HomeMy WebLinkAboutNCG060238_2021 DMR_20210713r-
Ire.%1) ir.rrrr� t hl..i. w
July 9, 2021
North Carolina Department of Environmental Quality
Fayetteville Regional Office
ATTN: DEMLR Stormwater Program
225 Green Street, Suite 714
Fayetteville, NC 28301
RE: Permit No. NCG060238
To Whom it May Concern:
Mountaire Farms — Candor Feed Mill was unable to obtain a representative stormwater sample during
the January 1, 2021-June 30, 2021 sampling period due to stormwater upgrade project. The purpose
of this project was to regrade drainage ditches and stormwater outfalls that had been eroded in some
areas. Though originally intended to be completed by the end of May, several factors including the
fuel shortage delayed the project. I can be reached at (919) 663-6729 or egordorECa-)-mountaire.com if
you have any questions.
Sincerely,
Elizabeth Gordon
Environmental Compliance Auditor
cc: Jody Jackson, Mountaire
James Hendrick, Mountaire
Tanya Rogers -Vickers, Mountaire
Mountaire Farms Inc.
We measure quality by how well we W)Tice 0117• h7terr7al and external customers