HomeMy WebLinkAboutNCG160186_COMPLETE FILE - HISTORICAL_20160226STORMWATER DIVISION CODING SHEET
RESCISSIONS
PERMIT NO.
DOC TYPE
❑COMPLETE FILE -HISTORICAL
DATE OF
RESCISSION
❑ Oc2�
YYYYMMDD
.1� ,may '� •� . i.
Energy, Mineral
and Land Resources
ENVIRONMENTAL OUALITY
February 26, 2016
Mr. Steven Ashworth
Adams Construction Company — Woodsdale Plant
225 Gypsum Road
Danville, VA 24541
PAT MCCRORY
Co vernoi-
DONALD R- VAN DER VAART
Subject: Requested rescission of stormwater permit coverage under I C6 1�D18�
❑ Rescission request denied. Reason:
TRACY DAVIS
G escission request approved, effective immediately. Permit coverage rescinded on the following basis:
❑
You reported that you have ceased all regulated activity and sold the facility.
C]
You reported that although you retain ownership or control of the facility, you have ceased all regulated
activity, and there are no materials remaining on site that ma resent a risk of stormwater pollution,
You reported that continued permit coverage is not required because the site activities are not regulated
by the NPDES stormwater permitting program.
G
Note other basis: A.PhAn o of
0DEMLR Regional Office (RO) inspection and concurrence
RNo RO inspection. We are relying on your representation that a permit is no longer regpired-
Discharging regulated industrial stormwater, discharging wastewater, or operating a treatment facility
without a valid NPDES permit will subject the responsible party to a civil penalty of up to $25,000 per
day. 'rhe Division may pursue enforcement action on persons that have voluntarily relinquished permit
coverage when continuing, permit coverage was necessary. If in the future you wish to again discharge to
the State's surface waters, you must first apply for and receive new coverage under an NPDES permit.
If you have questions about our determinations above, please contact the DEMLR Regional Office
(copied below), or _ Laura in the Raleigh Central Office at (919) 807-6,68.
Sincerely,
for Tracy E. Davis, P.E., CPM, Director
Division of Energy, Mineral; and Land Resources
Stormwater Permitting Program files —with attachments
DWR Central files
DEMLR Budget Office; Deborah Reese (rescissions only)
DEMt.R^ &ale 4._Kegi0na10rfICC, v
State or Nosh Carolina I Environmental Quality I Energy, Mineral and Land Resources
1612 Mail St -mice Cenmcr 1 512 Nortlt Salisbury Street I Raleigh, North Carolina 27699.1612
919 707 9226 T
A
FOR AGENCY VSE ONLY
• Division of Energy, Mineral & Land Resources Date Received
Land Quality Year Month Da
Q ty Section/Stormwater Permuting Program
art �
NCDENRNational pollutant Discharge Elimination System Alle q� o /i7sy�-y / /� zf,
Ncanr GADlrwl'MCr+>' or V !� j� ^ T /
[HvinONNCrfr �w0 riinfn!L f(.5CYJ4�'(.} � J I
RESCISSION REQUEST FORM Re�rz�
_ uT Cas�%Ck_ Cass G'
Please fill out and return this form if you no longer need to maintain your NPDES stormwater permit.
11 Enter the permit number to which this request applies:
Individual Permit (or) Certificate of Coverage
N I C I 5 I I I I I I I N I C I G 1 6 0 1 8 6
2) Owner/Facility Information: ' Final correspondence will be mailed to the address noted below
Owner/Facility Name Adams Construction Company I Woodsdale Plant
Facility Contact Steven Ashworth
Street Address Facility: 5280 Woodsdale Rd. Mailing: 225 Gypsum Road, Danville, VA 24541
City Roxboro State NC ZIP Code
County Person E-mail Address sas_hworth@adarnspaving.com
Telephone No. 434 791-4480 Fax: 434 799-5851
31 Reason for rescission request (This is rgauirqd information. Attach separate sheet if necessary):
0 Facility closed or is closing on 1'1130115 . All industrial activities have ceased such that no discharges of
stormwater are contaminated by exposure to industrial activities or materials.
❑ Facility sold to 11 on F . If the facility will continue operations under the new owner it
may be more appropriate to request an ownership change to reissue to permit to the new owner.
0 Other: Facility will be relocated to Farmville, VA.
4) Certification:
I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the
subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief
such information is true, complete and accurate.
Signature
Steven Ashworth
Print or type name of person signing above
Date 12/2/15
ENS Manager
Title
Please return this completed rescission request form to: NPDES Permit Coverage Rescission
Stormwater Permitting Program
1612 Mail Service Center
Raleigh, North Carolina 27699-1612
16i2. Mail Servica Censer, Raleigh. North Carolina 27699-1612��
Phone: 9IM07-6300 � FAX:9IM07-6492 8 2015
An Equal Opportunity 1 Affumafive Action EmDloyer
NCDEN R
North Carolina Department of Environment and
Division of Water Quality
Beverly Eaves Perdue Charles Wakild, P. E.
