o• +20 L \ -E' / I rower NG R/w EIP D✓✓ 24 C-.'c: . 7F � ;.. i', \ UESTO I' ' �\ 4' I I /////� 44, • -- cP 4 p 1 I�, S UE \ GR I 01 ►S ' • 1 DUE DUE `a - 15„ 'MODS / , WORDS ,,�`' N m \\ t. A DuE W/ELBOWS \CI \ I I D N BEGIN PROJECT 17BP.7.RJ38 BEGIN APPROACH SLAB UE ` m WOODS C SS B RIP Ry/ r EST. 2 TONS -L- POC Sta. 11+00.00 -L- Sta. 13+63.00 ,,( m RIB ;` \ N EST. 7 SY GEOTE,IILTI E IJ 10 1 //// STANDARD BASE DITCH 1 tr• �rny _� 1 L E' G RI K I SEE DETAIL 3 \z„..\\ // "Y RI K LATERAL BASE DITCH SLOPE = 0.078 CUT EXISTING ST EL PILE FLUSH WITH SEE DETAIL 1 EST. 70 TONS RIP RAP EXISTING (EASTANK) CONCRETE FOOTER EST. ?? TONS RIP RAP EST. 130 SY GEOTEXTILE AND RETAIN/`HE NCRETE FOOTER AS IS. EST. ?? SY GEOTEXTILE EST. 10 CY DDE Z lou / CLASS B RIP RAP / w 0 EST. 4 TONS \ \ ' N J } EST. 10 SY GEOTEXTILE �S;� QUATE LIVING TRUST � \ �s ` CLARENCE W QUATE TRUSTEE JOHN W A'CHER, JR �, "'\74; HAZEL W MATE TRUSTEE 0 LINDA W. ARCHER CLASS II RIP RAPi UP TO E,LEV. 640.0' (TYP.) o , (STRUCTURE PAY ITEM) -73 0 rn JOHN W ArtLI-ILR JR n LINDA W. ARCHER S D N 1 N -p \f1.1 Lt i MI' l CI _ L MK 01 4 BEGIN P .l C11 MIDGE 4 SIA. I4+25.D -L- EIVD P-RO.ECT: hi = STA. 11 + . 0 BEGIN GRA)E �39" 30X BEAM END GRE STA. 17+50.00 STA. 11 +50J00 I SPAN: I a1100'. SKI=/V 90 STA. T/ +9-0-.OQ EL = 6' 2 18' GI' kL V. CA61S/.45' EL = 691 A0 1 , o • • • • • • • • • • • • • • • • . • - - PI = 12 +55.00 PI = 15 +80.00 3 • EL = 688.12' EL = 686.84' L MLL . . . . . . . . MILL VC = 210 VC = 210' T 700 . . . . . . ..ST = 50 EX ST 700 Q � � = 53 K DI co Lc) 690 ��i3#�t'1�l�RII��-- 690 �'� 4 �- - t7111 n „roe 4 N • ,^a .`�`,; �'" 3938 ►=R/DG DRAULIC DATA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . II • 5 Ix 1- �� , DES U N D/ ARG = 1494 CFS 0 6 8 0 tr'.;q ro_rn V1 DESI N FRE E - 25 YR . 680 _ A e i ,i, v E o o o +o .: �;.�_ .!��, LF_I�ATION 9J FT c - Za� r� u- I II N O ii' 1 = ► 11 Z II o II ,;` BASE D/S(,HARG� _ 670 `' I W W " I W - SASE FREQUENCY = /00 YR om W m � � J� - -AA E ION = 670 i 5 if " ' 0 -P/N CH GE = - 6665i CFS • Lu OVER OPPING - 50r. / YRS . A • -TOPP NG ELEVATION = 687 FT • ELE-V=67'-5' 660 . . . . . . . . . 019 660 w C"LAJ II R P RAP �TF1 iOF SURVEYy L NSLU'E 1-.5:I (2 1-T- I HICK) 1tf c U - SLORMAL TO l') (TYP NORMAL W� - W.S•ELEVATION ,i (STRUCTURE PAY I .:M) E LEV.-671.L' - 671.4 PT �D EOFSUfi'rtY .. 0 DATE: 02-28-20/9 ExC'.AVATION = 175 -cv N S O re-) - in 650 (STRUCTURE PAY IT;M) 650 d- = D 10 11 12 13 14 15 16 17 18 CV r', Ln00cc E `JJ n , \ \ PROJECT REFERENCE SHEET NO. \ ` —� 41 17BP.7.R.138 — GUILFORD 584 4 \ �J) d DENOTES IMPACTS IN ROADWAY DESIGN HYDRAULICS I \\ \\ 0SURFACE WATER ENGINEER ENGINEER k \ & 74y, DENOTES TEMPORARY , \ S IMPACTS IN SURFACE WATER k , \ ^ MOTT MACDONALD I& E,LLC VHB ENGINEERING \ (V ) LICENSE NO.F-0669 LICENSE NO.C-3705 DOCUMENT NOT CONSIDERED FINAL \ / DENOTES FILL INUNLESS ALL SIGNATURES COMPLETED SLABvi F F WETLAND Prepared in the �/� Al / Office of: IYI M MOTT '"' F quay PO XVariOna,NC 27526 - - MACDONALD www.mottmac.com/americas ` 'v►'.; VHB Engineering NC, P.C. (C-3705) 4 , DENOTES HAND �`, I^� 940 Main Campus Drive,suite 500 Y I1V Raleigh,NC 27606 1‘ / CLEARING , tp i \ ., 1-61\ HORIZONTAL SCALE iA V.'i i i Lb...ILI...1;1i 0 7- c\( 0 *) i v 't • k PERMIT DRAWING \ / , \ 111 \ SHEET 4 OF 6 �, 03----L N _ 4 6a \ ______ ____ _ SITE N _ k //L B______ m mI 1 i1 — I c. , i ODS iiik `� ____ ____ itk \ , " \)g:// p NOOD9 m m %--- n \ pDEWINWT ) - 1(;41111** 74.41V1:11: r___1-, ) S pk InlhotaillAinliVIIMerrindailiMPIL ' - - a"- - - - - - - 7 Ai err PDE uS\ -Z-\ \ ., p D E - n \ C% / P D E ------------------------ \ / AdriANIFAAAFT rAK_____t___ r r r r\, 0 N -4 Ikk_ \ s i _. Atioicaliwilaremmt-;34.-•• t, • .•••:Ann.„4000011173:Mfizo C \ • 1 I ' ,sookillA A. fa •• -‘0.0 eiv% Aisrw' II .. ,i,._______ .,,.._ ._.__ ....