Loading...
HomeMy WebLinkAbout27_Streets & Stormwater Bi-Weekly Report (21 June - 2 July) PW GOLDSB OR• City Manager Weekly Update BE MORE DO MORE SEYMOUR Completed Work Current Work • Storm Water: jet-vac: 4 caicn aasin and 30 linear feet of pipe. Reshape and regrade ditch between 41" & 61" St. • Installed 200 ft of HDPE pipe at 103 Farrington PI. Plan, coordinate and complete (4) residential pipe installation • Repaired 2 stormwater cave-ins: 213 Pinewood Dr/306 Mimosa Pk requests: South Dr./FaFFORgteR Place next cr,r, pleted • Street Swp'r: 40.3 curb mi's. Vegetation mngt: 12 ditches/7,431 LF Complete full depth repair on Hickory Dr. • Streets Div: Cut down/removed fallen tree/debris from 2 locations Initiate vegetation control on Hodges St. • Repaired 13 utility cuts 26 potholes and 6 street patch repairs Continue with making tree root damage repairs to roadway. • Assist'd Stormwater crew w/200 t pipe installation @ Farrington PI Continue sidewalk repair operations on N. Georgia Ave. • Repaired stormwater cave-in at 306 Mimosa Park Dr • Both crews cleared 75 catch basins during heavy rain event Future Work Issues Concerns • Swipe ditch and remove obstructions from Berkley Park ditch Stormwater: Tymco and Elgin treet sweeper down due to • Cut back and clear ditch at Baines PI and restore water flow electrical and mechanical problems. • Possible demo of existing running track at Dillard Academy JetVac sent to Monroe for repairs • Cont' ongoing concrete/roadway repairs throughout the city. Streets: No issues this week. 7/1/2021 1