LETTER OF APPROVAL WITH MODIFICATIONS
Outlaw Mobile Homes, Inc.
Attn: Mr. William Haywood Outlaw, President
P.O. Box 772 Business North 117
Mt. Olive, NC 2836S
RE: Project Name: Bonnie Farms - Phase 2
Project ID: Wayne-2021-029
County: Wayne
City: Brogden
Address: NCSR 1918 (Pecan Road)
River Basin: Neuse
Date Received by LQS: June 16, 2021
Submitted By: Cox -Edwards Company, Inc.
Plan Type: New
Dear Sir,
Acres Approved: 16.0
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must
be posted at the job site. This plan approval shall expire three (3) years following the date of
approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC
413 .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCG010000 Construction General Permit. After the form is reviewed and found to be complete,
you will receive a link with payment instructions for the $100 annual permit fee. After the fee is
received, you will receive the COC via email. You MUST obtain the COC prior to commencement
of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please
direct questions about the eNOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark
at Paul. clark e,ncdenr.gov. If the owner/operator of this project changes in the future, the new
responsible party is required to apply for his/her own COC.
Title 15A NCAC 413 .0118(a) and the NCGO1 permit require that the following documentation
be kept on file at the job site:
North Carolina Department of Environmental Quality # Division of Energy, Mineral and Land Resources l� Washington Regional Office 1 943 Washington Square Mall I Washington, North Carolina 27889
noArr4cwauw "^
Dep. d oru.Yt—w D� my 252.946.6481
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. I I3A-61.1(a) of our right of periodic inspection
to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the commencement
of this project, the erosion and sedimentation control plan is inadequate to meet the requirements
of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51
through 66), this office may require revisions to the plan and implementation of the revisions to
insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may
also apply to this land -disturbing activity. This approval does not supersede any other permit or
approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form
if there is any change in the information included on the form. In addition, it would be helpful if
you notify this office of the proposed starting date for this project.
Please be advised that a rule to protect and maintain existing buffers along watercourses in the
Neuse River Basin became effective on July 22, 1997. The Neuse River Riparian Area Protection
and Maintenance Rule (15A NCAC 2B.0233) applies to the 50-foot wide zone directly adjacent to
surface waters (intermittent streams, perennial streams, Iakes, ponds, and estuaries) in the Neuse
River Basin. For more information about this riparian area rule, please contact the Division of
Water Resources Wetland/401 Unit at 919-807-6300, or DWR in our regional office at 252-946-
6481.
Sincerely,
Samir Dumpor, PE
Regional Engineer
cc w/o enc: William Haywood Outlaw, Outlaw Mobile Homes, Inc. (email)
Scott Edwards, PE, Cox -Edwards Company, Inc. (email)
WaRO Division of Water Resources (email)
l . The developer is responsible for the control of sediment on -site. If the approved erosion
and sedimentation control measures prove insufficient, the developer must take those
additional steps necessary to stop sediment from leaving this site (NCGS 113A-57(3)).
Each sediment storage device must be inspected after each storm event (NCGS 113A-
54.1(e)). Maintenance and/or clean out is necessary anytime the device is at 50% capacity.
All sediment storage measures will remain on site and functional until all grading and final
landscaping of the project is complete (15A NCAC 04B .0113).
2. The developer is responsible for obtaining all permits and approvals necessary for the
development of this project prior to the commencement of this land disturbing activity.
This could include our agency's Stormwater regulations and the Division of Water
Resources' enforcement requirements within Section 401 of the CIean Water Act, the U.S.
Army Corps of Engineers' jurisdiction of Section 404 of the Clean Water Act, the Division
of Coastal Management's CAMA requirements, the Division of Solid Waste
Management's landfill regulations, the Environmental Protection Agency and/or The U.S.
Army Corps of Engineers jurisdiction of the Clean Water Act, local County or
Municipalities' ordinances, or others that may be required. This approval cannot supersede
any other permit or approval.
3. Adequate and appropriate measures must be properly installed downstream, within the
limits of disturbance, of any land disturbing activity to prevent sediment from leaving the
limits of disturbance, entering existing drainage systems, impacting an on -site natural
watercourse or adjoining property. (NCGS 113A-57)
PROJECT INFORMATION SHEET
APPROVAL DATE:
RESPONSIBLE PARTY
PROJECT NAME:
COUNTY:
OFF -SITE BORROW
AND/OR DISPOSAL SITE:
START-UP DATE:
CONTRACTOR:
ON -SITE CONTACT:
ON -SITE PHONE NO.:
OFFICE PHONE NO.:
15. 2021
Outlaw Mobile Homes. Inc.
Bonnie Farms - Phase 2
Wayne NO.: Wayne-2021-029
NO.:
COMPLETE & RETURN THIS FORM
PRIOR TO THE START OF CONSTRUCTION TO:
N.C.D.E.Q.
LAND QUALITY SECTION
ATTN: James Edwards
943 WASHINGTON SQUARE MALL
WASHINGTON, NORTH CAROLINA 27889
james.edwards@ncdenr.gov
CERTIFICATE OfFPLAN APPROVAL
The posting of this certificate certifies than: an erosion and sedimetation control plan has been
approved for this project by the North Carolina Department of Environmental Quality in
accordance with North Carolina General Statute 113A — 57 (4) and 1.13A — 54 (d) (4) and North
Carolina Administrative Code, Title 15A, Ch. pte 4B.0107 (c). This certificate must be posted
at the primary entrance of the job site before construction begifts and until establishment of
permanent groundcov s re ui& b Torth Carolin. � "s t e Code, Title 15A,
rh
Chapter 4'8.0127 (b). u r �►
rro j ect iN ame an
Date of Plan A
..w4xw+c9 v�u..,.rvw. xi .,..•a.
Certificate of Coverage Number
Regional Engineer