HomeMy WebLinkAboutNCC205640_MODIFICATION Supporting Documents_20210728From: Matthew Osborne To: Meaan Baum Cc: David Evans Subject: RE: [EXTERNAL] Culvers Restaurant Winston-Salem (A/P #: EN2000176) (Cityworks Tracking Number: Date: Thursday, July 29, 2021 9:07:47 AM Attachments: imaoe006xno image007.png imaae008.ona imaae009.Dna Number of Recipients: 1 Sent: 07/28/2021 10:12:32 AM Sent by: Matthew Osborne To: dwilliams@bowmanconsulting.com Cc: Bcc: Subject: Review Completed - Culvers Restaurant Winston-Salem Attachments: Application Type: 04.02) Grading/Erosion Control Permit Workflow: 04.02) Grading & Erosion Control Project: Culvers Restaurant Winston-Salem A/P #: EN2000176 Acreage to be Disturbed: 2.58 https://winston-salem.idiplans.com/secure/project/?12rojectid-455179 Hello Donna Williams, Thank you for submitting your project to City of Winston-Salem. Review of the plans for this project have been completed. The design is adequate to meet the ordinance standards and the plans have been approved. If you have not already done so, please provide an original signed and notarized Financial Responsibility/Ownership form. This document is required prior to the issuance of the Grading/Erosion Control Permit. If this has already been provided, then please disregard this statement. If this project will disturb more than 1 acre or is part of a larger common plan of development, the Grading/Erosion Control Permit cannot be issued until documentation is provided that coverage under the NCGO1 Construction Stormwater Permit (NPDES) has been obtained. Please obtain coverage under the permit at the following website (https://edoes.deq.nc.goy/Forms/NCGOl-NOI). Once coverage is obtained please upload a copy to the project documents in the electronic plan review system. The Grading/Erosion Control Permit will not be issued until proof of coverage under NCGO1 is provided. As outlined in the Unified Development Ordinances (UDO) of Winston-Salem/Forsyth County, Village of Clemmons, Town of Lewisville, and Town of Walkertown, Erosion Control Division staff may periodically inspect sites of land disturbing activity to determine compliance with the Erosion Control ordinances and the approved Erosion Control Plan. No person shall willfully resist, delay, or obstruct an authorized representative, employee, or agent of the Erosion Control Division while that person is inspecting or attempting to inspect a land disturbing activity under the ordinance. Should you have any questions as you move forward please feel free to contact our offices. We will be happy to assist you. Matthew Osborne, CFM, CPESC Erosion Control/Floodplain Program Manager City Of Winston-Salem Field Operations Department Erosion Control Division