HomeMy WebLinkAbout20210465 Ver 1_SAW-2019-01242 PJD Form_20210601 (2) ATTACHMENT
PRELIMINARY JURISDICTIONAL DETERMINATION FORM
BACKGROUND INFORMATION
A. REPORT COMPLETION DATE FOR PRELIMINARY JURISDICTIONAL
DETERMINATION (JD): 6/1/2021
B. NAME AND ADDRESS OF PERSON REQUESTING PRELIMINARY JD:
North Carolina Department of Transportation, Highway Division 7
1584 Yanceyville Street, Greensboro, 27415-4996
C. DISTRICT OFFICE, FILE NAME, AND NUMBER:
SAW-2019-01242 (NCDOT/ Bridge 106 /SR 1902/ Dibrell Road / Rockingham County/transportation)
D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION:
Replace 17BP.7.R.126 Bridge No. 106 over Wolf Island Creek on
SR 1902 (Dibrell Road)
(USE THE ATTACHED TABLE TO DOCUMENT MULTIPLE WATERBODIES
AT DIFFERENT SITES)
State: North Carolina County/parish/borough: Rockingham County City:
Pelham
Center coordinates of site (lat/long in degree decimal format):
Lat. 36.498439 °, Long. -79.541766°
Name of nearest waterbody: Wolf Island Creek
Identify (estimate) amount of waters in the review area:
Non-wetland waters: 634 linear feet: 20-80 width (ft)
Cowardin Class: R3UB2
Stream Flow: Perennial
Wetlands: 0.80 acres
Cowardin Class: PEM2/PFO1
Name of any water bodies on the site that have been identified as Section 10
waters:
Tidal: 0
Non-Tidal: 0
E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT
APPLY):
x Office (Desk) Determination. Date: 3/25/2020
Field Determination. Date(s):
1. The Corps of Engineers believes that there may be jurisdictional waters of the
United States on the subject site, and the permit applicant or other affected party
1
who requested this preliminary JD is hereby advised of his or her option to
request and obtain an approved jurisdictional determination (JD) for that site.
Nevertheless, the permit applicant or other person who requested this
preliminary JD has declined to exercise the option to obtain an approved JD in
this instance and at this time.
2. In any circumstance where a permit applicant obtains an individual permit, or
a Nationwide General Permit (NWP) or other general permit verification requiring
"pre-construction notification" (PCN), or requests verification for a non-reporting
NWP or other general permit, and the permit applicant has not requested an
approved JD for the activity, the permit applicant is hereby made aware of the
following: (1) the permit applicant has elected to seek a permit authorization
based on a preliminary JD, which does not make an official determination of
jurisdictional waters; (2) that the applicant has the option to request an approved
JD before accepting the terms and conditions of the permit authorization, and
that basing a permit authorization on an approved JD could possibly result in less
compensatory mitigation being required or different special conditions; (3) that
the applicant has the right to request an individual permit rather than accepting
the terms and conditions of the NWP or other general permit authorization; (4)
that the applicant can accept a permit authorization and thereby agree to comply
with all the terms and conditions of that permit, including whatever mitigation
requirements the Corps has determined to be necessary; (5) that undertaking
any activity in reliance upon the subject permit authorization without requesting
an approved JD constitutes the applicant's acceptance of the use of the
preliminary JD, but that either form of JD will be processed as soon as is
practicable; (6) accepting a permit authorization (e.g., signing a proffered
individual permit) or undertaking any activity in reliance on any form of Corps
permit authorization based on a preliminary JD constitutes agreement that all
wetlands and other water bodies on the site affected in any way by that activity
are jurisdictional waters of the United States, and precludes any challenge to
such jurisdiction in any administrative or judicial compliance or enforcement
action, or in any administrative appeal or in any Federal court; and (7) whether
the applicant elects to use either an approved JD or a preliminary JD, that JD
will be processed as soon as is practicable. Further, an approved JD, a proffered
individual permit (and all terms and conditions contained therein), or individual
permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331,
and that in any administrative appeal, jurisdictional issues can be raised (see 33
C.F.R. 331.5(a)(2)). If, during that administrative appeal, it becomes necessary
to make an official determination whether CWA jurisdiction exists over a site, or
to provide an official delineation of jurisdictional waters on the site, the Corps will
provide an approved JD to accomplish that result, as soon as is practicable.
