HomeMy WebLinkAboutSW8981129_Compliance Evaluation Inspection_20070108Y
JAN 09,2007 11:07A Tripp Engineering 9107635631 page 2
TE 98121
State Stormwater Management Systems
Permit No. SW8 981129
Flow Serve
Stormwater Project No. SW8 981129
Brunswick County
Engineer's Certification
I, Phillip G. Tripp , as a duly registered Professional Engineer in the State
of North Carolina, having been authorized to observe (periodically) the construction of
the project,
Flow Serve
(Project)
for Nowak & Warwick. LLC (Project Owner) hereby state that, to the best of my
abilities, due care and diligence was used in the observation of the project construction
such that the construction was observed to be built within substantial compliance and
intent of the approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Signature
Registration Number 17374
Date I - W - 0-7-
SEAL
44► 'y 7
=EAL
AW 17374
V 4
EGOR
State Stormwater Management Systems
JMN 09,2007 11:07A Tripp Engineering 9107635631
page 3
Permit No. SW8 981129
Certification Requirements: Page 2 of 2
1. The drainage area to the system contains approximately the permitted
acreage.
2. The drainage area to the system contains no more than the permitted
amount of built -upon area.
3. All the built -upon area associated with the project is graded such that the
runoff drains to the system.
4. All roof drains are located such that the runoff is directed into the system.
5. The outlet/bypass structure elevations are per the approved plan.
6. The outlet structure is located per the approved plans.
7. Trash rack is provided on the outlet/bypass structure.
8. all slopes are grassed with permanent vegetation.
9. Vegetated slopes are no steeper than 3:1.
10. The inlets are located per the approved plans and do not cause short-
circuiting of the system.
11. The permitted amounts of surface area and/or volume have been
provided.
12. Required drawdown devices are correctly sized per the approved plans.
13, All required design depths are provided.
14. Ail required parts of the system are provided, such as a vegetated shelf, a
forebay, and the vegetated filter.
15. The required dimensions of the system are provided, per the approved
plan.