PO Box 2511 (Mailing) 100 E. First Street, Suite 328 (Physical) Winston-Salem, NC 27101 Office: 336-747-7453 Mobile: 336-462-7480 Fax: 336-727-2792 Electronic Plan Review Application Portal: https://winston-salem.idtplans.com/secure Electronic Plan Review Application Instructions: https://winston-salem.idtplans.com/secure/training/manual NOTICE: Beginning May 1, 2018, all Grading/Erosion Control, Floodplain Development, and Watershed Protection Permit Submittals MUST be submitted electronically. From: Megan Baum <mbaum@bowman.com> Sent: Thursday, July 29, 2021 8:18 AM To: Matthew Osborne <matthewo@cityofws.org> Subject: [EXTERNAL] Culvers Restaurant Winston-Salem (A/P #: EN2000176) (Cityworks Tracking Number: ) Good morning, Matthew, I uploaded the stamped sheets and submitted the Modified NOI, but they are requiring written correspondence that the increased disturbed area is approved. They did not accept the stamped plans by themselves. Can you provide an approval letter? MEGAN BAUM Project Coordinator I BOWMAN 880 Island Park Drive, Suite 400, Charleston, SC 29492 0: (843) 501-0333 1 D: (843) 501-0328 mbaumPbowman.com I bowman.com 13F1LJ® FARLA WN (VARIABLE PV L RIIC WW) VE S 79°54 60.89' \ Y.. EROSION AND SEDIMENT CONTROL LEGEND PROPOSED .D OD OF PROPOSED GRAVEL PROPOSED RIP -RAP IP O. DRAIN PROTECTION 00 SILT FENCE STONE OUTLET / X / I of / I / � ..•r'.3. \\ \ CD S .... 79 N c9, I \ \ \ — ---� 2,: 3.55' (tot.) — — — — WATER kASEMEN CONC. N b9_°58'1 \\ \ \ \\ \ PB•65,pG 16\ 1�215. W 50. 1 \ \ p -��! \ ' :.'.:.•p CT 1fREE IN PLACE EIP 1/2" As�\ \ I \ \ \ \ \ HALT DRIVE \ \ \_�—�co '': � ',• '`_• '._44 {'-- I — SOLID \ LIMITS OF DISTURBANCE (2.58 AC) EROSION AND SEDIMENT CONTROL INITIAL PHASE SEQ ENCE OF CONSTRUCTION: (SCHEDULE PROVIDED AS PART OF CONSTRUCTION SEQUENCE IS FOR INFORMATION ONLY.) 1. OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL AND PERMIT FROM THE CITY OF WINSTON \ \ ` \ / \ "`: "` ' •': SALEM INSPECTIONS. 1\\ \ \ \ \1 \ — � � � � � — J \ :'�•�f��.�:..�s�...;;.:;::,::.,::::.. PROPOSES- CONS TION ENTRANCE 2. CONTACT EROSION CONTROL INSPECTOR TO ESTABLISH A PRE -CONSTRUCTION CONFERENCE SLE DETAIL 4 ON SHEET C302 AND INSPECTION SCHEDULE. X�\�\ � \ \ �\\ \\ � — — � ft I \ \ I \ /I I I �.•...4 .„' 2.1. SELF INSPECTION -- EFFECTIVE OCTOBER 1, 2010, PERSONS CONDUCTING LAND -DISTURBING ACTIVITIES, LARGER THAN ONE ACRE, MUST INSPECT THEIR PROJECT AFTER EACH PHASE OF \�\ \ \ \ \ \ 11 III \ I I ) / " %. :''.''; '''_' :`'•` THE PROJECT, AND DOCUMENT THE INSPECTION IN WRITING ON APPROVED FORMS f\\ \ \N\ \ \\ \ \\ bq 1 I I / I y'r; ''�:•''�'t. ';'1 ;+ r+ �i% AVAILABLE FROM THE CITY OF WINSTON-SALEM INSPECTIONS OFFICE. M 2.1.1. THE PHASES ARE AS FOLLOWS: 0 \ \ N \\ — N/F 1\ II 6RAINAG5 AREA 1: 0.72 C f '� • INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES. v� \ \ \ J�MSPIN# 6 17L03 DEVELOPMENT LLC w I f..:,►.:."'