Loading...
HomeMy WebLinkAboutSW1210503_O&M Agreement/Plan_20210730^, sn- & Maintenance Agreement Project dame:lHot Springs Micragrid Project Location:' -Not Springs, NC (Lat: 35.89, Lang:-82.83) _ serer Mantenance records shall be kept on Me following SCM(s). This maintenance record shall be kept in a log in a known set location. A,... e^t Sf M ele-'eats noted to the :nspect!on razll be corrected. repaired. or replaced Immediately. These ds`clencies car, affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s). The SCM;sI on flits prqa't land de (dteck A that apply & cc Infiltration Basin Quantity. Mfit, atian Trench Quantity Biore4ention Cell Quantity. Wet Pond Quantity Stormwater Wetland Quantity Pe-meable Pavement Quantity Sand Filter Quantity Rates-'.er Harvesting Quantity - Green Roof Quantity Level Spreader - Fitter Strip Quantity Propnetary System Quantity. Treatm ert Swale Quantity Dry Pond Quantity. D;sconnected Impervious Surface Present - User Defined SCM Present: Lcw Density Present es O&M sheets wit Locabon(s), Location(s)- Locatton(s): Location(s)- Locatton(s). Location(s)- Location(s): Locations) Location(s): Location(s)- Location(s): Location(s). Location(s): Location(s) Location(s): Type 1-Z -re50 — •.Firi+ I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above, and attached O8M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Responsible Party Title & Organization: Street address City, state, zip: Phone number(s) Email: Cojn!v of ri Project Manager at United Renewable Energy LLC MIS Shiloh Road Alpharetta, GA 30005 678.881.0014 jn' olosi(Lbu-renew.com Date -j,Zq,s9z1 a Notary Public for the State of p� do hereby certify that JOY) -}4-*n U-&L_ o personally appeared before me this {-i, day of and acknowledge the due execution oA�aof th r aintenance Agreement Witness . tness my hand and official seal .— I... I -() COUNTY , Lai My commission expires !-� � *+s^Y O&M Agreement P4 Veage i of i sSi.Y9 r S User Defined SCM Maintenance Requirements Section 1 Important operation and maintenance procedures: NCDEQ E-6 RECOMMENDATION 1: AVOID COMPACTION OF SUBSOIL NCDEQ E-6 RECOMMENDATION 3: AVOID CONCENTRATION OF STORMWATER NCDEQ E-6 RECOMMENDATION 4: MINIMIZE USE OF HERBICIDES AND FERTILIZERS Vegetation shall be in meadow conditions to alleviate sediment load leaving the site. The system will be inspected at least quarterly. Records of operation and maintenance will be kept in a known set location and will be available upon request. Section 2 Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. SCM element: Potential problem: How to remediate the problem: Vegetative Cover Bare soil / Erosion Replant as necessary and/or grade to reduce erosion. Vegetative Cover Vegetation Vegetation shall be maintain at approximately 10-12 inches Receiving Water Body Sediment Loading Contact NC Division of Water Quality Low Density Maintenance Requirements Important maintenance procedures: The drainage area to the vegetated conveyance or vegetated receiving area will be carefully managed to reduce the sediment load to the vegetated conveyance or vegetated receiving area. After the initial fertilization to establish the grass in the vegetated conveyance or the vegetated receiving area, fertilizer will not be applied to the vegetated receiving areas. The vegetated conveyance or vegetated receiving area will be inspected quarterly. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. SCM element: Potential problem: How to remediate the problem: Vegetation is too short or Maintain grassed vegetation such that the swale or vegetated Vegetation too long. area does not erode during the peak flow from the 10-year storm Trash/debris is present. Remove the trash/debris. Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then re - Vegetated receiving areas erosive gullies have sod (or plant with other appropriate species) and water until formed. established. Provide lime and a one-time fertilizer application.