HomeMy WebLinkAbout820142_Routine Inspection_20210701mg
Facility Number
Division of Water Resources
O Division of Soil and Water Conservation
0 Other Agency
Type of Visit: ®'compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: O'i(outine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: �! G
Arrival Time:
Farm Name: m,` -r 7"Yti✓;4"-e1`7
Owner Name: a'ker y f 7? e-ke Y ( i P 2-
Mailing Address:
Physical Address:
Facility Contact:
Departure Time:
1/9:A2
Owner Email:
Phone:
County: Region: Fi
Onsite Representative:
Certified Operator:
Back-up Operator:
Location of Farm:
trYiek Title:
r~73 M /-hf37.-
Latitude:
Phone:
Integrator:
Certification Number:
Certification Number:
Longitude:
Swine
Design Current
Capacity Pop.
Wean to Finish
//Wean
to Feeder
_ ea
-- —Feeder
to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other
Other
Design Current
Wet Poultry Capacity Pop.
Layer
Non -Layer
Design Current
Dry Poultry Capacity Pop.
Cattle
Design Current
Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: [1 Structure fl Application Field fl Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (if yes, notify DWR) ® Yes 0 No 1111 NA ❑ NE
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR) n Yes No NA NE
2. Is there evidence of a past discharge from any part of the operation'? fl Yes No ❑ NA 0 NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters fl Yes FrNo 0 NA 0 NE
of the State other than from a discharge?
Yes Ef No NA ❑ NE
Yes 0 No ❑ NA 0 NE
Page 1 of ' 3
2/4/2015 Continued
Facility Number: IQ, -
Date of Inspection: 7- /- go
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate?
a. If yes, is waste level into the structural freeboard?
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in):
❑ Yes �No ❑ NA ❑ NE
El Yes 11] No El NA El NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ErNo ❑ NA ❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes �No ❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes VNo ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes INo ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes 12I/No ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ErNo ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes 12410 ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):,.yjlaa.
13. Soil Type(s): ?(fr
14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes lEl/No ❑ NA ❑ NE
15. Does the receiving crop and/or land application site need improvement? ❑ Yes ®'No ❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes IZ7No ❑ NA ❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application? ❑ Yes 'No ❑ NA ❑ NE
18. Is there a lack of properly operating waste application equipment? ❑ Yes /❑No ❑ NA ❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE
the appropriate box.
❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other:
21. Does record keeping need improvement? If yes, check thc appropriate box below. ❑ Yes No ❑ NA ❑ NE
ri Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes 'N ❑ NA ❑ NE
23. If selected, did thc facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE
Page 2 of 3 2/4/2015 Continued
Facility Number:,
Date of Inspection:
24. Did the facility fail to calibrate waste application equipment as required by the permit?
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check
the appropriate box(es) below.
❑ Failure to complete annual sludge survey [1 Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
❑ Yes ErNo ❑ NA ❑ NE
❑ Yes 121\lo ❑NA ❑NE
26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes INo ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ENo ❑ NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ErNo 0 NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ElNo ❑ NA ❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes [/] No ❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
34. Does the facility require a follow-up visit by the same agency'?
❑ Yes ErNo ❑ NA ❑ NE
n Y• es ErNo ❑ NA ❑ NE
n Y• esio ❑ NA ❑ NE
Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional pages as necessary).
Reviewer/Inspector Name:
Reviewer/Inspector Signature:
Page 3 of 3
Phone: 97 3 D3 6 (.S/
Date:
2/4/2015