HomeMy WebLinkAboutNCC214362_ESC Approval Submitted_20210730. Ro'Y COOPER - NF ST�ti7iq Governor DIONNE DELLI-GATTI Secretary •� WRENN NOR�talQue Director Director W May 13, 2021 LETTER OF APPROVAL WITH MODIFICATIONS City of Winston-Salem ATTN: Robert Prestwood, City Engineer PO Box 2511 Winston-Salem, NC 27102 RE: Project Name: Quarry Park - Phase 2 Acres Approved: 8.42 Project ID: FORSY-2021-040 County: Forsyth City: Winston-Salem Address: Reynolds Park Rd. River Basin: Yadkin-PeeDee Stream Classification: C Submitted By: Stimmel Date Received by LQS: April 14, 2021 Plan Type: New Dear Sir or Madam: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the eNOI form to Annette Lucas at Annette.lucas@ncdenngov or Paul Clark at Paul.clark@ncdenr.gov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. NOM C DUM Department of envlrmmental Quality I DMWn of Energy, Mineral and Land Resources WUMm-SalemRegkxWOffice 1 45OHams Mill Roadstdte3Ool WFnstoirSatem.NaihCaraHna27103 Letter of Approval City of Winston-Salem May 13, 2021 Page 2 of 3 Title 1SA NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Za hary entz, El Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCG01 Fact Sheet c: Stimmel ATTN: J. Neal Tucker, F.E. 601 N. Trade St., Suite 200 Winston-Salem, NC 27101 WSRO file Letter of Approval City of Winston-Salem May 13, 2021 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Quarry Park - Phase 2 Project ID: FORSY-2021-040 County: Forsyth Modifications pursuant to applicable Noah Carolina Gelieral Statute a Regulations: 1. In addition to the two baffles shown on either side of the skimmer on the plan, a third baffle must be provided on both sides. [G.S. 113A-57(3)] 2. Inlet protection must be provided for the inlets adjacent to the construction traffic road prior to land -disturbing activity to construct the road. [G.S. 113A-57(3)] Additional Comments: 1. Be advised, the stormwater outfall associated with the existing storm drainage line must be inspected per NCGO1 General Construction Stormwater Permit requirements. 2. Be advised, the financially responsible party must have all retaining walls over 4 feet designed, sealed, and construction certified by a professional engineer licensed in North Carolina in accordance with all state and local building codes/ordinances. This plan review is for erosion and sediment control and construction stormwater during construction only and does not include approval of retaining wall construction or slope - stability analysis. [North Carolina Building Code 1807]] Ref; G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities •b O t w ° ,PEJ P; b o a `PA r4 o lil "r, .r., 960 0 pug .p1m . 0z "a `V •° . HON .o ~ U o .pa OF 0 t N W v p., .� Z a a 42 W PO w O U N c� U (m ¢,U