Loading...
HomeMy WebLinkAbout20080472 Ver 3_More Info Received_20130617Soil & Environmental Consultants, PA 11010 Raven Ridge Road • Raleigh, North Carolina 27614 • Phone: (919) 846 -5900 • Fax: (919) 846 -9467 www.sandEc.com June 17, 2013 S &EC Project # 12048.P1 DWQ No. # 08- 0472.0 N.C. Division of Water Quality WeBSCaPe Unit Attn: Annette Lucas 512 North Salisbury St., 9" Floor Raleigh, NC 27604 Re: Reply to the Division of Water Quality's April 26, 2013 request for additional information Gray's Creek Subdivision Wake County, North Carolina Dear Ms. Lucas: This letter is in response to your letter dated April 26, 2013 which requested additional information for the Gray's Creek Subdivision project. The following restates your questions /comments and is then followed by our response. Additional Information Requested 1. Please submit your site plan on full -sized plan sheets at a scale of no smaller than I " =50' showing the impacts in context with the entire property. Per a May 8, 2013 meeting had between Ms. Annette Lucas (DWQ WeBSCaPe Stormwater Engineer) and Ms. Chem Smith and a subsequent email, we have attached two (2) full sized sets of the project site overall with the property boundaries and proposed impact areas clearly labeled. At the above mentioned meeting, we left a hard copy plan sheet for DWQ's use. It is our understanding that these three (3) copies will satisfy DWQ requirements to insure that the project is properly processed. 2. Clearly show the limits of all wetlands and streams as overlays on the site plan. Per the May 8, 2013 meeting, this was addressed on the previously provided site plan. As requested, we are including 2 additional hard copies of the site plan for DWQ's use. 3. Clearly show stream impacts including fill slopes, dissipaters, and bank stabilization on the site plan. in? 19 @`1 IN Ow 19 10) JUN 1 7 2013 Per the May 8, 2013 meeting, this was addressed on the previously provided site plan. As requested, we are including two (2) additional hard copies of the site plan for DWQ's use. Additionally, we have included two (2) hard copies of the individual impact maps to clarify the impact locations. 4. Clearly show wetland impacts including fill slopes on the site plan. Per the May 8, 2013 meeting, this was addressed on the previously provided site plan. As requested, we are including two (2) additional hard copies of the site plan for DWQ's use. Additionally, we have included two (2) hard copies of the individual impact maps to clarify the impact locations. S. Please provide a Required Items Checklist with ALL required items for each of the two proposed dry detention basins. Failure to provide this information in the next submittal (including the soils report documenting the level of the season high water table) will result in a return of application. As requested during the May 8h meeting, we have provided a CD that includes the necessary Required Items Checklist. Per the discussions at the meeting, the project Engineer (Alpha & Omega Group) included the stormwater calculations for Ponds 1 and 2. Within these documents are the calculations for the ponds and the checklist. Where necessary, an explanation was provided for any "flagged" areas in a letter from Alpha & Omega (also included on the data CD). Finally, the soils report is also included as required. 6 Please provide a level spreader - engineered filter strip at the outlets of each of the dry detention basins to provide additional treatment. The level spreader - engineered filter strip shall comply with Chapter 8 of the BMP Manual. Please provide a supplement form for each level spreader - engineered filter strip with the required items checklist and all required items. As discussed during the May 8h meeting, Mr. Keith Roberts (Alpha & Omega Group) explained that during the initial meetings with DWQ on this project in 2008, it was determined that level spreaders were not feasible due to the site constraints. The resultant plan, which was approved by DWQ in 2008, included the dry detention basins. Further, the basins are designed to store run -off for two plus (2 +) days. The 100 -year point discharge has a peak of 0.65 cfs with a 4 -inch orifice on these proposed basins. In the first submittal in 2008, Mr. Roberts had shown one (1) discharge point within the middle of the development; during subsequent submittals to DWQ that year, this single discharge point was broken up in order to lessen the flows and ultimately was approved by DWQ. During the recent meeting with DWQ, Annette re- approved the use of pre - formed scour holes as originally approved (2008) and requested a complete site plan that shows the drainage areas and locations of the pre - formed scour holes. This information has been provided on the attached data CD. 7. Please address the following design issues with the dry detention basins: a. The basin side slopes are listed as 3:1 in the supplement but are 2:1 on the plan sheets. Please provide 3:1 side slopes within the dry detention