HomeMy WebLinkAbout15_Annual Neuse NSW program report cover letter G LDSBORC
BE MORE DO MORE SEYMOUR
October 30, 2020
Jim Hawhee, M.S., J.D./
Trish D'Arconte, QEP
Program Consultant
Division of Water Resources,Nonpoint Source Planning Branch
N.C. Department of Environmental Quality
jim.hawheea nedenr.sov
trish.darconte o ncdenr.gov
512 N. Salisbury Street
1617 Mail Service Center
Raleigh,NC 27699-1617
Dear Mr. Hawhee/D'Acronete,:
The City of Goldsboro is pleased to submit its Annual Neuse River Basin Stormwater
Management Program Report for 2020. The 2020 Annual Stormwater Report (enclosed)
covers the period from 1 July 2019 to 30 June 2020.
The City continued its annual SCM inspection program for 2019-20. Two City inspectors
performed 109 SCM inspections this past year.Nine (9) SCMs were identified as
requiring maintenance before next year's inspection and maintenance has begun on three
(3) of these to preclude the possibility of performance degradation and Notice of
Violation notices.
The City has no jurisdictional issues arising from the planning process.
A summary of activities under the Illegal Discharge program follows:
The City of Goldsboro established a hotline for illegal discharge reporting in 2004. The
phone number is provided to citizens on the Annual Drinking Water Quality Report, The
City's website is continuously undergoing updates and at the present time illicit
discharges can be logged into the City of Goldsboro Citizen Request/311 link which is
available on the City of Goldsboro web page or on the Engineering Department
Stormwater Management webpage. There are forms and a process set up for recording
and acting on reports. The responsibility for monitoring the hotline rests with the City
Engineers office. Our Public Works Stormwater Division monitors our storm drainage
system for illegal/illicit discharges during dry weather. No reports of illegal discharges
have been received since the last Annual report.
The City relooked three retrofit sites in 2015; The John Street Parking Lot, the Transfer
Station, and the Borrow Pit. Three worksheets and maps were included in the 2015
report.
The Education Action Plan summary of past activity for 2019-2020 and planned
activities for the upcoming year is enclosed.
If you need any additional information please contact me at 919-580-4377.
R ectfull ,
0 --
Guy M. Anderson, PE, CFM
City Engineer
Enclosures:
1. 2019-2020 Annual Stormwater Report
2. Education Action Plan Summary for 2019-2020
3. CWEP Cost Share Invoice
4. CWEP Annual Report
5. CWEP Visit Summary and Photos