Loading...
HomeMy WebLinkAbout20071126 Ver 1_More Info Letter_20070628~~~ W ATF9 p Michael F. Easley, Governor \~ ~i William G. Ross Jr., Secretary ~ ice-- North Carolina Department of Environment and Natural Resources ~ ~ ~ ,~ Coleen H. Sullins, Director Division of Water Quality June 28, 2007 DWQ Project # 07-1126 Wake County CERTIFIED MAIL: RETURN RECEIPT REQUESTED McKim & Creed Atten: Carl Trautman 200 MacKenan Court Cary, North Carolina 27511 Subject Property: Maxwell Pump Station & Force Main Application Sets, Permitting Fee ® REQUEST FOR MORE INFORMATION ® PERMITTING FEE MISSING/INCORRECT ^ RETURN OF APPLICATION PACKAGE Dear Mr. Trautman: On June 25, 2007, the Division of Water Quality (DWQ) received your application dated June 25, 2007 for the above referenced project. The DWQ has determined that your application was incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, unless we receive five copies of the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H .0506 and will place this project on hold as incomplete until we receive this additional information. Please provide the following information so that we may continue to review your project. Additional Information Requested: ® Water Quality Certification, See I. Processing, Item 2.. Please state which Permit (Nationwide, Regional or General) number you intend to use. You may want to contact the U.S. Army Corps of Engineers (USAGE) to determine which permit they will allow you to use. ^ Please provide verification from the Corps of Engineers showing that your project will require a Nationwide ^ DWQ requires the name of an individual shown as "Owner/Applicant" to set up the project. ^ The PCN Application failed to contain the Applicant/Agent's Signature and Date. See last page of application. (Agent's signature is valid only if an authorization letter from applicant is provided). 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 /FAX 919-733-6893 / Internet: htto://h2o.enr.state.nc.us/ncwetlands None Carolina ~tura!!y An Equal Opportunity/Affirmative Action Employer - 50% Recycled/]0% Post Consumer Paper ® DWQ requires five (5) complete application sets. Please submit four (4) more sets including maps. ^ Lack of permitting fee. Please note that beginning January 1, 1999, the N.C. General Assembly passed legislation requiring payment of a fee for a11401 applications. The fee for applications is $200 for projects impacting less than an acre of wetland and less than 150 linear feet of streams. For projects impacting one or more acres of wetland or 150 or more feet of streams, the fee is $475. ^ DWQ is making the suggestion that all associated project maps be submitted as a PDF file on a CD in addition to two (2) paper copies. DWQ does require five (5) sets of the PCN application. ® OTHER: A review of the application reflects a 20 if of stream impact thereby making it subject to written concurrence by DWQ and cannot be accepted as a Courtesy Copy. Based on the Water Quality Certification (WQC) #3625 item 6 states: "Impacts to any stream length in the Neuse, Tar-Pamlico, Randleman and Catawba River Basins (or any other river basins with Buffer Rules in effect at the time of application) requires written concurrence from DWQ in accordance with 15A NCAC 2B.0233, .0259, .0250 and .0243. Please advise DWQ of the NW # to be applied to this project and remit $200 permitting application fee to begin the review and approval process. Please contact the DWQ within three weeks of the date of this letter to verify that you have received this letter and that you remain interested in continuing to pursue permitting of your project and will be providing the DWQ the requested information at a later date. Please contact this office in writing. If we do not hear from you within three weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Mr. Ian McMillan or me at 919-733~1~86 if you have any questions regarding or would like to set up a meeting to discuss this matter. ~~~1 Sinc , Cyndi Karoly, Supervisor 1 Oversight/Express Review Permitting Unit CBK/ljd cc: Mike Horan, DWQ Raleigh Regional Office USACE Raleigh Regulatory Field Office Froehling & Robertson, Inc., Christopher Burkhardt, 310 Hubert St., Raleigh, NC 27603 File Copy Central Files Filename: 071126Maxwel IPumpStationForceMain(Wake)_Hold_Fee