basins per the BMP manual. Please refer to Impact Maps 3F and 3G which identify the side slopes of the basins as 3:1. b. Please provide an orifice size that will detain the stormwater for a period of two to five days. Please refer to the Stormwater Calculations Narrative (titled Pond 1 and Pond 2 on the attached data CD) which provides the requested calculations and reasoning. c. Please provide an additional 25% storage volume for sediment deposition. Please refer to the Stormwater Calculations Narrative (titled Pond 1 and Pond 2 on the attached data CD) which provides the requested calculations and reasoning. It should be noted that this volume is provide in the supplemental checklist already. Please feel free to call me if you require any further explanation. Sincerely, SOIL & ENVIRONMENTAL CONSULTANTS, PA Nicole J. Thomson Regulatory Specialist Attachments: 2 copies of Response letter 2 copies of DWQ Request for More Information Letters (dated February 24, 2012) 2 copies of explanation letter from Alpha & Omega Group 2 copies of the Overall Site Plan 2 copies of the Drainage Area Map 2 copies of individual discharge points map 1 data CD of stormwater information (which also includes the above) NCDEE R North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Charles Wakild, P.E. John E. Skvada, III Governor Director Secretary April 26, 2013 Certified Mail Return Receiot Requested 70121640 00019606 4322 Gray's Creek Developers, LLC Attn: Bruce Herbert 1210 Trinity Road, Ste. 102 Raleigh, NC 27607 Subject: REQUEST FOR ADDITIONAL INFORMATION Gray's Creek Subdivision Dear Mr. Herbert: DWQ # 08- 0472v3 Wake County R�i E C E I V fFN If 0 APR 3 0 2013 BY Sa:f 6tncn,:�eirral [;rns�rltalrts WA On March 22, 2013, the Division of Water Quality (Division) received your application dated March 22, 2013, requesting a 401 Water Quality Certification (401 Certification) from the Division for your project. The Division has determined that your application is incomplete and cannot be processed because the plan sheets submitted were not of sufficient detail to determine if impacts have been avoided and minimized. In addition, there are some outstanding stormwater issues that still need to be addressed. We are sympathetic to the fact that your previous 401 Certification has expired, and your project has remained essentially the same, but we need to be completely clear about what we're reviewing at this time. The application is on -hold until the following information is received: 1. Please submit your site plan on full -sized plan sheets at a scale of no smaller than 1 " =50' showing the impacts in context,with the entire property. 2. Clearly show the limits of all wetlands and streams as overlays on the site plan. 3. Clearly show stream impacts including fill slopes, dissipaters, and bank stabilization on the site plan. 4. Clearly show wetland impacts including fill slopes on the site plan. Wetlands, Buffers, Stormwater, Compliance and Permitting Unit (WeBSCaPe) 1650 Mad Service Center, Raleigh, North Carolina 27699 -1650 One Phone: 919-807.6301TAX. 919 - 807 -6494 NorthCarolina Internet Opportunity alive coon s a��lUN� //I An Equal Opportunity 1 Affirmative Action Employer � �/ ` ` " ✓U Grays Creek Subdivision DWQ# 08- 0472v3 Request for Additional Information Page 2 of 3 5. Please provide a Required Items Checklist with ALL required items for each of the two proposed dry detention basins. Failure to provide this information in the next submittal (including the soils report documenting the level of the seasonal high water table) will result in a return of application. 6. Please provide a level spreader - engineered filter strip at the outlets of each of the dry detention basins to provide additional treatment. The level spreader - engineered filter strip shall comply with Chapter 8 of the BMP Manual. Please provide a supplement form for each level spreader - engineered filter strip with the required items checklist and all required items. 7. Please address the following design issues with the dry detention basins: a. The basin side slopes within are listed as 3:1 in the supplement form but are 2:1 on the plan sheets. Please provide 3:1 side slopes within the dry detention basins per the BMP Manual. b. Please provide an orifice size that will detain the stormwater for a period of two to five days. c. Please provide an additional 25% storage volume for sediment deposition. Pursuant to Title 15A NCAC 02H .0502(c) and Title 1SA NCAC 02B .0233 (8) , the applicant shall furnish all of the above requested information for the proper consideration of the application. If all of the requested information is not received in writing within 30 calendar days of receipt of this letter, the Division will be unable to approve the application and it will be returned. The return of this project will necessitate reapplication to the Division for approval, including a complete application package and the appropriate fee. Please respond in writing within 30 calendar