HomeMy WebLinkAboutSWA000098_Email (2)_20210728
Farkas, Jim J
From:Farkas, Jim J
Sent:Wednesday, July 28, 2021 1:04 PM
To:brian.crutchfield@timmons.com
Cc:Julian Hegemann
Subject:RE: Wesley Chapel VFD - SWA000098
Brian,
I was looking over the additional information you provided. Everything looks good except for a few small issues:
Please correct the following:
- Part D1 – Steven McLendon is listed as the signing official, however Part G of the Application is signed by David
Kale. If you would like to change the signing official to David Kale, please let me know (I can write this change in
on the original Applications that you provided so you don’t need to resubmit revised hard copies of the
Application). Under normal circumstances, we would still require some official documentation stating that
signing official (David Kale) is the Board Chairman of Wesley Chapel VFD (Original Comment #8), however, the
signature on the Application was notarized by Andrew Stallings (who is listed as the registered agent for Wesley
Chapel VFD on the SoS website), so we will accept that as meeting the requirement. If you would like to keep
Steven McLendon as the signing official, you will need to provide 2x signed hard copies of the Application (with
Steven McLendon signing Part G).
- Please upload an electronic copy of the revised Application through the following link:
https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload (If you do not have a copy of the revised form to
upload, please let me know so that I may scan and upload one of the hard copies that I have).
Hard copies should be mailed to me at the following address:
For FedEx/UPS:
Suzanne McCoy
512 N. Salisbury Street, Office 640K
Raleigh, NC 27604
For USPS:
Suzanne McCoy
1612 Mail Service Center
Raleigh, NC 27699-1612
Electronic copies should be uploaded at the following location:
https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload
Since these are really minor things, once I get the requested information and the documents are uploaded to Laserfiche
(Provided everything is still in order), we can issue the permit without doing another formal 30-45 day review (I’m
currently drafting the permit so we will be able to issue this permit very quickly once we receive the requested items).
Let me know if you have any questions.
-Jim
From: Farkas, Jim J
Sent: Monday, April 19, 2021 1:45 PM
1
To: brian.crutchfield@timmons.com
Cc: Julian Hegemann <Julian.Hegemann@timmons.com>; Moore, James <james.moore@ncdenr.gov>
Subject: Wesley Chapel VFD - SWA000098
Good Afternoon,
The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Fast Track Authorization to
st
Construct (ATC) Permit Application for the subject project on March 31, 2021. A review of that information has
determined that the application is not complete. Attached is a letter describing the items that need to be submitted. If
you have any questions, please feel free to contact me. My contact information is listed below.
Thank you,
Jim Farkas
Environmental Engineer
North Carolina Department of Environmental Quality
Division of Energy, Mineral, & Land Resources – Stormwater Program
512 N. Salisbury Street
1612 Mail Service Center
Raleigh, NC 27699-1612
(919) 707-3646
Jim.Farkas@ncdenr.gov
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has
adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or
are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to
appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your
requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging
time.