Govemor Director
December 5, 2012
Douglas M. Dawson
Piedmnt Asphalt, LLC
PO Box 1 1328
Danville, VA 24543
Natural Resources
Dee Freeman
Secretary
Subject: NPDES General Permit NCG 160000
Certificate of Coverage NCG 160186
Piedmont Asphalt, LLC — Woodsdale
Plant
Formerly W-L Construction cat Paving,
Inc — Woodsdale Plant 44318
Person County
Dear Mr. Dawson:
Division personnel received your request to revise your stormwater permit Ccl-tlflcate ol`Covcrage to
accurately reflect your new company and facility name.
Please find enclosed the revised Certificate of Coverage. The terms and conditions contained in the
General Permit remain unchanged and in full effect. This revised Certificate of Coverage is issued under
the requirements of North Carolina General Statutes 143-215.1 and the Memorandum of Agreement
between North Carolina and the U.S. Environmental Protection Agency.
If you have any questions, please contact the Stormwater Permitting Unit at 919-807-6300.
Sincerefv,
ORIGINAL SIGNED k31
KEN PICKLE
for Charles Wakild, P.E.
cc. Raleigh Regional Office
Central Files
Stormwater Permitting Unit
Wetlands and Stormwaler Branch
1617 Mail Service Center, ttalegh, North Carolina 27699.1617
Location: 512 N. Salisbury St. Ra"h, No& Carolina 27604
Phone: 919-807-63001 FAX: 919-807-64N4 Customer Service: 1-877-623-6748
Internet www.ncwaterqualit ,org
One
NorthCawlilla
Naturally
An Equal Opportunity 1 A@irmalive Acton Employer
STATE OF NORTH CAROLINA
DEPARTME-N'r OF ENVIRONMrNT AND NATURAL RI.SOURCE-S
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG160000
CERTIFICATE OF COVERAGE No. NCG160186
STORMWATLR DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the Provision of North Carolina General Statute 143-215.1, other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission,
and the Federal Water Pollution Control Act, as amended,
Piedmont Asphalt, LLC
is hereby authorized to discharge stormwater from a facility located at
1"Odmont Asphalt, LLC — Woodsdale Plant
5280 Woodsdale Rd
Roxboro
Person County
to receiving waters designated as 1-13,co River, a class C, waters in the Roxboro River Basin in accordance
With the effluent lirnitatiortis, monitoring requirements, and other conditions set forth in Parts 1, 11, III, IV,
V and VI of General Permit No. NCG 160000 as attached.
This certificate of coverage shall become effective December 5. 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this day December 5, 2012.
ORIGINAL SIGNED 83
KEN PICKLE
for Charles Wakild, P.F., Director
Division of Water Quality
By Authority of the Environmental Managemcni Commission
Q of wAr�9pG licverly laves Perdu, Governor
r the Freammi, Secretary
North Carolina Dcparuncnt of Fnvironmcm and Natural Resource`s
O `C
Colcm K Sullins, Direclor
Division at' waicr Quality
SURFACE WATER PROTECTION SECTION
. - `1
PERMIT NAME/OWNERSHIP CHANGE FORM
I. Please enter the permit number for which the change is requested.
NPDES Permit (or) Certificate of Coverage
N ,C I 'S 10 1 1 1 17= 1 N 1 G ,G 1 1 6 1 0 1 R 6
II. Permit status prior to requested change.
a. Permit issued to (company name): Adams Construction Co.
b. Person legally responsible for permit: Edward S 'I'hontpson
First MI Last
� 1 190W9 0
JAN302012
DENR ' WATER QUALITY
VvEa DSANDSI'flWAWATERRBRANCH
c. Facility name (discharge):
d. Facility address:
Vice-President/Area Manat?er
'Fille
225 Gypsum Road _
T Permit Ifolder Mailing Address
Danville VA
City slate Zip
(434) 791-4480 (434) 799-5851
Phone Par
Adams Construction Co, — Woodsdale I'lant
5280 Woodsdale Road
Address
Roxboro NC 27574
City state 4ip
e, Facility contact person: ( )
First / MI / Last Phone
III. Please provide the following for the requested change (revised permit).
a. Request for change is a result of: ® Change in ownership of the facility
❑ Name change of the facility or owner
If offs r pieiase explain:
b. Permit issued to (company name):
c. Person legally responsible for permit
_. Piedmont Asphalt, I. LC
Douglas M Dawson
First MI Last
General Manager
'I'itle
P.O. Box 11328
Permit Holder Mailing Address
Danville VA 24543
Cite state Zip
(434-) 797-1360
Phone t mail Address
d. Facility name (discharge): Piedmont Asphalt, LLC - Woodsdale Plant
e. Facility address: 5280 Woodsdale Road
Adcires,
Roxboro NC 27574
City Stale Zip
f. Facility contact person: Chris M Campbell
First Nil � Last
(336) 599-0165
Phone E-mail Address
Revised 812008
PERMIT NAME/OWNERSHIP CHANGE FORM
Page 2 of 2
IV. Permit contact information (ifdifferent front the person legally responsible for the permit)
Permit contact: Donald R Johnson
First M1 Lu%1
Safety Manager
Title
P.O. Box 11328
N•tailing Address
Danville VA 24543
City SIMC Zip
(434) 791-4480 djohnson a adamseaving.com
Phone E;-nwil Address
V Will the permitted facility continue to conduct the same industrial activities Conducted prior
to this ownership or name change?