days of receipt of this letter by sending four copies of all of the above requested information to the Wetlands, Buffers, Stormwater — Compliance and Permitting (Webscape) Unit, 1650 Mail Service Center, Raleigh, NC 27699 -1650. Please be aware that you have no authorization under the Water Quality Certification Rules for this activity and any work done within waters of the state may be a violation of North Carolina General Statutes and Administrative Code. Please contact Cherri Smith at 919 - 791 -4251 or cherri.smith @ncdenr.eov if you have any questions or concerns. For questions related to stormwater, please contact Annette Lucas at 919 - 807 -6381 or annette.lucas @ncdenr.gov. Grays Creek Subdivision DWQ# 08- 0472v3 Request for Additional Information Page 3 of 3 IS' rely, XSWater Danny Supervisor Surfac Protection — Raleigh Regional Office cc: U.S. Army Corps of Engineers; Raleigh Regulatory Field Office; 3331 Heritage Trade Drive, St. 105; Wake Forest, NC 27597 DWQ RRO 401 files Nichole J. Thomson; Soil & Environmental Consultants, PA; 11010 Raven Ridge Road; Raleigh, NC 27614 Annette Lacas, PE NCDENR-DWQ V-94 A-W Raleigh, NC 27604 p,\7-013000\2013_010 -grays creek subdivision,cng\rcpons\subiiiitials 5-20-131--­- creek snip letter 5-21-13.doc mmummusem� 4601 Lakr Boom Trail Suire 3C Raleigh, North Carolina 27607 Phone 919 981 03 tO Fay 919 9,q 1 015:1 Y, w iv..rOg r i, mp. f" . Annette, Lucas June 6, 2013 Page 2 of 2 If you have any questions please do not hesitate to call. Sincerely, Alpha & Omega Group Wwal(dwck one): doesnot incor�orate a vegetated filter at the outlet, 7j Form SW40 ]-Dry Detention O&M-Rev.3 Page I of 4 5 days after a storm event. ■ r i e WMI �ml u III 1� _ • - ' �I �� i I '�M ^ �,6 i , Ij -110,111, ■ ■ ■ 2111MI Form SW401 -Dry Detention O&M-Rev.3 Paget of No =I". (see diagram below). dispose of it Mi a location where it will not cause impacts to streams or the g _ •. Fxosion has occurred o i 111 ■ a riprap displaced. r. . ■ ■ .6.:. ie main treatment area Mom of the al design deplh (see diagram below) 5 days after a storm event. ■ r i e WMI �ml u III 1� _ • - ' �I �� i I '�M ^ �,6 i , Ij -110,111, ■ ■ ■ 2111MI Form SW401 -Dry Detention O&M-Rev.3 Paget of The ineasuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the basin depth reads NJA feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) V Temporary Pool Elevation 2L9 Sediment Removal E T porn � T �25% `�--~ Bottom NZA----~----~---------------~-- Sediment Bottom Elevation 2 Storage FOREHAY MAIN POND Permit se m t P f' d.. Pi -oJect naine:GjM 's Creek BAIP dr•aina e area nuruber : ;# i i • V. t Land AcquifiLtiLon Nate: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and aresident of the subdivision has been named the president. rr r m g�r m P... m �` us • } "a CO's' y Permit Number: (to be provided by D [YQ9) Drainage Area Number: Dry Extended Detention Basin Operation and Maintenance Agreement 1 114, ii 1 1, NOW IMM'Ift W -111, . F pro 4mately six inches. Wnce a year, a darn safety expert will inspect the embankment. be re■ahed immediately. Form 5NV401-Dry Detention O&M-Rev.3 Page I of 4 - m Q t t • # r..JI -� - s cracked or � replace -the pipe. damaged (if ME the plants rather than more than ITIfater is f W i ■. Bw ■ tt: :! f : ■. t Erosion ! a + sivale (if applicable). The forebay Search for the source of the of the original design depth (see diagram below). - i- Erosion has occurred I SuFM MR. riprap is displaced. ME the plants rather than more than ITIfater is f W i ■. Bw ■ tt: :! f : ■. t . 4 111 01t When the basin depth reads N A feet in the forebay, the sediment shall be removed. Storage FORERAY MAIN POND -Rev.3 Pogo 3M t- Pi -oject n aatmc:Gra)'s +Creek BAP drainage cater number: 2 Director t Ar4gisition MwAff i Note: The legally responsible party should not be a homeowners association unless niorc than 50% of the lots lanve been sold and as resident of the subdivision has been named the president. "I My commission expires SUBDIVISION, ROAD CROSSING, AND STORMWATER DESIGN PROVIDED BY DEVELOPMENT CONSULTING SERVICE, INC. GRAPHIC SCALE 1" = 200' 200' 0 200' 400' ALPHA & OMEGA GROUP C, I V I I, & S "I R U C T U R n L F. N G I N F. E R S a BooneTrail Suite 3C Raleigh, NC 27607 Phone 919 981 0310 Fax 919 981 0451 wwtv.aogroup.com .. LEGEND JURISDICTIONAL STREAM CHANNELS THAT ARE ALSO SUBJECT TO THE FUQUAY - VARINA RIPARIAN BUFFER RULES PIN "IIA JURISDICTIONAL WETLANDS WETLAND IMPACTS NOTES: 1.) THE DESIGNATION AND LIMITS OF THESE FEATURES MUST BE VERIFIED BY THE US ARMY CORPS OF ENGINEERS. 