HomeMy WebLinkAboutNC0021857_authorization to construct_19930903State of North Carolina
Department of Environment,
Health and Natural Resources
Division of Environmental Management
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
A. Preston Howard, Jr., P.E., Director
The Honorable Mike Aldridge, Mayor
Town of Nweland
Post Office Box 349
Boone, North Carolina 28607
September 3, 1993
AI"74rA
41F
�EHNF�
Subject: Permit No. NC0021857
Authorization to Construct
Town of Newland
Wastewater Treatment Facility
Avery County
Dear Mayor Aldridge:
A letter of request for an Authorization to Construct was received December 29, 1992 by the
Division and final plans and specifications for the subject project have been reviewed and found to be
satisfactory. Authorization is hereby granted for modification to the existing facilities and the construction
of an additional treatment train consisting of a 140,000 gallon aeration basin, a 355 ft2 clarifier, an 80,000
gallon aerated sludge digester, a new chlorine contact basin with dual chlorinators and dual de -
chlorinators, new influent pumps, standby generators for the influent pump station and treatment plant,
five additional sludge drying beds (1,500 ft2 combined area), and a new flow meter with discharge of
treated wastewater into the North Toe River.
This Authorization to Construct is issued in accordance with Part III, Paragraph B of NPDES
Permit No. NC0021857 issued January 13, 1993, and shall be subject to revocation unless the wastewater
treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No.
NC0021857.
The sludge generated from these treatment facilities must be disposed of in accordance with G.S.
143-215.1 and in a manner approved by the North Carolina Division of Environmental Management.
In the event that the facilities fail to perform satisfactorily, including the creation of nuisance
conditions, the Permittee shall take immediate corrective action, including those as may be required by this
Division, such as the construction of additional or replacement wastewater treatment or disposal facilities.
The Asheville Regional Office, telephone number (704)251-6208, shall be notified at least forty-
eight (48) hours in advance of operation of the installed facilities so that an in -place inspection can be
made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00
a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays.
P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-9919
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper
' Permit No. NC0021857
Authorization to Construct
Town of Newland
September 3, 1993
Page 2
Upon completion of construction and prior to operation of this permitted facility, a certification
must be received from a professional engineer certifying that the permitted facility has been installed in
accordance with the NPDES Permit, this Authorization to Construct and the approved plans and
specifications. Mail the Certification to the Permits and Engineering Unit, P.O. Box 29535, Raleigh, NC
27626-0535.
Upon classification of the facility by the Certification Commission, the Permittee shall employ a
certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment
facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the
classification assigned to the wastewater treatment facilities by the Certification Commission. The
Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with
the conditions of Title 15A, Chapter 8A, .0202. The ORC of the facility must visit each Class I facility at
least weekly and each Class II, III, and IV facility at least daily, excluding weekends and holidays, and
must properly manage and document daily operation and maintenance of the facility and must comply with
all other conditions of Title 15A, Chapter 8A, .0202. Once the facility is classified, the Permittee must
submit a letter to the Certification Commission which designates the operator in responsible charge within
thirty days after the wastewater treatment facilities are 50% complete.
A copy of the approved plans and specifications shall be maintained on file by the Permittee for the
Iife of the facility.
Failure to abide by the requirements contained in this Authorization to Construct may subject the
Permittee to an enforcement action by the Division of Environmental Management in accordance with
North Carolina General Statute 143-215.6A to 143-215.6C.
The issuance of this Authorization to Construct does not preclude the Permittee from complying
with any and all statutes, rules, regulations, or ordinances which may be imposed by other government
agencies (local, state, and federal) which have jurisdiction.
One (1) set of approved plans and specifications is being forwarded to you. If you have any
questions or need additional information, please contact Mr. Dana J. Bolden, telephone number 919/733-
5083.
Sinc
. Preston oward, Jr., P.E.
cc: Avery County Health Department
Asheville Regional Office, Water Quality
Training and Certification Unit
Facilities Assessment Unit