Loading...
HomeMy WebLinkAbout20200259 Ver 2_July Site Inspection_20210730 Wetland Inspection Report Project Num: 20200259 Version: 1 Status: Issued Project Name: NCDOT-Replace Bridge 663 on SR 1002 (BR-0125) Project Type: Replace bridge with bridge County: Wilkes Region: Winston-Salem Location: NCDOT- Replace Bridge 663 on SR 1002 (BR-0125) Latitude: +36° 19' 57" Longitude: -81° 02' 59" SW Plan Location: Site Owner Name: NC DOT Division 11 Inspection Date: 7/1/2021 Reason for Inspection: Routine Inspection Type: Site Inspection(DOT) Inspection Contact Person: Title: Phone: On-Site Representative(s): Primary Inspector: Dave Wanucha Phone: 336-776-9703 Secondary Inspector(s): Facility Compliance Status: • Compliant ❑ Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: Permit(401 WQC) Inspection Summary: page 1 Site Number: 20200259 Owner: Pettyiohn,Michael A. Inspection Date: 7/1/2021 Inspection Type: Site Inspection(DOT) Reason for Visit: Routine Permit(401 WQC) Yes No NA NE Does the impact(s)match what was approved in the 401 WQC or non 404 permit? • DOD Are the culverts and/or filled areas installed properly? ❑ ❑ • ❑ Is the site compliant with additional conditions of the 401 WQC or non 404 permit? DOE Comment: Stream relocation was constructed and appeared to be stable. Riprap not yet placed along bents. Bridge work only partly complete. Met with Div 11 DEO of project staff at the site. Overall,project is progressing per the permitted plans. page: 2