2.) CROSSING AND STORMWATER DESIGN PROVIDED BY DEVELOPMENT CONSULTING SERVICES, PA STORMWATER PLAN &WETLAND IMPACT MAP GRAYS CREEK SUBDIVISION FUQUAY- VARINA WAKE COUNTY, NC DATE: 06 -05 -13 REVISED SCALE: I" = 200' DRAWN BY: JDH CHK'D BY: DHW PROJECT #: 60022 FIGURE # : 3 X I GRAPHIC SCALE 1 " =50' 60, 0 60, 100, ALPHA &- OMEGA GROUP C, I V 1 1, & S T R U C F U R A 1, FNGJNEERS 460ILa BooneTrail Suite 3C Raleigh, NC 27607 Phone 919 981 0310 Fax 919 981 0451 wwtv.aogroup.com Firm License No. C-1684 STORMWATER PLAN & WETLAND IMPACT MAP GRAYS CREEK SUBDIVISION FUQUAY-VARINA WAKE COUNTY, NC DATE: 06-05-13 REVISED SCALE: V = 50' DRAWN BY: JDH CHK'D BY: DHW PROJECT #: 60022 FIGURE #: 313 ............. .. . . ....................... ............................................................................... . .. . ... . .. . ... . . . .... . ..... .. ... .. ........................................................................................... . . ........................................................................................ ..... .................... . 5 L . ..................................................................................... ........................................... - ................. ........... . .. ..... .......................................................................................... --@ 0,50% 15" RC .......................... ..... CB34 FL. IN=256.96 (CB34A Cn -C) FL. IN=256.96 (Y1 ............................................................................................... ...... . ..... . .... . .. . ......... . ....... 00 .............................. ........................................ ............................................. .. ............... ............................. .... . .......... `� ................. ................ ......... := \ RIM=246.89 —ft—. 1,11, IN—M.65-03 FL. OUT=239. 5 ati GRAPHIC SCALE 1 " =50' 60, 0 60, 100, ALPHA &- OMEGA GROUP C, I V 1 1, & S T R U C F U R A 1, FNGJNEERS 460ILa BooneTrail Suite 3C Raleigh, NC 27607 Phone 919 981 0310 Fax 919 981 0451 wwtv.aogroup.com Firm License No. C-1684 STORMWATER PLAN & WETLAND IMPACT MAP GRAYS CREEK SUBDIVISION FUQUAY-VARINA WAKE COUNTY, NC DATE: 06-05-13 REVISED SCALE: V = 50' DRAWN BY: JDH CHK'D BY: DHW PROJECT #: 60022 FIGURE #: 313 GRAPHIC SCALE 1 " =50' 60, 0 60, 100, ALPHA &- OMEGA GROUP C, I V 1 1, & S T R U C F U R A 1, FNGJNEERS 460ILa BooneTrail Suite 3C Raleigh, NC 27607 Phone 919 981 0310 Fax 919 981 0451 wwtv.aogroup.com Firm License No. C-1684 STORMWATER PLAN & WETLAND IMPACT MAP GRAYS CREEK SUBDIVISION FUQUAY-VARINA WAKE COUNTY, NC DATE: 06-05-13 REVISED SCALE: I" = 50' DRAWN BY: JDH CHK'D BY: DHW PROJECT 60022 FIGURE 3C 0- ' 3' C DIP M A14N INCE R'O\B E R T -48-56 1 N: 06 6 8 0 '8 D I P PIN: 0656 9 6 81, LENZIE & KIMBERLY Pj --i W 2 0 8, 3� ................. ............................................... ZO�Z R-�,,15 0-) .................. ......... . ............. .................................... .............. ............ -10 ZONING: R 77 M-0 - 'Z� Ln 44 - \ USE: \VACANT, ' <-)' �—> cb LC) SINGLE FAMILY _,;� :�� Cn GRAPHIC SCALE 1 " =50' 60, 0 60, 100, ALPHA &- OMEGA GROUP C, I V 1 1, & S T R U C F U R A 1, FNGJNEERS 460ILa BooneTrail Suite 3C Raleigh, NC 27607 Phone 919 981 0310 Fax 919 981 0451 wwtv.aogroup.com Firm License No. C-1684 STORMWATER PLAN & WETLAND IMPACT MAP GRAYS CREEK SUBDIVISION FUQUAY-VARINA WAKE COUNTY, NC DATE: 06-05-13 REVISED SCALE: V = 50' DRAWN BY: JDH CHK'D BY: DHW PROJECT #: 60022 FIGURE #: 3D 10769 7 L.�. / /,, Q " Z XS `` Ay 1'wx�, "Lx2 D 0= i3'd 4'x4 RISER STRUCTURE EL 239 EMERGENCY SPILLWAY EL. 238 � EL. 238 CONSTRUCTION SEQUENCE RETENTION POND 1. Insure the site is stabilized and confirm with the enviromental Engineer, DENR 791 -4200. 2. Remove all erosion control devices from the basins. 3. Check basins and orifices for any debris and clean as needed. 4. Install retention ponds as shown on the approved plans. Clear only as necessary to install these devices. 5. Seed any disturbed areas inside and outside of the pond. 24ARCP INSTALL 2'x 8'x8' CONCRETE BASE CROSS SECTION OF DAM NTS T11 A 0"11 1 r% A 0 %1 24" RCP Alf / \r%I r1 JON, r 4'x4' RISER STRUCTURE NTS GRAPHIC SCALE V. = 50' 50' 0 50' 100' OUT =229. tt' 6,754 Nttt FL. U =236.75 _ v � v Ott O t� �t t �, t= F � c c� . > >> o ............ _ 9 g �FL. I =2 43,(CB3 ) STONE APRO 6'Wxl 2'Lxl S" K f1— PRCJPOEED �5`COVR H LE #4 4.5x4:5' BA Ste' W/ 2' DEP Tb (SEE DETAIL I" - 30 ) ALPHA & OMEGA GROUP C I V I L & S I R U C T U R A L L N G I N E E R S 4601LakeBooneTrail Suite 3C Raleigh, NC 27607 Phone 919 981 0310 Fax 919 981 0451 www.aogroup.com Firm License No. C -1684 PIPE 0 BUIEfi c' InnT T(IFAI LINER: CLASS B RIPRAP (D50 =8) WITH TYPE 2 FILTER FABRIC SCOUR HOLE CONSTRUCTION SEQUENCE 1. SITE MUST BE STABLIZED BEFORE INSTALLATION OF SCOUR HOLE SHALL TAKE PLACE. CONFIRM WITH WAKE COUNTY ENVIRONMENTAL ENGINEER. 2. ENSURE THAT PSRM APRON IS FLUSH WITH NATURAL GROUND. J. RIPRAP SHOULD BE A WELL- GRADED MIXTURE OF STONE. SMALLER SIZE RIPRAP SHOULD FILL VOIDS BETWEEN LARGER STONES. 4. IMMEDIATELY STABILIZE DISTURBED AREAS AFTER CONSTRUCTION WITH VEGETATION. 5. CLEAR AREA OF CONSTRUCTION DEBRIS. NOTE: IF SCOUR IS INSTALLED IN A FILL SLOPE, SOIL SHALL BE COMPACTED TO 959 OF STANDARD PROCTOR TEST LEVELS PRIOR TO INSTALLATION AND SEEDING. f OUTLET PIPE 2 ? 