Loading...
HomeMy WebLinkAboutNC0021857_authorization to construct_19930903State of North Carolina Department of Environment, Health and Natural Resources Division of Environmental Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director The Honorable Mike Aldridge, Mayor Town of Nweland Post Office Box 349 Boone, North Carolina 28607 September 3, 1993 AI"74rA 41F �EHNF� Subject: Permit No. NC0021857 Authorization to Construct Town of Newland Wastewater Treatment Facility Avery County Dear Mayor Aldridge: A letter of request for an Authorization to Construct was received December 29, 1992 by the Division and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for modification to the existing facilities and the construction of an additional treatment train consisting of a 140,000 gallon aeration basin, a 355 ft2 clarifier, an 80,000 gallon aerated sludge digester, a new chlorine contact basin with dual chlorinators and dual de - chlorinators, new influent pumps, standby generators for the influent pump station and treatment plant, five additional sludge drying beds (1,500 ft2 combined area), and a new flow meter with discharge of treated wastewater into the North Toe River. This Authorization to Construct is issued in accordance with Part III, Paragraph B of NPDES Permit No. NC0021857 issued January 13, 1993, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0021857. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the North Carolina Division of Environmental Management. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Asheville Regional Office, telephone number (704)251-6208, shall be notified at least forty- eight (48) hours in advance of operation of the installed facilities so that an in -place inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-9919 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper ' Permit No. NC0021857 Authorization to Construct Town of Newland September 3, 1993 Page 2 Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to the Permits and Engineering Unit, P.O. Box 29535, Raleigh, NC 27626-0535. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of Title 15A, Chapter 8A, .0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III, and IV facility at least daily, excluding weekends and holidays, and must properly manage and document daily operation and maintenance of the facility and must comply with all other conditions of Title 15A, Chapter 8A, .0202. Once the facility is classified, the Permittee must submit a letter to the Certification Commission which designates the operator in responsible charge within thirty days after the wastewater treatment facilities are 50% complete. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the Iife of the facility. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Environmental Management in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. One (1) set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Mr. Dana J. Bolden, telephone number 919/733- 5083. Sinc . Preston oward, Jr., P.E. cc: Avery County Health Department Asheville Regional Office, Water Quality Training and Certification Unit Facilities Assessment Unit