® Yes
❑ No (please explain)
VI Required Items: THIS APPLICATION WILL BE RETURNED UNPROCESSED IF ITE.NIS
ARE INCOMPLETE OR MISSING:
❑ This completed application is required for both name change and/or ownership change
requests.
❑ Legal documentation of'the transfer of ownership (such as relevant pages of a contract deed,
or a bill of sale) is required for an ownership change request. Articles of incorporation are
not sufficient for an ownership change.
The certifications below must be completed and signed by both the permit holder prior tothe change, and
the new applicant in the case of an ownership change request. For a name change request, the signed
Applicant's Certilication is sufficient.
PERMITTEE CERTIFICATION (Permit holder prior to ownership change):
I, E. Scott Thompson, attest that this application for a name/ownership change has been reviewed and is
accurate and complete to the best of my knowledge. I understand that ifall required parts ofthis
application are not completed and that if all required supporting information is not included, this application
package will be returned as incomplete.
C.
Signature
APPLICANT CERTIFICATION
Date
1, Douglas M. Dawson, attest that this application for a name/ownership change has been reviewed and is
accurate and complete to the best of my knowledge. 1 understand that ifall required parts of this
application are not completed and that il'all required supporting information is nol included, this application
package will be returned as incomplete.
Signature Dale
PLEASE. SEND THE COMPLETE APPLICATION PACKAGE TO:
Division of Water Quality
Surface Water Protection Section
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
Revised 7/2008
C241110270014G
State of North Carolina
Department of the Secretary of State
SOSID: 1180767
Date Filed: 1/31/7011 2:02:111) PM
Elaine F. Marshall
North Carolina Secretary of State
C201102700146
APPLICATION FOR CERTIFICATE OF AUTHORITY
FOR LIMITED LIABILITY COMPANY
Pursuant to §57C-7-04 of the General Statutes of North Carolina, the undersigned limited liability company hereby applies for a
Certificate of Authority to transact business in the State of North Carolina, and for that purpose submits the following:
1. The name of the limited liability company is PIEDMONT ASPHALT, LLC
and if the limited liability company name is unavailable for use in the State of North Carolina, the name the limited
liability company wishes to use is
2. The state or country under whose laws the limited liability company was formed is: VIRGINIA
3. The date of fon-nalionwas 01112/2011 ; its period of duration is: INDEFINITE
4. Principal office information: (Select either a or b)
a. ® The limited liability company has a principal office.
The street address and county of the principal office of the limited liability company is:
Number and Street 225 GYPSUM ROAD
City, State, Zip Code DANVILLE, VA 24541 _ _ County DANVILLE CITY
The mailing address, if different from the street address, of the principal office of the corporation is:
b. ❑ The limited liability company does not have a principal office.
5. The street address and county of the registered office in the State of North Carolina is:
Number and Street 150 Fayetteville Street, Box 1011
City, State, Zip Code Raleigh, North Carolina 27601
County Wake
6. The mailing address, if different from the street address, of the registered office in the State of North Carolina is:
7. The name of the registered agent in the State of North Carolina is:
CORPORATIONS DIVISION
P. O. BOX 29622
C T Corporation System
RALEIGH, NC 27626-0622
(Revised January 2002)
NCO57 • 10/17nM C TSytl m Win
(Form L-09)
C201102700146
APPLICATION FOR CERTIFICATE OF AUTHORITY
Page 2
8. The names, titles, and usual business addresses of the current managers of the limited liability company are:
(use attachment if necessary)
Name
Gary W. Wright
Business Address
PO Box 12627 523 Rutherford Avenue, N.E. Roanoke, VA 24027
9. Attached is a certificate of existence (or document of similar import), duly authenticated by the secretary of state or other official
having custody of limited liability company records in the state or country of formation. The Certificate of Existence must he
less than six months old. A photocopy of the certification cannot he accepted.
10. If the limited liability company is required to use a fictitious name in order to transact business in this State, a copy of the
resolution of its managers adopting the fictitious name is attached.
11. This application will be effective upon filing, unless a delayed date and/or time is specified:
This the 26th day of January a 201 i
PIEDMONT ASPHALT, LLC
Name ofGimited Liability Company
2&� M �&—�
Signature of Manager
Gary W. Wright
Type or Print Name
Notes:
1. Filing fee is S250. This document must be filed with the Secretary of State.
CORPORATIONS DIVISION P, 0. BOX 29622
(Devised January 2002)
N0O57 - I OJ17R008 C T Sydem Online
RALEIGH, NC 27626-0622
(Form L-09)
C201102700146
0
A-T; IF,
J
4
IT U'Wi J -
j.