__„___ , " litk- , it& I , ...N AltittatiO ------- : - ----- I I - ‘ tWiti . ‘lab‘ , 04k W CO1 WiliAl -----------'D "111"Pir'- AlallPlirw'innirwIIII - - INE- T __________ - 111--C---P-- , L 0 L.,... ..._-1._ _ _ lit,m,„„._\ '1411._, - ......1006., , A ''''' WM 110 if• i I I atif I - _____----- \_ - . ffiiii1WItli Wiwi. •,/, IM•►1MICIMIMMC, __ - Aav' ll i _.... --- wWw ---= XMPFUO---- OP _ A1. i\ L i air \ to 1\4 830 \3 '„rpm._ Ale ) , . ,_\ . 0_, eti A --- Atlig r It Mr- . :Po: ZIENTM IIIVIRVA % - Nig USN/ /%ft" 4 _ _ P P 5 cia I ,, 1 41 I -7,1- 1 -Y 0 _______________________ - - --- tattO 11 . _____ ____,___________----_____--- aratildititti TIPAlh i _ = r7 10`V:-.11h�►ti�4 ���:T ti�ti �r j _ .� _ r 41141111 -- TS - Ck4PI 11--- it cnn ,____________j3 44 n )-) c-1- %10, oik 1 \ \ DUe kaNq fl,p_, , it • U ‘r 4N4 , Cil ► i D W 0 0 6 C �i► ' R I 1 t D w i L)' / Up ve. ♦ � DUE N D � 9 U E , , \ cs) . . . . . . . . . . . . . . . . . . . . . . _ PROJECT REFERENCE SHEET NO. I I I I I I I I I 17BP.7.R.138 - GUILFORD 584 X-2 150I : : : 140 I : : : I130: : : •: : •:1120I : : : : : 110 : : : : : i 1OQ: : : : : : ; : : : : 80 70 60 50 40 30 2-0 10 0 10 20 30 40 50 &0 7`0 eo 90 100 1)0 120 130 140 150 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . VRM1TDRAWING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ru: 1 SHEET 5OF 6 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . " " " WETLANDS / k . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . PDE : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : 690 . . . . . . . . . . . . . . . . . . . . . . . . . : . MECHANIiED 1 W . . . . . . . . . . . . . . . . . . . CLEARING k 1 0 fl2N f125 W �-- _ . -- . - � I � `i - ---+ -�-�U- ... . - ------ --------� __ . ' , ��� FkflO `y` of �I-1T- -1-H- ffi----- .. . . __ -_-- - WETLAND15 + 670670 . . _ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . _ _ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . t ,..... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . tI) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Fi9n Fi90 W L 0 025 _ _ 0.025 14 ..........., ______ ..._ � ��'-- -- 68E-.2C r" ......` Fy8 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . - r7o I . 15 + 00 . 00670 END BRIDGE 14 + 75 . 00 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Fi90 Fi9O mL _- 0.025 0.025 I ..,.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . _ . W W 680 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F►�30 . . . . . . . . . . . . . . . . . . . . . --- . - - 4mm. ., ------- . _I J I I .1- _ ------ ----- .-----.-- . . ---ZT--m i--rn-rrl-rr---H------------- ------------_-. --- -- ------ ----�- ------ _---- -- __- 675.81 ..... ...... ....... F17o . _. _. . _ _ -----__ .-------_ 670 14 + 50 . 00 t 60 Fi60 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Fi9n . . .. Fi9O at-o 0f175 0075 J X W 7 . . . . . . . . . . . . . . . . . . . . 680 i al 0o670 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 670 s) 14 + 00 . 00 `1u.) ) BEGIN BIIDE13 + 75 . 0O cn . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 ID 690 to Fi sz E + 0.U25 - 0.025 ill 1 0 __--i-- 685.5C -r —-�. . .7 --- _ — LL_— --------- ---- --�'' �� -- - ---- --- ._ _ cc - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1-1 1--Is 13 + 50 . 00 � 7 � NLc 1� is i N-0 a \ 7E 1 • ��� 150 140 I�30 �20 ��Q 100 9C 80 60 - 50 - 40 - 30 - 2-0 10 0 1 D - 20 - 30 - 40 - 50 60 70 S0 90 100 110 120 130 140 150 in± E I II I III II III III - II III III II II II II WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size/Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) _ (ac) (ft) (ft) (ft) 1 -L-14+20 TO 16+14 )100'39"BOX BEAM W/4'-0"CA 0.02 0.04 <0.01 <0.01 5 10 TOTALS*: 0.02 0.04 <0.01 <0.01 5 10 0 *Rounded totals are sum of actual impacts I NOTES: NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 5/4/2021 GUILFORD SF-400584 17BP.7.R.138 Revised 2018 Feb SHEET 6 OF 6