Loading...
HomeMy WebLinkAboutNC0061719_Woodlake Dam_20100108ATA NCDENR North Carolina Department of Environment and Natural Resources Division of Land Resources Land Quality Section James D. Simons, PG, PE Beverly Eaves Perdue, Governor Director and State Geologist . Dee Freeman, Secretary January 8, 2010 Woodlake Partners Limited Partnership c/o Mr. Gregory Dean Blevins, Woodlake Dam Operator 150 Woodlake Boulevard Vass, North Carolina 28394 RE: Woodlake Dam Moore County MOORE-040 H Cape Fear River Basin Dear Mr. Blevins: DER-F RO f WQ A review has been made of the project status report, dated October 19, 2009 received by this office on October 22, 2009 for the referenced dam. We concur with the phased recommendations outlined in this report by Mr. B. Dan Marks, PhD, PE, based upon a Notice of Deficiency dated February 12, 2009. In accordance with my letter of October 22, 2009, the items listed below may be performed as maintenance. Further submission'of plans or specifications for this work will not be required. The work may proceed as proposed. 1. _ Replacement or repair of the wooden access bridge to the original bottom drain intake structure. 2. Removal of woody vegetative growth on the upstream embankment slope. Once the vegetation is removed, the riprap wave protection must be repaired and maintained. The following proposed work must be designed by a North Carolina professional engineer. The engineer must submit plans, specifications and design data, and secure approval prior to beginning construction activities: 1. As noted in the report, "the concrete spillway structure is in need of significant remediation to upgrade the performance and integrity of the structure." 2. Replacement of spillway walkway and gate lifting mechanisms. The gates must remain operable during this process. Operation of the gates prior to and during significant storm events approaching the spillway design storm is critical to safe operations and performance of the dam. 1612 Mail Service Center, Raleigh, North Carolina 27699-1612 • Telephone 919-733-4574 / FAX: 919-733-2876 512 North Salisbury Street, Raleigh, North Carolina, 27604 • Internet:http://www.dlr.enr.state.nc.us/pages/landqualitysection.html Mr. Gregory Dean Blevins Woodlake Dam January 8, 2010 Page 2 of 2 Before beginning repair work on the referenced dam, 2 sets of plans and specifications for repair work to the spillway must be filed with the Division of Land Resources for approval pursuant to Title 15A, Subchapter 2K of the North Carolina Administrative Code. Each phase of the repair work may be submitted separately for approval pursuant to a proposed time line for each phase of work. Additional improvements noted in a report dated June 18, 1999 by S&ME, Inc. were recommended to be "completed in the next phase of repairs." These repairs included: 1. Repair of deteriorated concrete in vicinity of sluice gates. 2. Fill in depression approximately 40 feet left of chute. 3. Repair damaged concrete by protecting and/or replacing slab surface. 4. Repair sluice gates, i.e. deteriorated metal and gaskets. Final Approval of the repairs made in 1999 was contingent upon these additional items being completed "in the near future." At this time, repair plans for all items pertinent to the safe operation of this dam must be included in the submittal for approval. These items were confirmed during an inspection by Land Quality staff on January 6, 2010. Also, there is no record that the Woodlake Dam has an Operation and Maintenance Plan (OMP) or an Emergency Action Plan (EAP) on file with this office. These items were included as stipulations of the Approval to Repair dated August 17, 1988. The OMP & EAP are pertinent to the safe operation of this dam and will be required to be submitted prior to final approval of any necessary repairs at this time. Without proper operation of all ten gates, the spillway systems combined do not meet minimum criteria for the required spillway design storm, and may overtop the dam. Please contact Mr. Steve Cook, Regional Engineer; at telephone number (910) 433-3300 or me at telephone number (919) 733-4574 should you have any questions concerning this matter. We look forward to receiving final design documents from you. Sincerely, teven M. McEvoy, P State Dam Safety Engi Land Quality Section cc: Mr. Steve Cook, Land Quality Regional Engineer Mr. B. Dan Marks,_PhD, PE DWQ Regional Supery sor i`` File Name: MOORE-040 20100108 PDR Woodlake Dam