Loading...
HomeMy WebLinkAboutNC0023868_Review of Pretreatment Annual Report_20210729ROY COOPER Governor ELIZABETH S. BISER Secretary S. DANIEL SMITH Director Mr. Robert C. Patterson, Jr., P.E. Water Resources Director City of Burlington P.O. Box 1358 Burlington, North Carolina 27216 NORTH CAROLINA Environmental Quality July 29, 2021 SUBJECT: Pretreatment Annual Report City of Burlington NPDES# NC0023876/South WWTP & NC0023868/East WWTP Alamance County Dear Mr. Patterson: The Pretreatment staff of the Division of Water Resources at the Winston-Salem Regional Office has reviewed the Pretreatment Annual Report (PAR) covering January through December 2020. Our review indicates that the PAR is adequate and satisfies the requirements of 15A NCAC 2H .908(b) and the Comprehensive Guidance for North Carolina Pretreatment Programs. Thank you for your continued support of the Pretreatment Program. If you have any questions, please contact me at (336) 776-9704 (Jim.Gonsiewski@ncdenr.gov) or Michael Montebello at (919) 707-3624(Michael.Montebello@ncdenr.gov). Sincerely, CPDocu3igmdby: `,_ ha- aotti.i E197868F179D45F... James J. Gonsiewski, PG Hydrogeologist Water Quality Regional Operations Section Division of Water Resources, NCDEQ — WSRO encl: PAR Review Form cc: PERCS Unit — Michael Montebello (Electronic Copy) Kristi King — City of Burlington (Electronic Copy) WSRO Electronic Files Laserfiche Files North Carolina Department of Environmental Quality 1 Division of Water Resources Winston-Salem Regional Office 1450 West Hanes Mill Road, Suite 3001 Winston-Salem, North Carolina 27105 336.776.9800 aL C (1) 0 C CL Regional Office: Winston-Salem POTW: City of Burlington NPDES Permit No. NC0023868 /1/20 to 12/31/20 ort Period: (o� Q) L 121 0 Cel Q) i- Q) L_ (Q .i-, a) = Q) a) 713 L lti EN c o (azo L ° E z its ❑ -0 o :p c-0 O O Cj E o cn POTW noted Corrections? 00 zz u")in W >- ❑ Z W >- ❑ ADEQUATE? ® YES ❑ NO ❑ NA Z ❑ w >- Z ❑ w } Z ❑ w } ON ❑ SJA zz ❑ Z ❑ w >- ❑ Z ❑ w >- ® YES ❑ NO ® YES ❑ NO ❑ NA = 3 V ® YES ❑ NO ❑ NA ® YES ❑ NO ® YES ❑ NO 0 Z w >- ® YES ❑ NO Q Z 0 Z ® YES El NO ❑ NA ® YES ❑ NO ® YES ❑ NO ❑ NA w >- ❑rr Narrative PPS Form u_ U) 0 Allocation Table Compliance Schedules Public Notice Program Information Historical SNC to z z ❑ Civil Penalty ❑ Civil Penalty Assessment ❑ Civil Penalty Assessment LI Civil Penalty Assessment 0 z ❑ U z ❑ U z ❑ U Z ❑ ❑ QNCR 0 0 U O' O' 0' ❑ ❑ 0 > > 0 z z z z ❑ ❑ ❑ ❑ cn 00 00 0 0 z z z z ® Yes ❑ No ❑ Not req'd ® Yes ❑ No ❑ Not req'd ® Yes ❑ No El NA ® Yes ❑ No ❑ NA 1. Have at least 90% of SIU permits been issued within 180 days of expiration? (See Allocation Table). 2. Were at least 80% of SIUs inspected? (See PPS Form) 3. Has effective enforcement been taken against industries in SNC, including those causing pass -through or interference? (See Narrative and SNCR Form) 4. Does public notice cover all SIUs in SNC? a) c 0 0 a) C a) E E 0 0 a) L a) 0 x a) a) 0 c 0 0 a) x W O L ~ c O O cri NJ-0 w 4-1 0 a) • o c `�- 0_ 0 co _c(f)E (a c ✓ ▪ L tec tn 0 a) c c c U V a c Q) (a N.C'n c E (v o 0 L N Q) C a N_ Y U fO L c o0 v 0 Q) Z c • N4.0 3 0 N O c .69• N O " () a)N N w cro C 0 0 W Z u. Date: 07/29/2021 Reviewed By: Jim Gonsie