I Certify the T offawing from the records of the Commission:
A certificate of organization was issued by the Commission to Piedmont Asphalt, LLC, a limited
liability company formed under the laws of VIRGINIA, effective as of January 12, 2011.
As of the date below, articles of cancellation have not been filed in this office by Piedmont
Asphalt, LLC, a Virginia limited liability company,
Nothing more is hereby certified.
pkarloN c
F �pQ•a�{I�G ltydy;
U7 _
rao3
xgned andSeared at Richmond on this (Date:
January 21, 2011
yoef-?f ttc�, Cferkof tfw Commission
CISCDB
Allrt IQ &ii 4- 1 1
.O� ► c'11lFi U
April 11, 2011
We are pleased to announce the limited joint venture of Adams Construction
Company and W-L Construction. with regard to the asphalt plant and quality
control operations. The newly formed joint venture, called Piedmont Asphalt, will
own and operate six asphalt plants in the piedmont region of Virginia and North
Carolina. The plants include Martinsville, Shelton, Reidsville, South Boston,
Charlotte Courthouse and Woodsdale. Piedmont Asphalt will only manufacture
hot mixed asphalt and the placement of our product will .be performed by others
in the region we service.
We believe that you will be better served by the efficiencies of our collective use
of resources and benefit from.tne pooled buying power of the enlarged group will
be able to provide. Quality control*staff will be enhanced and. you can expect the
quality of the asphalt to be as good as or better than what you have received
previously.
Piedmont Asphalt will be locally managed by Mr. Doug'Dawson. Doug has served
this region for many years and has gained the.respect of his colleagues around the
state. We are working swiftly to assemble the necessary office and support staff
and expect this effort will go unnoticed by you and your employees.
Piedmont Asphalt; LLC • P.O.-Bax 11328 • Danville:•VA 24543
Telephone (434) 797-1360 • Fax (434) 797-1361
O�O� WA rFq pG Michael r•. Easley, Governor
� William G, Boss Jr., Secretary
rNorth Carolina Department of Environment and Natural Resources
p Y Coleen li. Sullins, Director
Division of Water Quality
July 25, 2008
Adams Construction Co.
225 Gypsum Road
Danville, NC 24541
Subject: General Permit No. NCG 160000
Adams Construction, Co.
Woodsdale Asphalt Plant — 5280 Woodsdale Rd.
COC NCG160186
Person County
Dear Mr. Johnson:
In accordance with your application for a discharge permit received on March 20`11, 2008, we are
forwarding herewith the subject certificate of coverage to discharge under the subject state -- NPDES
general permit. This permit is issued pursuant to the requirements of North Carolina General Statute
143-215.1 and the Memorandum of Agreement between North Carolina and the US Environmental
Protection Agency dated October 15, 2007 (or as subsequently amended).
Please take notice that this certificate of coverage is not transferable except after notice to the
Division of Water Quality. The Division of Water Quality may require modification or revocation and
reissuance of the certificate of coverage.
This permit does not affect the legal requirements to obtain other permits which may be required
by the Division of Water Quality or permits required by the Division of Land Resources, Coastal Area
Management Act or any other federal or local governmental permit that may be required.
If you have any questions concerning this permit, please contact Jennifer Jones at telephone
number (919) 807-6379.
Sincerely,
for Coleen H. Sullins
cc: Raleigh Regional Office, Myrl Nisley, Vicki Webb, Danny Smith
Central Files
Stormwater Permitting Unit Files
eml Cam in
Nlmhally
North Carolina Division of Water Quality 1617 Mail Scrviao Cenlcr Raleigh, NC 27699-1617 Phone (919) 733-5083 Customer Service
Internet: www.ncwaterguality.orrg Location: 512 N, Salisbury St. Raleigh, NC 27604 Fax (919) 733-9612 1-877.623-674H
An Equal Opporttn4tAflirmative Action Employer — W% Recycled/10% Post Consurwr Paper
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG160000
CERTIFICATE OF COVERAGE No. NCG160186
STORMWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Adams Construction Company
is hereby authorized to discharge stormwater from a facility located at
Adams Construction Co., Woodsdale Asphalt Plant
5280 Woodsdale Road
Roxboro
Person County
to receiving waters designated as Hyco River, a class C water in the Roxboro River Basin, in
accordance with the effluent limitations, monitoring requirements, and other conditions set forth
in Parts I, I1, II1, IV, V, and VI of General Permit No. NCG16000 as attached.
This certificate of coverage shall become effective July 25, 2008.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this day July 25, 2008.
for Coleen H. Sullins., Director
Division of Water Quality
By the Authority of the Environmental Management Commission
4 1
LOCATION MAP:
IRS
op 0,
Vill
Pam. � ����.�
Woodsdale Asphalt Plant ti
-0, Adams Construction Co.
Pt
p I
R
f
b
Q17 b
-.4
0.
