Loading...
HomeMy WebLinkAboutSW8981129_Compliance Evaluation Inspection_20070108Y JAN 09,2007 11:07A Tripp Engineering 9107635631 page 2 TE 98121 State Stormwater Management Systems Permit No. SW8 981129 Flow Serve Stormwater Project No. SW8 981129 Brunswick County Engineer's Certification I, Phillip G. Tripp , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically) the construction of the project, Flow Serve (Project) for Nowak & Warwick. LLC (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Signature Registration Number 17374 Date I - W - 0-7- SEAL 44► 'y 7 =EAL AW 17374 V 4 EGOR State Stormwater Management Systems JMN 09,2007 11:07A Tripp Engineering 9107635631 page 3 Permit No. SW8 981129 Certification Requirements: Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. all slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13, All required design depths are provided. 14. Ail required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 15. The required dimensions of the system are provided, per the approved plan.