Loading...
HomeMy WebLinkAbout20201196 Ver 1_R-5737 additional permit site for bank stabilization_20210720 Wanucha, Dave From:Euliss, Amy Sent:Tuesday, July 20, 2021 3:46 PM To:Williams, Andrew E CIV USARMY CESAW (USA) Cc:Wanucha, Dave; Jones, Matthew W Subject:R-5737 additional permit site for bank stabilization Attachments:R5737_Permit Drawings_20210720.pdf Andy, We had to add a new permit site for bank stabilization to remove an existing concrete ditch that drains to the stream on the R-5737 project. There will be 40’ of bank stabilization at the new permit site 6. Division Maintenance has requested that we remove the existing concrete ditch and replace with a rip rap ditch, since the concrete ditches fail over time. The rip rap ditch will tie into the stream, and the stream banks will be stabilized to the DOT ROW. Would you prefer that we modify the existing permit (RGP 50), or could we do this under a non-reporting Nationwide 13? If we need to modify the existing permit, do I need to utilize the ePCN or is this something we can accomplish via email? Permit site six is sown on page 16 of 18 on the attached pdf. For reference, the USACE permit number no. is SAW 2018-01123, and the DWR no. is 2020-1196 Thanks in advance. Amy Euliss Division 9 PDEA Engineer North Carolina Department of Transportation 336 747 7802 office aeuliss@ncdot.gov 375 Silas Creek Parkway Winston Salem, NC 27127-7167 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1