Loading...
HomeMy WebLinkAboutGW1-2021-01847_Well Construction - GW1_20210503 CONSTRUCTION RECORD(GW-1) For Internal Use Only: 1.Well Contractor Information: '% OCA,' inulliy 14J.WATERZ0NES' Well Contractor Nam FROM TO DESCREPITOK 4 7'2,0' NC Well Contractor CertificationI Number 15.�OUTER CASING(for :d* OkLgg%iftialkible).�_ FROM -:� T_o Vfl� S '11h YADKIN WELL COMPANY,INC. VLDIA! TER MATERIAL ft. ft. in. Company Name I I I Dow kv 16.INNER CASING OR TUBING.(gi6thi�imil,ct6seil;I60P 2.Well Construction Permit#: mom TO DIAMETER TRICIMSS MATERIAL List all applicable well construction permits(i.e.UIC,County,State,Variance,etc.) "L 579 /;L In— er ' P'le, 3.Well Use(check well use): ft. ft. in. J4 C> - Water Supply Well. 17.SCREEN ' FROM TO DIAMETER SLOT SIZE THICXNESS I MATERIAL ElAgricultural OMunicipal/Public CGeothermal(Heating/Cooling Supply) Wesidential Water Supply(single) ft. ft. in. 01ndustrial/Commercial OResidential Water Supply(shared) 18.GROUT olnigation DWells>100,000 GPD FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: ft. 164'f ft. Do U oMonitoring CIRecovery Yt. 27 . Ls� Injection Well: ft, ft. V DAquifer Recharge OGroundwater Remediation 19.-SAND/GRAVELIP.AC-K-,(if--iii6liabli)' OAquifer Storage and Recovery OSalinity Barrier FROM TO MATERIAL EMFLACLMENT NIM THOD -- OAquifer Test CStormwater Drainage ft. ft 0 ElExperimental Technology GSubsidence Control ft. ft. CGeothermal(Closed Loop) OTracer OGeothermal(Heating/Cooling Return) 00ther(explain under#21 Remarks) FROM TO DESCRIPTION(color.hardne3s,suittrock type,grain size,etc.) 0 ft' 5�- ft. Jro 1 0/ 4.Date Well(s)Completed: Well IDAM-V_7 2, 50 ft /�O ft. ft. Sa.Well Location: Phone #J_Y�,,0 706_Z Z-.AA", Facility/OwneAame If Facility]D#(if applicable) ft. ft. 31qe-,u irl I ft. ft. M0 C*s&JU�__ I? Physical Address,City,and Zip ft. ft. 21.REMARKS imp County Parcel Identification No.(PIN) �ng 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: proCes, (if well field,one lattlong is sufficient) 22.Certification: DW R U 11 41 af 6.Is(arc)the well(s): Wermanent or OTemporary Sie of Cej�Ad Well Contractor Date y rgng thisforin,I hereby certify that the well(s)was(were)constructed in accordance with 7.Is this a repair to an existing well: CYes or Zo 15ANCACO2C.0100or15ANCACO2C.0200 Well Construction Standards and that a copy If this is a repair,fill out known well construction Information and explain the nature of the of this record has been provided to the i've/l owner. repair under#21 remarks section or on the back of this farm. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only I GW-1 is needed. Indicate TOTAL NUMBER of wells (add'Sce Over in Remarks Box).'You! may also attach additional pages if necessary. drilled: 24.SUBMITTAL E14STRUCTIONS 9.Total well depth below land surface: ft) Submit this GW-I within 30 days of well completion per the following: For multiple wells list all depths if different(example-3@200'and 2@100') a00 (ft 24a. For All Wells: Original form, to Division of Water Resources (DWR), 10.Static water level below top of casing: .) Information Processing Unit 1617 1MSC,Raleigh,NC 27699-1617 if water level is above casing,use 11.Borehole diameter: (in.) Sit Off: (3 0 24b.For Injection Wells: Copy to DWR, Underground Injection Control(lUQ Program,1636 MSC,Raleigh,NC 27699-1636 12.Well construction method- AIR ROTARY 24c.For Water Supply and Open[Lo:ov Geothermal Return Wells:Copy to the (i.e.auger,rotary,cable,direct push,etc.) county environmental health department of the county where installed FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing�-ver 104,000 GPD:Copy to DWR,CCPCUA 13a.Yield(gpm) Method of test: Permit Program,1611 MSC,Raleigh,1 9-1611 tAl IdUA,- 70%HTH 13b.Disinfection type: OZ DATE SITE VISITED: Amount: I VISITED BY:, r) ._r ti I Form GW-I North Carolina Department ofEnvironmeatal Oualitv-Divisinn of Watpr P­­­l