This preliminary JD finds that there "may be"waters of the United States on the
subject project site, and identifies all aquatic features on the site that could be
affected by the proposed activity, based on the following information:
2
SUPPORTING DATA. Data reviewed for preliminary JD (check all that apply
- checked items should be included in case file and, where checked and
requested, appropriately reference sources below):
O Maps, plans, plots or plat submitted by or on behalf of the
applicant/consultant: Aerial, soils, and topo maps (Axiom)
® Data sheets prepared/submitted by or on behalf of the
applicant/consultant.
0 Office concurs with data sheets/delineation report.
[' Office does not concur with data sheets/delineation report.
Data sheets prepared by the Corps: .
Corps navigable waters' study: .
❑ U.S. Geological Survey Hydrologic Atlas: .
❑ USGS NHD data.
❑ USGS 8 and 12 digit HUC maps.
® U.S. Geological Survey map(s). Cite scale & quad name: Ruffin and
Brosville, NC (2002) 7.5-minute topographic quadrangle.
® USDA Natural Resources Conservation Service Soil Survey. Citation:
Web Soil Survey (online at http://websoilsurvey.nrcs.usda.gov), and Soil
Survey of Rockingham County (1977)
❑ National wetlands inventory map(s). Cite name: .
❑ State/Local wetland inventory map(s): .
FEMA/FIRM maps: .
❑ 100-year Floodplain Elevation is: (National Geodetic Vertical Datum
of 1929)
® Photographs: ® Aerial (Name & Date): NC OneMap 2014 Orthoimagery.
or ❑ Other (Name & Date): .
❑ Previous determination(s). File no. and date of response letter: .
Other information (please specify): .
IMPORTANT NOTE: The information recorded on this form has not
necessarily been verified by the Corps and should not be relied upon for
later jurisdictional determinations.
Date:
g 2021.06.01
11:05:25 -04'00'
Signature and date of Signature and date of
Regulatory Project Manager person requesting preliminary JD
(REQUIRED) (REQUIRED, unless obtaining
the signature is impracticable)
3
Estimated amount
Cowardin of aquatic Class of
Class resource in review aquatic
Site number Latitude Longitude area resource
1. Wolf Island 278 feet length, non-section 10
Creek 36.498570 -79.541721 R3UB2 60-80 feet avg —non-wetland
width
356 feet length, non-section 10
2. Stream SA 36.498669 -79.542429 R3UB2 10-20 feet avg —non-wetland
width
3. Wetland WA 36.497731 -79.541286 PFO1 0.64 acre non-section 10
wetland
4. Wetland WB 36.500045 -79.542934 PFO1 0.04 acre non-section 10
wetland
5. Wetland WC 36.499500 -79.542865 PEM2 0.06 acre non-section 10
wetland
6. Wetland WD 36.499384 -79.542867 PEM2 0.06 acre non-section 10
wetland
4
Wetland WB
iAi 6.
Y' .,:. ,, Wetland WC
Obi ,di":•w l i - a •_
). 'yWetland WD
Stream.SA) .' 'Villi .: -. -- ''' ,...... 1.' j- �°'a `r '
i,r
+,. ; -1`LY .,,~ • . [ _ l N.. -h .r ,•-
.. < ,\'-4 f.1 M O••S.'v-;v- `lit" a
•
yam -y •- ,�i.'S ,+''R .` �� �y�
.v. -,
-r *; ,�'. ,��:•Wolf Island Creek• _��. = S.r. �� �5-, ;,
L.
-" -1 4 r- ti T� '
•
, ° .. d'` ` - • Wetland WA'.. ;.i
'4
Legend . N. .
Q Study area ' •t V.-
7.tl;;: Potential wetland waters y fy , '' ,r AL, ay' . 4
Potential non-wetland waters(perennial) ,n "�•. ;,.: ' • �` ;*,! - • •• il.
►'-
-► Direction of flow . '"O,=,Y ' ^4 - :max• : '` • -
o Wetland data form location ' +.� `
• Stream data form location •y, iF{ t
* 100 50 0 100 200
NCDOT roads
—��� Feet
Prepared for: Project: Title: Drawn by: AEK
WBS 17BP.7.R.126
et.,,,toRr� Date: Dec 2018
A ... 1%)
Replace Bridge No. 106 on Potential Scale: 1:2400
Dibrell Road Jurisdictional Project No.:18-007.04
over Wolf Island Creek Areas
ra � Rockingham County, NC FIGURE
Axiom ErwIronm•nial•Inc.
Background Imagery:2014 aerial photography provided by the NC OneMap Program
(online,supported by the N.C.Geographic Information Coordination Council).