IF I
NCG160186 Woodsdale Asphalt Plant
Adams Construction Company
N
Latitude: 360 31' 18.69" N
w_* J." Longitude., 780 58' 11 .232" W
-Receiving Stream. UT to Hyco River
Stream Class: C
Map Scale 1:15,628 Sub -basin: 03-02-05 (Roanoke River Bash)
Facility Location
Stormwater Permit - W000dsdale, NC Asphalt Plant
Subject: Storinwater Permit - W000dsdale, NC Asphalt Plant
From: "Don Johnson" <djohnson@adamspaving.com>
Date: Fri, 18 Jul 2008 15:37:12 -0400
To: <Jennifer.Joneg@ncmail.net>
CC: <sthompson a adamspaving.com>, <rjames@adamspaving.com>, "'Tony Sample"'
<I'Sample@thesunrockgroup.cotzi>
Jennifer,
Confirming our telephone conversation this afternoon, please issue a stormwater permit to
Adams Construction Co. as requested in our Notice of Intent dated 3/13/08. Thanks for your
help in this matter.
Von Johnson
Adams Construction Co.
Southside Division
Danville, Va
I of 1 7/18/2008 3 A 2 PM
RE: 51�iwut�3 pAui liar WOOLlscl,lle Asphalt Plaid
Subject: RE: Stornlwater plan for Woodsdale Asphalt Plant � �2.!�2 q o-cl
From: "Don Johnson" <djohnson a adalllspavirlL,.conl>
Date: Thu, 17 Jul 2008 07:36: 33 -0400
To: <Jcnnifer..lones@11CIna i1.net>
CC: "'Tony Sample"' <'I'Sanlplc ClitliesLlrirockgl-ollP.L:011l>, <stl1ot11p5ot1 adanlsl)avitj�,.cottl>.
<rjame;s@adamspaving.corn>
Good Morning Jennifer,
The plans and calculations i submitted to your department were supplied by Tony a) Sll]lrOck IS they
Will be constructine the basin and levels reader. Adams asphalt plant site is located inside the uarry
pro ty. Any stormwater-runoff from o tr-leased site flo�%,s unto t lc.ir property and into their
stQrmwater basin. It is Adams position that the issue of Sunrock's proposal to utilize the Ievel spreader
needs to be resolved before -we apply for a permit for our site. If the level spreader is approved, Ihen
there is no need for LIS tO obtain a pernlit. I f the level spreader is denied, then we would request your
Office issue us a pernlil.
I will be out of the office today. Any of the additional information you are requesting would have: to be
supplied by Sunrock belore I could send it to you. In light ol'that, I would request you eXiend to
deadline for providing this data until such time that I can talk with -bony.
Thank,
Ikon
From: Jennifer Jones[mailto:lennifer.Jones@ncmail.net]
Sent: Wednesday, July 16, 2008 3:35 PM
To: Don Johnson; Tony Sample
Cc: Ken Pickle; Bradley Bennett; Bethany Georgoulias; Jennifer.Jones@ncmail.net
Subject: Re: Stormwater plan for Woodsdale Asphalt Plant
Hi Don and Tony,
Thanks for your email. First - in reading my July 3rd email to you I realized I had a typo in the first sentence - t
meant to say you do not need to send "stamped plans" - not just "plans". I contradicted this statement later so I
apologize if you did not understand what I meant.
I have the calculations and site plans you had sent to Robert but they are not sufficient to review your rile design.
I will need additional information in order to evaluate your level -spreader design. I will also need to see a more
detailed set of plans.
In your calculations you must clearly provide your rationale and supporting evidence for your design. We also
must be able to easily understand it and review it. Among other review points that need further attention I saw
that: you chose 5 acres as your drainage area but did not provide an exact square footage and site plans where
we could verify this: you chose 1" as a design depth, but then used it as an intensity; you did not provide any
supporting evidence for your calculation of G; I don't see any reference in your plans or calculations to a fitter strip
including its vegetation, length, width or slope. We will review these points, among others, when evaluating your
design.
We require construction details of the proposed features as well as a site plant at a large enough scale (11"x17"
plans are not sufficient for our review) to be able to evaluate calculations and site conditions, site areas and
I of 7 7/18/21110$ 3:07 I'M
RE: Stork water plan for Woodsciale Asphalt Plant
JIM
slopes, and all appropriate BMPs with details. Please provide a scale on all plans submitted
As I noted below you must submit complete supporting plans and calculations by Friday, July 18, 2008. As it
stands now, the plans and calculations you have provided are insufficient. If you do not submit additional plans
and calculations by that date we will proceed in issuing your permit coverage effective immediately.
Please let me know if you have any questions or concerns.
Thank you,
Jennifer Jones
Don Johnson .wrote:
Hi Jennifer. -
was looking through my bile and found a copy of a memo elated February 28, 2008 to Robert Patterson
of NICDENR. Attached to the memo were the drawings and calculations you are requesting. Would you
like for nee to mail that iizformalion to you or has Robert provided it?