2y. N =1 ° — Cn 0 PREFORMED SCOUR HOLE NTS STANDARD WIDTH OF PSRM ROLL • PSRM - INSTALL LEVEL AND FLUSH WITH NATURAL GROUND • PSRM SHALL BE SEEDED WITH VEGETATION AT INSTALLATION. STORMWATER PLAN & WETLAND IMPACT MAP GRAYS CREEK SUBDIVISION FUQUAY- VARINA WAKE COUNTY, NC DATE: 06 -05 -13 REVISED SCALE: I" = 50' DRAWN BY: JDH CHK'D BY: DHW PROJECT #: 60022 FIGURE #: 3F B32 IM =23 .66 F If =233. 7 (CB 2A) FL. IN= 233.07 (C 33) f fti FL. UT =23 .97 57.34 L.F. @ 0.50 { :.'... ,e- . { 1 RCP F .OUT= 32.00 c ..................................................................................................................... 9. . 9........... ..............................' ............. ............................... .. R OUTLET PIPE 2 ? 2y. N =1 ° — Cn 0 PREFORMED SCOUR HOLE NTS STANDARD WIDTH OF PSRM ROLL • PSRM - INSTALL LEVEL AND FLUSH WITH NATURAL GROUND • PSRM SHALL BE SEEDED WITH VEGETATION AT INSTALLATION. STORMWATER PLAN & WETLAND IMPACT MAP GRAYS CREEK SUBDIVISION FUQUAY- VARINA WAKE COUNTY, NC DATE: 06 -05 -13 REVISED SCALE: I" = 50' DRAWN BY: JDH CHK'D BY: DHW PROJECT #: 60022 FIGURE #: 3F 335 S. FL. I N 6,137 S. IF C 2 FI/IN =1 V 1 ) 4'x4 RISER STRUCTURE \. EL. 19625 EL. 198 18 "RCP rr T 1 ; d '•y r^ EMERGENCY SPILLWAY TRARH RACK 4'x4' RISER STRUCTURE GRAPHIC SCALE V. = 50' 50' 0 50' 100' 1J2" Rr`_P A" C)P1F=1 _F= I" - 30 ) ALPHA & OMEGA GROUP C I V I L & S I R U C T U R A L L N G I N E L R S 4601LakeBooneTrail Suite 3C Raleigh, NC 27607 Phone 919 981 0310 Fax 919 981 0451 www.aogroup.com Firm License No. C -1684 OUTLET PIPE LINER: CLASS B RIPRAP (D50=8") WITH TYPE 2 FILTER FABRIC SCOUR HOLE CONSTRUCTION SEQUENCE 1. SITE MUST BE STABLIZED BEFORE INSTALLATION OF SCOUR HOLE SHALL TAKE PLACE. CONFIRM WITH WAKE COUNTY ENVIRONMENTAL ENGINEER. 2. ENSURE THAT PSRM APRON IS FLUSH WITH NATURAL GROUND. J. RIPRAP SHOULD BE A WELL- GRADED MIXTURE OF STONE. SMALLER SIZE RIPRAP SHOULD FILL VOIDS BETWEEN LARGER STONES. 4. IMMEDIATELY STABILIZE DISTURBED AREAS AFTER CONSTRUCTION WITH VEGETATION. 5. CLEAR AREA OF CONSTRUCTION DEBRIS. NOTE: IF SCOUR IS INSTALLED IN A FILL SLOPE, SOIL SHALL BE COMPACTED TO 959 OF STANDARD PROCTOR TEST LEVELS PRIOR TO INSTALLATION AND SEEDING. 2 N O O 0 PREFORMED SCOUR HOLE NTS STANDARD WIDTH OF PSRM ROLL • PSRM - INSTALL LEVEL AND FLUSH WITH NATURAL GROUND • PSRM SHALL BE SEEDED WITH VEGETATION AT INSTALLATION. STORMWATER PLAN & WETLAND IMPACT MAP GRAYS CREEK SUBDIVISION FUQUAY- VARINA WAKE COUNTY, NC DATE: 06 -05 -13 REVISED SCALE: 1" = 50' DRAWN BY: JDH CHK'D BY: DHW PROJECT #: 60022 FIGURE # : 3G i f r �f 1 7-ii J3, 261 " +tttHio LLLLI U 2013.010 REYI E 5/0,/201 5 v � w w cr- UOf tCY ZD LL- J3, 261 " +tttHio LLLLI U 2013.010 REYI E 5/0,/201 5 "rays i :. o . q • Varina, March 20, 2013 W1 F 19 ■ FWAS -_ i M C C V I T, S T R 11 r T -1' It A L [ m t. 1 N G T it -s 4601 Lake Boone Trail, Ste. 3C - Raleigh, NC 27607 Phone 919 981 0310 Fax 919 981 0451 Firm LicendeNa. C -1684 " fvIN.aOgrOup..C.O'in Contact person Phone number Rate Drainage area number Peak Flow Calculations 1 -yr, 24 -hr rainfall depth Rational C, pre- development Rational C, post - development Rainfall intensity: l -yr, 24 -hr storm Pre - development 1 -yr, 24 -hr peak flow Post - development 1-yr, 24 -hr peak Row PrelPost 1 -yr, 24 -hr peak control Storage Volume: felon -SA Waters Minimum required volume Provided volume Sediment storage volume provided Storage Volume: SA Waters 1.5 runoff volume' Pre- development 1 -yr, 24 -hr runoff volume Post - development 1 -yr, 24 -hr runoff volume Minimum required volume` Provided volume Sediment storage volume provided Basin Design Parameters arawdown time SI-IWT elevation Basin bottom elevation Storage elevation Basin side slopes 'fop elevation Freeboard provided Basin Bottom Dimensions Basin length Basin width Length to width ratio 25,355.00 fe in 0.25 (unitless) 0.55 (unitless) 7,25 -10yr in/hr 38.43 felsec 0.57 felsec -37.86 ft3lsec 25,355.00 fe 37,580.00 fly OK 12,231.00 fP Rlfi fl3 ff3 f13 ft ft3 W 2.00 days 232.80 Q( fmsl 235.00 fmsl 238.00 OK fmsl 3.0 :1 OK 239.00 fmsl OK 1.00 ft RK'_ r rI' E Form SW401 -Dryr Extended Detention Basin -Rev.3 Parts 1. & 11, design Summary, rage 1 ;of 2 Additional Information Total runoff volume captured by basin Forbay provided Is basin in a recorded drainage easement? Does basin capture all runoff at ultimate build- out? Is a sediment depth indicator included? Does the basin include a drain? 6.98 ac -in N (Y or N ) : Y (Y or N ) : Y (Y or N) Y (Y or N ) ' Y (Y or N) Forebay is not ruquirad 1 Permit No. (to be provided by DVVQ) Form SW40 -Dry Extended Detention Basin -Rev:3 Parts I, & If. Design Summary, Page 2 of 2; Permit No. fto be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An Incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below, If a requirement has not been met, attach justification. Form SW401 -Dry Extended Detention Basin -Rev. 3 Part 111. Required Items Checklist, Page I of 1 Page/ Plan Initials Sheet No. :34 - -3P— 1. Plans (1 59 or larger) of the entire site showing: - Design at ultimate buitd-out, - Off-site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. 