HomeMy WebLinkAboutNCG030070_DMR Upload Review_20210730Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 7/13/2021 4:02:18 PM (DMR Submittal)
Submit by McCoy, Suzanne 7/30/2021 11:55:48 AM (DMR Submittal Review)
• The task was assigned to McCoy, Suzanne 7/13/2021 4:02 PM
d� 4
NORTH LAROLI NA
Enrlmnmenfcl Quouty
DMR Submittal from 7/13/2021
Permit and Facility Information:
Permit Number* Enter ODCor Individual Fbrrrit Ninber
NCG030070
Mast begin w ith NCS or NM
Facility Name:* ABB Motors and Mechanical
County:* Buncombe
Note: Facility name and county are used to help the reviewer verify the permit number entered, and to display the
Regional Office address on the submitter's form (not here). These metadata details will be pulled from current BIMS
information after the DMR(s) are filed. If the submittal is accepted, simply note any errors in the reviewer's comments.
Monitoring Period Information:
Monitoring Period VUTatisthe YEAR ofthe sanpledate(s)?
Year:* 2021
DM R Upload* Oickthe upload button or drag and drop files here to attach document.
ABB DMR 05.03.2021.pdf 127.96KB
ABB DMR 06.2021.pdf 127.16KB
Only FDFs are accepted.
Comments:
17 By checking the box and signing box below, I certify that:
have given true, accurate, and complete information on this form;
• I agree that submission of this Data Monitoring Report (DMR) upload form is a "transaction" subject to Chapter 66,
Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes
(the "Uniform Electronic Transactions Act");
• I understand that an electronic signature on this upload form has the same legal effect and can be enforced in the
same way as a written signature; AND
• I intend to electronically sign and submit this DMR upload form.
Full Name:* Gary Massey
%me of person subrritting this form
Email Address:* gary.massey@us.abb.com
Phone Number:* 828-645-1718
Signature:
Date: * 07/13/2021
Review
Review Date: 07/30/2021
Confirm Permit No.* Correct the perrritIDnurrberifneeded.
NCG030070
ConfirmDMRYear* 2021
Multiple DMRs will be automatically filed in a subfolder denoting the sampling year entered above.
Can submittal be r Yes
accepted?* r No (Explain why below)
Do Central Office r No
staff need to be r Yes
alerted?*
Do Regional Office r No
staff need to be r Yes
alerted?
Type of Permit* General
Ensures DUZ s) filed correctly.