I'hanks,
Don
From: Jennifer Jones [mailto:Jennifer.Jones ct ncmail.net]
Sent: Thursday, July 03, 2008 10:15 AM
To: Jennifer.Jones@ncmail.net
Cc: Tony Sample; Don Johnson; Bradley Bennett; Bethany Georgoulias
Subject: Re: Level Spreader Meeting - June 2nd or 5th
Hi Tony and Don,
I understand that Bradley spoke .with Tony yesterday and resolved that you did need to send plans. I had
originally asked for your plans and calculations to be submitted to us by May 30th. I then pushed it out
to .lone 30th, however you have not submitted plans and calculations.
I have attached the original letter with the requirements I sent on April 14, 2008. 1 understand from
Bradley that VOU do not ileed to Send in PE stamped plans however everything else ShOLIld remain the
sil me.
Please submit plans and calculations, or a statement stating you would like to obtain an NCG 160000 by
July 18th, 2008 or the will return your application as incomplCe and you will be Without a permit. If
YOU cannot meet this date please let me know. in .writing and propose an alternate: date - an email will
SLIP#ire.
Please let nee know it you have any other further questions or concerns.
Thank you,
,Jennifer .lanes
2 of 7 7/18/2008 3:07 PM
RE: S�mwaier plan liar Wo olsdalr Asphalt Plant
Jennifer Jones wrote:
1-1 i Tony,
I alt] sorry for the late not ice but I am going t0 have to L'iil]Cel our meeting again. Unfortumitely we don't
have anything new to report to ,you on this issue. We will continue to review such requests only on a
case -by -case basis until liirther notice and will otherwise assume all sul jest industrial activities require
an NPDFS permit
am CCing Don Johnson of Adams COnStru(:tion and Would like then] to send in the reyriestc;d I]lans as
per my original letter. I had originally risked if YOU could send in these plains by May 30t.11 but We had
pushed the date brick until we met. Please send the required documents by .tune 30th - all other
conditions of my letter will remain the same. Please let me know in writing if you Will need more time
to complete the submission.
Please contact me if you have any questions or concerns at 919-733-5083 x591. 1 will call you to hollow
LIP.
Thank you,
Jennifer Jones
'Pony Sample wrote:
I'll brit it on the calendar!
(hanks
-l-ony
'Pony L. Sample, CH-H.S.C.
Compliance Manager
Cat•olina Srtr]rock Ll_C
O: 919-575-4502
F. 919-575-4510
C: 919-669-61 87
1001 West B Street
Butner, NC 27509
-----Original Message-----
Frcmi: Jennifer .Jones [mmIto:Jennifer.Jones(gi ncmaiImet:j Sent: Wednesday, June 04, 2008 4:22 PM
To: Tony Sample
Subject: Re: Level Spreader Meeting - June 2nd or 5th
3 o1`7 7/18/2008 3:07 I'M
Re: Level Spreader Meeting - June 2nd or 5th
Subject: Re: Level Spreader Meeting - June 2nd or 5th
From: Jennifer Jones <Jennifer.Jones@ncmai1.net>
Date: Tue, 17 Jun 2008 13:25:34 -0400
To: Tony Sample <TSample@thesunrockgroup.com>, Don Johnson <djohnson@adamspaving.com>
CC: Bradley Bennett <Bradley.Bennett@ncmai1.net>, Bethany Georgoulias
<Bethany.Georgoulias@ncmai1.net>, "Jennifer.Jones@ncmail.net" <.lennifer.Jones@ncmai1.net>
Hi Tony,
I am sorry for the late notice but 1 am going to have to cancel our meeting again.
Unfortunately we don't have anything new to report to you on this issue. We will
continue to review such requests only on a case -by -case basis until further notice
and will otherwise assume all subject industrial activities require an NPDES permit
I am CCing Don Johnson of Adams Construction and would like them to send in the
requested plans as per my original letter. I had originally asked if you could send
in these plans by May 30th but we had pushed the date back until we met. Please send
the required documents by June 30th - all other conditions of my letter will remain
the same. Please let me know in writing if you will need more time to complete the
submission.
Please contact me if you have any questions or concerns at 919-733-5083 x591. T will
call you to follow up.
Thank you,
Jennifer Jones
Tony Sample wrote:
I'll but it on the calendar!
Thanks
Tony
Tony L. Sample, C.P.E.S.C.
Compliance Manager
Carolina Sunrock LLC
0: 919-575-4502
E: 919-575-4510
C: 919-669-6187
1001 West B Street
Butner, NC 27509
-----Original Message -----
From: Jennifer Jones[mailto:Jennifer.Jones@ncmail.net] Sent: Wednesday, June 04,
2008 4:22 PM
To: Tony Sample
Subject: Re: Level Spreader Meeting - June 2nd or 5th
Hi Tony,
How does 10-11:30 on June 18th work for you?