2. Plan details (1" = 30' or larger) for the bioretention cell showing: - Basin dimensions - Pretreatment system, - Maintenance access, - Outlet structure, - Overflow device, - Flow distribution detail for basin inflow, and - Vegetation specifications. PWI :3 F 3. Section view of the basin 0' = 2G' or larger) showing: Side slopes, 3:1 or lower, Pretreatment and treatment areas, and Inlet and outlet structures. pw/ l IV14 - - 6. A construction sequence that shows how the dry detention basin will be protected from sediment until the entire drainage area is stabilized. W 7. The supporting calculations. I? VV 8. A copy of the signed and notarized operation and maintenance (O&M) agreement. 9. A copy of the deed restrictions (if required). 10, A soils report that Is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401 -Dry Extended Detention Basin -Rev. 3 Part 111. Required Items Checklist, Page I of 1 IM Hydrafiow Hydrographs Extension for AutoCADO Civil 3D@ 2013 by Autodesk, Inc. v1 0 Thursday, 0616 / 2013 Hyd. No. 2 SCS Hydrograph type SC S Runoff Peak discharge = 2.967 cfs Storm frequency 1 yrs Time to peak = 11.97 hrs Time interval 2 min Hyd. volume = 8,235 cult Drainage area = 21.200 ac Curve number = 82* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total pr cip l 1 0 0 .. i in -l'; Distribution = Type 11 Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) ® [(8.8{)O x 913) + (12,400 x 70)] 1 21,200 SCS Hyd. No. 2 -- I Year NM IM FTM M MW 0 2 4 6 8 10 12 14 16 18 20 22 24 26 - Hyd No. 2 Time (hrs) Hydraflow Hydrographs Extension for AutoCAD@ Civil 3E)@ 2013 by Autodesk, Inc. vi 0 Hyd. No. 2 Hyd. No. 3 SCS Pond 1 Hydrograph type SCS Runoff Hydrograph type Reservoir Peak discharge 2,•67 cfs Peak discharge 0.16 cfs Time to peak 11.97 hrs Time to peak 15.50 h rs Hyd. Volume 8,235 cuft Hyd. Volume 8, 188 Cuft M Mi Un 'CON me: IM 6 11 17 23 28 34 40 45 51 57 Time (hrs) Hydratlow Hydrographs Extension for AutoCAD@ Civil 3DQD 2093 by Autodesk, Inc. v10 Hyd. No. 3 Hyd. No. 3 Pond 1 Pond 1 Hydrograph type = Reservoir Hydrograph type = Reservoir Peak discharge = 0.161 cfs Peak discharge = 0.16 cfs Time to peak = 15.51 hrs Time to pear = 15.501 hrs Hyd. Volume = 8,188 craft Hyd. Volume = 8,188 cuft I is >t "I J1 Hydraflow Hydrographs Extension forAutoCADO Civil 3DO 2013 byAutodesk, Inc, v1O Thursday, 06 612013 Hyd. No. 6 Drainage Area Hydrograph type = Rational Peak discharge = 84.52 cfs Storm frequency Q-Yrs Time to peak = 0.08 hrs Time interval I min Hyd. volume Drainage area 21.200 ac Runoff co ff.> = 0.55* Intensity = 7.249 in/hr Tc by User = 5.00 min I DF Curve SampleFHA.idf Asc/Rec limb fact = Ill Q (Cfs) MW-110 Q (Cfs) ZIU.ULI �u.uu MOO zk 80.00 70.00 MOO 60.00 60.00 50.00 60M 40.00 40.00 30.00 MOO 20.00 or 20.00 MOO 1x.00 000 - noo 0.0 0.0 — Hyd No. 6 0.0 0.1 0.1 0.1 0.1 0.1 0.1 01 0.2 Time (hrs) W Hydraflow Hydrographs Extension for AutoCADO Civil 3D@ 2013 by Autodesk, Inc. v10 Thursday, 06 0 6 12013 Hyd. No. 7 Pond I Hydrograph type Reservoir Peak discharge Storm frequency Time to peak = 0.17hrs Time interval = 1 min Hyd. volume = 25,131 cult Inflow hyd. Pilo'. 6 - Drainage Area Max. Elevation = 237.15 ft Reservoir name POND-1 Max. Storage Storage Indication method used. Up'= 80.00 MOO 60.00 KOO 40.00 30.00 20.00 MOO 0.00 Pond 1 Hyd. No. 7 -® 10 Year Q (cfs) Stage (ft) Elevation (ft) Contour area (sqft) incr. Storage (cuft) Total storage (cuff) 0,00 235.00 9,339 0 0 1.00 236.00 11,350 10,345 10,345 2-00 237.00 13,741 12,546 22,890 100 238.00 15,651 14,696` 7XSS6 4.00 239.00 17,887 16,769 3.33 Culvert !Orifice Structures invert El. (ft) Weir Structures 235.00 0.00 [A] JB] [C] [PrfRsr] = 1 [A] [B] [C] [D] Rise (in) = 24.00 4.00 0.00 0.00 Crest Len (ft) = 16.00 20.00 0:00 0.00 Span (in) = 24.00 4,00 0.00 0.00 Crest El. (ft) = 238,00 239.00 0;00 0.00 No. Barrels = 1 1 0 0 WeIrCoeff. = 3.33 2-60 3.33 3.33 invert El. (ft) = 235.00 235.00 0.00 0,00 Weir Type = 1 Broad 2,00 22,890 Length (ft) = 60.00 0.00 0.00 0,00 Multi-Stage = Yes No No No Slope (%) = 1.00 0.00 0.00 n/a 0.13 is 25.61 s 0.00 25.74 N-value = .013 .013 '013 n1a Orifice CGeff. = 0.60 0.60 0.60 0.60 EAL(Inibir) = 0,000 (by Contour) Multi-Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note: CulverV01fice 0WIDWS are analyzed under inlet (ic) and ouVist (ac) control, Weir risers driecked for entire conditions (ic) and submergence (a), Stage I Storage / Discharge Table Stage Storage Elevation Civ A Civ B CIV C PrfRsr Wr A WrB Wr C Wr D Exi'll User Total ft cult ft cfs cis cfs cfs efs cfs cfs efs cis cfs cfs 0.00 0 235.00 0,00 0.00 0.00 0.00 0.000 1,00 10,345 236.00 0.38 is 0.37 is 0.00 0.00 0,366 2,00 22,890 237-00 0.56 to 0,55 to 0:00 0.00 0,549 3.00 37,5B6 238.00 0,69 is 0.69 1c 0.00 0.00 0.687 4.00 54,355 239.00 25.75 is 0.13 is 25.61 s 0.00 25.74 Hydraflow Hydrographs Extension for AutoCADO Civil 3D02013 by Autodesk, Inc. v1 Hy d. No. 7 Pond 1 Hydrograph type Reservoir Peak discharge Storm fr quenc T 1.00 yrs'.