HomeMy WebLinkAbout20211109 Ver 1_Pre-Filing Acknowledgement Email_20210729Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Thursday, July 29, 2021 9:14 AM
To: robert.turnbull@terracon.com
Cc: Ridings, Rob
Subject: Pre -Filing Meeting Request Acknowledgement - Eastfield Highway 70A Connector -
20211109 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form
for Eastfield Highway 70A Connector that you submitted on (date). The ID number for that project is
20211109, Version 1.
Reviewer Contact Information:
Reviewer: Robert Ridings
Reviewer Email: rob.ridings@ncdenr.gov
Reviewing Office: Central Office - (919) 707-9000
When you submit your application please upload a copy of the attached document in this email.
For internal use only: Transportation Project
This email was automatically generated by Laserfiche workflow. Please do not respond to this email
address, as responses are not monitored.
i
DWR Pre -Filing Meeting Request Form
ID#*
Regional Office*
Reviewer List*
20211109
Version*
Central Office - (919) 707-9000
Rob Ridings
Pre -Filing Meeting Request submitted 7/14/2021
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Robert Turnbull
robert.turnbull@terracon.com
Eastfield Highway 70A Connector
Town of Selma
Johnston
Street Address
1
101 S. Radford St., Suite 200
Address Line 2
Oty State / Province / Region
Selma NC
Fbstal / Zip Code Country
27576 USA
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
i7 401 Water Quality Certification - I— 401 Water Quality Certification -
Regular Express
I— Individual Permit I— Modification
F Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes a No
Do you know the name of the staff member you would like to request a meeting with?
Please give a brief project description below and include location information. *
Realignment of US Highway 70A associated with the Eastfield
Development in Selma.
Please attach the documentation you would like to have the meeting about.
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 7/14/2021