Loading...
HomeMy WebLinkAboutNCC205646_NOT Closeout Documents_20210728North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 County: Harnett Project: Quail Glen Lots 38, 39, 40, 41 River basin: Cape Fear Person financially responsible: NVR, Inc. — Project #: HARNE-2021-061 Joe Schmidtke, VP COC: NCC205646 Address: 5734 Trinity Road, Suite 200, Raleigh, NC 27607 1. Project Location: SR 2215, Black River Pictures: No 2. Weather and soil conditions: sunny, workable soils Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: 10. Comments: Title: Date given/sent: July 27, 2021 Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO 1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https:Hedocs.deq.nc.gov/Fonns/NCGO1-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Lori Britt Date of inspection: July 06, 2021 cc: Chris Cushenette (via email) Meredith Sweitzer (via email) Ross Turnmire (via email) Others present: Time arriving on site: 10:36 AM Time leaving site: 10:46 AM