Jennifer
Tony Sample wrote:
I of4 6/17/2008 2:32 I'M
Department of Environment
and Natural Resources
Division of Water Quality
Michael F. Easley, Governor
William G. Ross Jr., Secretary
Alan W. Klimek, P.E., Director
June 3, 2003
Mr. Tony Sample
Carolina Sunrock Corporation
1001 West B Street
P.O. Box 25
Butner, NC 27509
� • v
NCDENR
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
Subject: NPDES Permit # NCG160160
Kittrell Asphalt
Application Return #1080
Vance County
Dear Mr. Sample:
On August 9, 2002 the Division of Water Quality received your Notice of Intent (NOI) requesting
coverage under general wastewater permit NCG160000. A review of the application materials shows that the
drainage from the sediment pond will be diffused through a level spreader apparatus. Since this type of
discharge is designed to produce sheet flow rather than a.point source discharge it is not subject to stormwater
permitting at this time.
If after the system is installed the level spreader does not work properly and does indeed produce a
channelized, point source, flow it will become subject to stormwater permitting regulations.
If you have any questions concerning this matter please contact Aisha Lau at
(919) 733-5083, ext. 578.
Sincerely,
v
f` Alan W. Klimek, P.E.
Enclosure
cc: Raleigh Regional Office
1Storrrtwater-and-General .P,em- its ,Unit -a
Central Files
u+r1'1n 4A'(4 kas S W p-t�- wv1
r t
1
1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 FAX 919-733-9919 An Equal
Opportunity Affirmative Action Employer So% recycles!/ 10% post -consumer paper
Stormwater Permit - Woodsdale, NC Location
Subject: Stormwater Permit - Woodsdale, NC Location
From: "Don Johnson" <djohnson a adamspaving.com>
Date: Wed, 28 May 2008 12:50:47 -0400
To: <Jennifer.Jones@ncmail.net>
Jennifer,
Tony Sample has notified me that he is meeting on -site with NCDENR personnel the first
week in June to discuss the proposed level spreader at the Woodsdale quarry. I will wait for
the outcome of that meeting before determining Adams need, if any, for a permit.
Don Johnson
Adams Construction Co.
Southside Division
Danville, Va
1 of 1 6/17/2008 1:22 PM
Etc: NCG160186 Adants Construction,
Subject: Re: NCG160186 Adams Construction
From: Vicki Webb <vicki.webb a ncmail.net>
Date: Wed, 16 Apr 2008 10:45:17 -0400
To: Jennifer.Jones@ncmail.net
Hey Jen,
I wanted to Couch base with you and see if you've heard anything from Robert on the
NCG160166.
I've talked to Mr. Sample who is with the mine (Sun Rock) back when he sent his
paperwork in for his SW permit. I am trying to plan a trip up there just to look
around and wanted to check in with you before hand.
As fax as I know I don't foresee any problems with Adams getting their CCC.
I should have my schedule worked out so I can travel up there within the next two
weeks. So let me know if you would like me to still hold off.
Thanks,
Vick
Vicki Webb <vicki.Webb cgncmail.net>
Environmental Specialist
North Carolina Deptment of Environmental and Natural Resources
Division of Water Quality Surface Water Protection
k,
1 of' 1 7/18/2008 3:59 1'M
O110f 1tV A TF,gpG Michael F. Easley, Governor
William G. Ross Jr., Secretary
rNorth Carolina Department of Environment and Natural Resources
p ^� Colcen It. Sullins, Director
Division of Water Quality
April 14, 2008
Don Johnson
Adams Construction Co.
5280 Woodsdale Road
Roxboro, NC 27574
Subject: Request for Additional Information
Application for General Permit NCG 160186
Adams Construction Company
Woodsdale Asphalt Plant
Person County, North Carolina
Dear Mr. Johnson:
The Division of Water Quality received a Notice of Intent for coverage under a General
Permit for Adams Construction Company's Woodsdale Asphalt Plant on March 2, 2008. You
have since requested that we consider discharge from this Carolina Sun Rock site as a non -paint
discharge because flows will be diffused through a level -spreader apparatus.
In order'for us to determine if no point source discharge will occur, you will need to
submit additional information. For the level -spreader design please include:
• One set of layout & grading site plans for asphalt she area and drainage with appropriate
details.
• One set of signed, scaled & dated level -spreader plan overview and detailed plans
• Sealed, signed & dated calculations for the level spreader (with bypass), and the exiting
flow and supporting calculations for the retention pond. Please include all calculations on
our BMP level -spreader supplement form. If you wish, you may fill out this form and
include it with your submission. You can find this form on our BMP manual website:
http://h2o.enr.state.ne.us/su/bmp_forms.htm.
Please note (per phone conversation with Tony Sample, April 10, 2008) that NCDENR DWQ
internal discussions regarding the non -point source discharge status of flows associated with
industrial activities that are dispersed by a level spreader and related permitting policies are still
ongoing. These decisions may affect Adam's Construction Company's request.