--, Time to peak Time interval I min Hyd, volume Inflow hyd. No. = 6 - Drainage Area Max. Elevation Reservoir name = POND-1 Max. Storage 0. Mir Thursday, 06 16 / 2013 lot 10% g§w Creek ^ u 4}v\wio n u q u d Va n n . NC March 20, 2013 : . . \� \ \ } }� \�� ALPHA & OMEGA \GROUP CIVIL «: 4 #E dTI11, F «l#fr «< 4601 Lake Boone Trail, AS 3C Raleigh, ww 27607 pbone 919 ¥g 0310 Fax 919 981 0451 r License ,« -« tvww.aogroup,cvrn Contact person Phone number Date Drainage area number III, DESIGN INFORMATION Site Characteristics Drainage area 294,030,00 Impervious area 167,706,00 le % Impervious 0.57 Design rainfall depth 1,00 in Peak Flow Calculations 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Hainfall intensity: 1 -yr, 24-hr storm Pre-development 1 -yr, 24-hr peak flow Post-development I -yr, 24-hr peak flow Pre/Post 1 -yr, 24-hr peak control Storage Volume: Non-SA Waters Minimum required volume Provided volume Sediment storage volume provided Storage Volume: SA Waters 1,5' runoff volume Pre-development 1 -yr, 24-hr runoff volume Post-development 1 -yr, 24-hr runoff volume Minimum required volume Provided volume Sediment storage volume provided Basin Design Parameters Drawdown time SHWT elevation Basin bottom elevation Storage elevation Basin side slopes Top elevation Freeboard provided Basin Bottom Dimensions Basin length Basin width Length to width ratio 9,834.00 fits' 19,140.E fi3 OK 12,442.00 _fis OK I fta fta M fmsl Raise basin bottorn, Must be at least 2-5t abme SHWT fmsl :1 OK h5l OK ft OK 125.00 it 45.00 it 2.710 :1 OK Form SW401-Dry Extended Detention Basin-Ray.3 Parts 1. 8 11. Design Summary, Page I of '2 Additional Information Total runoff volume captured by basin Forebay provided Is basin in a recorded drainage easomeni? Does basin capture all runoff at ultimate build-out? Is a sediment depth indicator included? Does the basin include a drain? 2.10 ac-in N (Y or N) Y (Y or N) Y (Y or N) Y _(Y or N) Y —(YorN) Forebay is not required I Permit No. (to be provided by DWO) Form SW401 -Dry Extended Detention Basin-Ray.3 Parts 1. & 11. Design Summary, Page 2 of 2 Permit No. (to be provided by DWQ) 11131:701111134 Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Form SW401-Dry Extended Detention Basin-Rev.3 Part Ill. Required Items Checklist, Page I of 1 Page/ Plan Initials Sheet No. 174I.L, 3A-� 3 F 1; Plans (1 50' or larger) of the entire site showing: Design at ultimate build-out, Off-site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. 3 Cr 2. Plan details (1 ' = 30' or larger) for the bioretention cell showing: Basin dimensions Pretreatment system, Maintenance access, Outlet structure, Overflow device, Flow distribution detail for basin inflow, and Vegetation specifications, D K/ Cr 3, Section view of the basin 0" =20'or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures, A/ZA 6, A construction sequence that shows how the dry detention basin will be protected from sediment until the entire drainage area is stabilized. P K/ 7. The supporting calculations, B. A copy of the signed and notarized operation and maintenance (O&M) agreement. 9, A copy of the deed restrictions (if required). 10, A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information, Form SW401-Dry Extended Detention Basin-Rev.3 Part Ill. Required Items Checklist, Page I of 1 Hydraflow Hydrographs Extension for AutoCADO Civil 3D@ 2013 by Autodesk, Inc. 00 Thursday, 0615 J 2013 Hyd. No. 2 SS Hydrograph type = SS Runoff Peak discharge = 1.497 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyde volume = 3,488 cuft Drainage area = 6.750 ac Curve number = 4* Basin Slope = 0.0% Hydraulic length = 0 ft Te method = User. Time of conc. (Tc) = 5.00 min Total precip. 0- Distribution =Type 11 Storm duration = 4 hrs Shape factor = 484 * Composite (Area/CN) = [(3.850 x 95) + (2.900 x 70)] /'6,750 0 IM MR M EM 120 240 360 4 1440 1560 Time (min) Hydr2flow Hydrographs Extension for AutoCADO Civil 3D@ 2013 by Autodesk, Inc. 00 Hyd. No. 2 Hyd. No. 3 SS Pond 2 Aydrograph type = SCS Runoff Hydrograph type Reservoir Peak discharge = 1.497 cfs Peak discharge 0.09 dfs Time to peak 11.97 hrs, Time to peak 13.70 hrs Hyd. Volume 3,488 cuft Hyd. Volume 3,460 cuft Q (cfs) IMM lim I 1 -yr frequency 8 12 16 23 24 28 32 36 40 D*M one IM r i! Hydraflow Hydr ®graphs Extension for AutoCAD@ Civil 3130 2013 by Autodesk, Inc. v10 Hyd. No. 3 Hyd. O. 3 Pond 2 Pond Hydragraph type = Reservoir Hydrograph type = Reservoir Peak discharge = 0.094 cfs Peak discharge = 0.09 cfs Time to peak - 13.70 hrs Time to peak ='13.70 hrs H d. Volume = 3,460 cult Hyd >. Volume = 3,400 cult Hydraflow Hydrographs Extension for AutoCADO Civil 3D@ 2013 by Autodesk, Inc- 00 Thursday, 0616 1201'3 Hyd. No. 7 Drainage Area Hydrograph type = Rational Peak discharge = 32.78 efs Storm frequency Time to peak = 0.08 hrs Time interval = 1 min Hyd. volume 4"cd. .9 83 At Drainage area 6.750 ac Runoff coeff. = d.67* Intensity 7.249 in/hr Tc by User = 5.00 min OF Curve SampleFHA.idf Asc/Rec limb fact 1/1 * Composite {Area /C)' = [(3.850 x 0.98) + (2,900 x 0-25)] 1 6.750 IW-- - EM M ii i 1i no M 1 11 ii MW 0.00 " I I I I I I I I 1 "0 0.00 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 01 0.2 0.2 - d No. 7 Time (hrs) Hy Hydraflow Hydrographs Extension for AutoCAO(@ Civil 3D@ 2013 by Autodesk, Inc. vio Thursday, 06 / 6 12013 Hyd. No. 8 Pond 2 Hydrograph type = Reservoir Peak discharge -0:A8 3.: cfs,' Storm frequency 10- P- Time to peak 0.17 hrs Time interval 1 min Hyd. volume = 9,807 cuff Inflow hyd. No. = 7 - Drainage Area Max. Elevation = 195.62 ft Reservoir name POND-1 Max. Storage 9-106 ' ;a -cuft 02W.