•`..'`.�,.,..:=;'.�. � �.;:.:;; • CLEARING AND GRUBBING OF EXISTING GROUND COVER. ? \\\\\ \\\ \1 \ I I \ \ \ \DB.3246, PG. 243 • COMPLETION OF ANY PHASE OF GRADING OF SLOPES OR FILLS. \\ \ \ N/F \ / U "'; '';:._:•,.'..\ • INSTALLATION OF STORM DRAINAGE FACILITIES. i \ \\ \ \I II / EMSITE DEVELOPMENT LLC �►w I r...;. f;.'•':... • COMPLETION OF CONSTRUCTIONS OR DEVELOPMENT. 2n� \\\� \\ 11 0 / \ z I I portion of \ Y /'.�_•�•�', :::',:.::';'��Y,x. • ESTABLISHMENT OF PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION. \ \ \ \ , I PIN# 6817-73-9184 \ \ \ 1\ / 9 I (DB. 3246, PG. 243) I I ' 57115.33 Sq. Feet 3. CLEAR SITE ONLY AS NECESSARY TO INSTALL INITIAL EROSION CONTROL MEASURES AS 1.311 Acres II I I1 / I..�,.::::;�.''.,..:',..::,'''• .:::`::r:':`::'r.::,'.=.:'`;.:,:' :.` �` FOLLOWS: 3.1. TEMPORARY CONSTRUCTION ENTRANCE/EXIT izl,3.2. TEMPORARY SEDIMENT BASINS. FOR SITES OVER ONE ACRE, OUTLET STRUCTURES \I. z 1 :; •'.• .':,ar: ,,.,:1 [SKIMMERS] THAT ONLY WITHDRAW WATER FROM THE SURFACE OF THE BASIN, SHALL BE \\� \\ \ \ \\ �' — — \ I 1 f';:..: • ' UTILIZED. NO SEDIMENT TRAPS OR ROCK DAMS ALLOWED.\ \ \ \ \ \ \ \ \\ I I oo /co • ".'• ::�?..:':'. .:\"•:. 99 SNC LLC 3.3. TEMPORARY DIVERSION BERMS 3.4. TEMPORARY SILT FENCING Pill 6817-83 3089 DB. / ';i' :,.;..: '�•"-.:: (3368, PG.2225) 3.5. SEED EMBANKMENTS AND DISTURBED AREAS OF DEVICES (INCLUDING "CLEAN" WATER\\� \ \ \ \ \ I I r- ,• .``. DIVERSION) UPON COMPLETION OF CONSTRUCTION. SEE GROUND STABILIZATION CRITERIA \\\ \ ` — - ��__ C \ \ \ \ \ 1 \ i.::.•:'::.:.., :, s BELOW FOR MORE INFORMATION. 2 DSEWER EASEME \ \ II ':., � .=: :' ••.' ' '91j (pB 605) • 'w`'';, _i:.4r.•',:.' ' Y 4. BEGIN CLEARING, GRUBBING, AND STRIPPING OF SITE AS REQUIRED. EARTHEN-MATERIA 40, PG. 80 \ I " : •'' 'r:' STOCKPILES ON -SITE FOR LATER DISTRIBUTION AND/OR REMOVAL, AREAS DEDICATED FOR -_\ \ '909- - \ \ IP70 MANAGEMENT OF LAND CLEARING AND DEMOLITION DEBRIS, CONSTRUCTION AND DOMESTIC f \ °° P�=� �� >� \ s so — — ----\ \ WASTE, AND HAZARDOUS OR TOXIC WASTE SHALL BE LOCATED AT LEAST 50 FEET AWAY FROM\\ \ \� 8 STORM DRAIN INLETS AND SURFACE WATERS (UNLESS IT CAN BE SHOWN THAT NO OTHER / — _ — �\ \ \ \ - --- a vim— s \ \ 1 \ // :`.'r :" ;:::•.:� / —�\\ \ _ \ -�- — \ \ 1 \ DRAIN E AREA 2: 0.35 AC ALTERNATIVES ARE REASONABLY AVAILABLE), AND WITHIN AREAS PROTECTED BY EROSION / / \ \ \ � ' = ��_ � � 5 '�•'�`x:;;. r CONTROL MEASURES. )\906o EROSION AND SEDIMENT CONTROL MAINTENANCE PLAN \ \ \ \ \\ ��\ \ \ \\\ \ \ \ — /� s04, ` 73 W \ I\ 1I1 \ \ \ // / / rY' ''':f <•;.;'..:' 1. INSPECT ALL SEDIMENTATION AND EROSION CONTROL DEVICES FOR STABILITY AND FUNCTION \ \ \ \ \\ \\ \ \ \ \ / - 03, 7'\ \ \\ \ \ 1 \ 1 \ // / "n `�+ " �•'+' EACH WEEK AND FOLLOWING EACH RAINFALL EVENT. \ \ ��\ \\ \ 902 \ , _ \ \ I \ /n l l.. ;�.., ` ` `•..'