Please also note that the Raleigh Regional Office (RRO) may request a visit to determine if this
facility has a point source discharge, and may also periodically re -visit the site to confirm
continued sheet flow. If the RRO determines that the discharge from your site does not meet the
requirements of sheet flow and is in fact a point source, then you must apply for an industrial
stormwater permit. Point source discharges from this operation without an NPDES stormwater
permit will be subject to enforcement action.
Finally, please include any plans to discharge water from the mine or concrete plant you
also plan to build on site.
The requested information should be received by this Office prior to May 30, 2008, or the
application will be returned as incomplete. The return of a project will necessitate resubmittal of
NZhCaro ina
Nakrally
North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-5083 Customer Service
Internet: Www.nc%,atcrguality.or¢ Location: 512 N. Salisbury St, Raleigh, NC 27604 - Fax (919) 733-9612 1-877-623.6749
An Equal OpportunitylAffirmative Action Employer — 50% Recycled/l0% Post Consumer Paper
all required items, including -the application fee. If you need additional time to submit the
information, please mail or fax your request for a time extension to the Division at the address
and fax number at the bottom of this letter. The request must indicate the date by which you
expect to submit the required information. Please note, the Division is allowed 90 days from
the receipt of a completed State Siormwater application to review plans and will likely
require a similar timeframe to review the design information submitted for this request.
Please reference the State assigned project number, NCG160196, on all correspondence.
If you have any questions concerning this matter please feel free to call me at (919) 733-5083 x
591.
Sincerely,
C
Jennifer Jones
Engineer, Stormwater Permitting Unit
cc: Raleigh Regional Office
Sun Rock Corporation, Tony Sample
Stormwater Permitting Unit file
2mi4
cl�&G —
�CF WA,4p
.d G North Carolina Department of
ry Environment and Natural Resources
VW�J4 �
Division of Water quality
(919) 733-5083
Storm water Design Calculations:
Proposed Asphalt Plant
Woodsdale Quarry Site
Carolina Sunrock LLC
5280 Woodsdale Road
Roxboro, NC 27574
5 Acre Site n
First Flush Capacity — 1"= i
C_0.80 DrivewaylWalks -- Heavy Industry
Q=CiA 'd J
Q= (0.80) (1) (5) �J
Q= 4 cfs Design Weir for 4 cfs
4 cfs x 13'/cfs = 52' (required) use 60' weir
l 8"cmp @ 0.5% slope = 4 cfs discharge -- use 18" barrel
Use 24" riser wl trash rack
25 year-24 hours design storm — 6.0 inches
6" Rainfal I event @ 0.80 CN = 3.78" run off
3.78"1 12 "Ift x 5 acres = 1.6 acrelft (required)
Storage available at Secondary Spillway elevation of 8.0' is 1.7 acre feet.
Top of Dam 10.5 feet.
Outlet to Weir — 24" riser elevation set at 7 feet above pond bottom.
Bottom of Pond 65'x 125' (minimum)
Side slopes 2:1 or flatter
Dam height 10.5 feet above pond bottom
Minimum 8 foot dam width
Secondary spillway — 10 feet wide w/2A side slopes, 2.5 foot deep (8' above pond bottom).
Collector ditch — 5' wide top width, piped under fill to pond, isolated to additional run-off.
Weir charging ditch — 3' wide top width, isolated to additional run-off.
1.5' x 60 feet washed stone pad below weir to prevent erosion.
DAVKS
S► CONSTRUMON CO.
DANWLL@, VIRGINIA
Memo
TO: Robert Patterson - NCDENR
From. Don Johnson
CA
Datec February 28, 2008
Re: Storm Water Plan — Woodsdale Asphalt Plant
MAR � D
3 100661
Per our telephone conversation today, we are trying to determine if a Storm Water permit is needed at
our asphalt plant in Person County. I have attached drawings and calculations for the above -
referenced site. Please note_ we are utilizing a level spreader to achieve diffuse flow of water from the
collector pond.
If you would like to arrange a site visit or have any questions, do not hesitate to contact me at
(434)251-9009.
64,
s.
1
,1 joseph & Fupmo&i C
ZF x! g y 7�35 w-
t` p1/3-%Ik
9 RQeoni # t501
d;P
TnIPF
� � �_,� los��T u:l..tu:l•c�l llr+' is,(irrr
i..0 sa>rrou^atcr tu:wuff drains m the east
throWb pipes into the ao&cmx
1�
�I o
Cc m=w Pksnt atxl Asphah
A Plant will occupy appruxiroalch.--
. 15 acres `
A
a
r�
` lnitiA Pit (wing
+u3i+i�rtxt! I�M�' Ei_f���r
Tear D
N.N
rA
OW YV.►
ram.-�Zc7�—�.�
Wr
IZ'iY CYi ri�+idnr ,4�•.au u,tiir..o-.ru,..,
aearn••arnam
IYM Nal.
- � V
♦
`�� "+:
aw.}n�ria� aari Fiw. irna�c
m•,�.r,.•x�.r_,r
��r• Z a ��
., rwaaa�s asfv,vxl�tYa� t®
o
r.+
I
L@I.7GfNU
- � ♦wWr R•a.e