- Stage I Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft" 0.00 194.00 5,376 0 0 1.00 195,00 6,031 5,704 5,704 2.00 1196.00 6,712 6,372 12,075 3.00 197.00 7,418 7,065 E 0,14 4.00 198.00 8,150 7,784 26,924 Culvert I Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [13] [C] [D] Rise (in) = 18-00 4,00 0.00 0,00 Crest Lon (ft) = 16,00 20.00 0.00 0.00 Span (in) = 18.00 4.00 0.00 0.00 Crest El. (ft) = 196.25 107.00 0.00 0,00 No. Barrels = 1 1 0 0 WeIrCoeff . = 3.33 2.60 3.33 3.33 Invert El. (ft) = 194.00 194.00 O:00 0.00 Weir Type = I Broad Length (ft) = 60.00 0,00 0.00 0.00 Multi-Stage = Yes No No No Slope (%) = 1.00 0.00 13.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 ExfiI.(in1hr) = 0.000 = -(by Contotir) Multi-Stage = n/a Yes No No TW Elev. (ft) = 0.00 Nole; Culvervorifice outflows are analyzed under Inlet Jac) and cutlet (oc) control. Weir risers checked for crifice conditims (iclnnd smbrnergence (a). Stage I Storage I Discharge Table Stage Storage Elevation Civ A C B Civ C PrfRsr Wr A Wr 8 WrC Wr D Exfil User Total ft tuft ft cis cfs cfs cis efs cis cfs cfs efs efs cis 0.00 D 194.00 0.00 0.00 0.00 0,00 - 0.000 1.00 5,704 195.00 0.36 is 0.36 ic 0.00 0.00 - 0.361 2.00 12,075 196.00 0.55 is 0.54 is 0 00 0.00 --- --- - 0.545 3,00 19,140 197,00 12.66 is 0.08 is 12.57s 0.00 12.65 4.00 26,924 198.00 15.33 is 0.03 is 15.23 s 52.00 --- 67.26 bi Hydraflow Hydrographs Extension for AutoCADO Civil HM 2013 by Autodesk, Inc. v10 Thursday, 06 16 l 2013 Hyd. Pond 2 Hydrograph type Reservoir Peak discharge —Al: . 67 'cW * 5 Storm frequency :yrs:3 Time to peak = 0.17 hrs Time interval I min Hy. volume = 13,312 cult Inflow hyd. No. = 7 - Drainage Area Max. Elevation = 196,15 ft Reservoir name = POND-1 Max. Storage = 13,139 cu ft 72. 1. F, . ...... . ...... ... ... .... .. CA............. ............. ............. . ............. .................. . ... . ..... . ......... .............. I, ............................................................................ ,77 Number of Profile Description Depth to SHWT as observed from soil morphology 1 27" 2 >4011 all wt: 15" 4 a.. wc I 5" 6 3611 7 38" FT1 ............................................................................... C3) 57> CD Qc .......................................................................... .......... 14 T Number of Profile Description Depth to SHWT as observed from soil morphology 1 27" 2 >4011 3 15" 4 13" 5 5" 6 3611 7 38" c r ' �n a ' C7' C3 0 a z 0 0 z 4 0 0 0 4 Z, C C) �J (U: TV..3: ILI . N 1-4 bA a k U shit ct c a U c C a (.� '-q COO �y A �.+ Ul j Gd CJ r Q Q: m.. rA r C' CD CA as In C:j 0 0 u LO cz un ca U m 4- CP rl 0 0 0 0 0 0 7 -z 7— Z� C.4 cz C) C) C) is 0 0 rl C) C) C) is 0 0 rl CJ i. Cr c u ca sir cl�; o �-+ rA 0 A--- --5 a� ca 6. Qa, 41 7 a rA a o t � fr rat i� r r Lpm r c t f Liam. m L Pia Pook i 'w }} as U F c� w aj [A3 � v cz rA CJ Cr rA U, It f,I ra fl '3 ti.L? :°. Q.. Q C) Cri a qVqyy jV �I VJ Vl ♦,VI `n z yy T j_ VJ Liam. m L Pia Pook i 'w }} EEO= u zmm msm CL Lo .r MY V3 03 4w .Q m Am: m Q u - V) En . u — -V 0 0 0 0 >1 tA c c� C) V3 03 4w .Q m Am: m CD Imam mama ;qmj :13 mw Y 1 1 A 4 9 i LL 5 Am Q tn ® 0 0 r 0 a bo •gin. 4 z z ca e� a� t U .0 •we r.w Qj. 4 e{ 4 /I. b�Yyr F��•Yyyyqq cli >.�-y F Fi pN •.rd '{N .I�yI al M a liM -cl .--ua cz Y V e Y�iY pW y IZ9 rr) U� LL 5 Am TtY ol: iO r4 9 p kV qj .4.0 tz Ln 44 15. 'n 1= i —Edl Ell z4 UD U3 rA C3 rj 61) 0 Ln EZ 00 r1r) 00 00 in 1r) C13 cz cl 0 Qi cz cn cn CMIO ol: iO r4 9 p kV qj .4.0 tz - - - - - - - - - - - - - - - - J / / -74 L! rit \N .......... S j td W z NI N' iN h N N iI!{ N( SUBDIVISION, ROAD CROSSING, AND STORMWATER DESIGN PROVIDED BY DEVELOPMENT CONSULTING SERVICE, INC. GRAPHIC SCALE 1" = 200' 200' 0 200' 400' ALPHA & OMEGA GROUP C, I V 1 1, & S T R U C F U R A 1, FNG1NEERS 460ILa- eBooneTrail Suite 3C Raleigh, NC 27607 Phone 919 981 0310 Fax 919 981 0451 wwtv.aogroup.com Firm License No. C-1684 LEGEND JURISDICTIONAL STREAM CHANNELS THAT ARE ALSO SUBJECT TO THE FUQUAY-VARINA RIPARIAN BUFFER RULES JURISDICTIONAL WETLANDS WETLAND IMPACTS NOTES: 1.) THE DESIGNATION AND LIMITS OF THESE FEATURES MUST BE VERIFIED BY THE US ARMY CORPS OF ENGINEERS. 2.) CROSSING AND STORMWATER DESIGN PROVIDED BY DEVELOPMENT CONSULTING SERVICES, PA STORMWATER PLAN & WETLAND IMPACT MAP GRAYS CREEK SUBDIVISION FUQUAY-VARINA WAKE COUNTY, NC DATE: 06-05-13 REVISED SCALE: 1 "=200' DRAWN BY: JDH CHK'D BY: DHW PROJECT #: 60022 FIGURE #: DA MAP