Wanucha, Dave
From:Euliss, Amy
Sent:Friday, July 30, 2021 2:07 PM
To:Williams, Andrew E CIV USARMY CESAW (USA)
Cc:Wanucha, Dave; Jones, Matthew W
Subject:RE: \[External\] RE: R-5737 additional permit_DOT to Corps_2
Thanks Andy. We’ll proceed with a non-reporting NW13 and corresponding General Certification for DWR.
Amy
From: Williams, Andrew E CIV USARMY CESAW (USA) <Andrew.E.Williams2@usace.army.mil>
Sent: Friday, July 30, 2021 2:02 PM
To: Euliss, Amy <aeuliss@ncdot.gov>
Cc: Wanucha, Dave <dave.wanucha@ncdenr.gov>; Jones, Matthew W <mwjones2@ncdot.gov>
Subject: \[External\] RE: R-5737 additional permit site for bank stabilization
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Amy,
Thank you for discussing this project with me today. Based on our conversation, the proposed ditch repair is not
currently needed as part of the project but is being considered since the contractors are on the site. The ditch is not
being upgraded due of any changes resulting from the currently permitted sites (1-5). So, if this is the case, I would
agree that the bank stabilization activity at Site 6 can be authorized under a separate NWP 13 (non-reporting) as long as
you meet all the NWP regional and general conditions.
Andrew Williams
Regulatory Project Manager
Regulatory Division Office
US Army Corps of Engineers, Wilmington District
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Office Tel: (919) 554-4884, x26
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at our website at
https://regulatory.ops.usace.army.mil/customer-service-survey/
to complete the survey online.
From: Euliss, Amy <aeuliss@ncdot.gov>
Sent: Tuesday, July 20, 2021 3:46 PM
To: Williams, Andrew E CIV USARMY CESAW (USA) <Andrew.E.Williams2@usace.army.mil>
Cc: Wanucha, Dave <dave.wanucha@ncdenr.gov>; Jones, Matthew W <mwjones2@ncdot.gov>
Subject: \[Non-DoD Source\] R-5737 additional permit site for bank stabilization
Andy,
1
We had to add a new permit site for bank stabilization to remove an existing concrete ditch that drains to the stream on
the R-5737 project. There will be 40’ of bank stabilization at the new permit site 6. Division Maintenance has requested
that we remove the existing concrete ditch and replace with a rip rap ditch, since the concrete ditches fail over time.
The rip rap ditch will tie into the stream, and the stream banks will be stabilized to the DOT ROW. Would you prefer
that we modify the existing permit (RGP 50), or could we do this under a non-reporting Nationwide 13? If we need to
modify the existing permit, do I need to utilize the ePCN or is this something we can accomplish via email?
Permit site six is sown on page 16 of 18 on the attached pdf.
For reference, the USACE permit number no. is SAW 2018-01123, and the DWR no. is 2020-1196
Thanks in advance.
Amy Euliss
Division 9 PDEA Engineer
North Carolina Department of Transportation
336 747 7802 office
aeuliss@ncdot.gov
375 Silas Creek Parkway
Winston Salem, NC 27127-7167