• �'``-:.,; s'' 2. REMOVE SILT/SEDIMENT FROM TEMPORARY DEVICES WHEN ACCUMULATED VOLUME HAS REACHED 50%CAPACITY. 899— U 3. REMOVE ACCUMULATED SILT/SEDIMENT FROM BEHIND TEMPORARY SEDIMENT FENCE WHEN \ \ \ �- \ \ \\ / / _$g$ — — — — — \ \ \ \ \ \ 0, DEPTH EXCEEDS APPROXIMATELY 0.5'. REPAIR AND REPLACE SILT FENCE AS NECESSARY.\ \ \ 1 III \� / / _ J \ \ \ I / I r'r:.: �•_.•�:"''.. r 4. SEED AND STABILIZE TEMPORARY DIVERSION BERMS IMMEDIATELY AFTER CONSTRUCTION \ II (/ l/I IIr, \ \ \y\ I INCLUDING "CLEAN" WATER DIVERSION BERMS. RE-GRADE/REPAIR BERMS AS REQUIRED. \ \ ((( (1 r \ \ 1\ \ 1 \ -\ Il ll 1 I \ 5. CONTRACTOR SHALL APPOINT AN ON -SITE INSPECTOR AND MAINTAIN RECORDS OF INSPECTIONS IN ACCORDANCE WITH THE PROVISIONS OF THE GENERAL NPDES STORMWATER DISCHARGE PERMIT FOR CONSTRUCTION ACTIVITIES. o�°o° \\ \ \ I I I 111 I ° �0 \ \ III x °°° °° °°� 1 I ofi I I 1 1 c� / \ EIP 1/2„ I \ GROUND STABILIZATION CRITERIA STABILIZATION SITE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS TIMEFRAME PERIMETER DIKES, SWALES, 7 DAYS NONE DITCHES, & SLOPES SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 1 O' OR LESS IN LENGTH & ARE NOT STEEPER THAN 2:1, 14 DAYS ALLOWED SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES > 50 FEET IN LENGTH ALL OTHER AREAS WITH 14 DAYS NONE SLOPES FLATTER THAN 4:1 North Coro l ino one -Co I I Center 2300 W. Meadowview Road, Suite 227 Greensboro, North Carolina 27407 (910) 855-5760 2 DAYS BEFORE DIGGING IN NORTH CAROLINA CALL I-&®®=652=4�4� UNDERGROUND LOCATORS. CONTRACTOR SHALL CONTACT THE UNDERGROUND LOCATORS EVERY 10 DAYS FOR AN UPDATE TO UTILITY LOCATIONS. CcII 5E�:ORE you ®Icz;1 ''It's The Law' �x °00 III I I I III II N 111 II \ \ / / I REBAR °° �0o°° `o°� ° cl1 / / / jll S77°36,2=__� _�--ill L 1- — � � // / ;,� \ '�Y a31 i �Zd3�' "�j // //// j/ / �1 WS/FC EROSION CONTROL NOTICE 1\\ \ \ \ I 1 I I 1 \ \ 1:•�� : I • :.:•., I 1 / / / / / / / / \\ PLANS APPROVED FOR CONSTRUCTION 11 � \ \ 1 \ \ \ \ \ ;:.; / / . �•� I I I // / // / / AC /QVI� AD1+C1�A // / / % � #'roll -sz-35 / / / / This plan complies with Chapter 8, Section 4 - Erosion Control I \ \\ I 1 1 \ \ J /� j �� / / / (� (// / /(de%ao 5(PG2 / / �_ _ _ _ _ _ = of the Winston-Salem/Forsyth County Unified Development / L�J \ \ \\ \\\ \\\\ \� _ —_ Ordinance. A printed set of the stamped/approved plans must �_____________ X \\ \\ \ \ be kept on the construction site for reference when installing /x_x required erosion control measures. �Y, _f matthewo 07/28/2021 10:11:53 AM +�x�x 0 0 Z 30 15 0 30 60 GRAPHIC SCALE 1"=30' F J Wa oZ m° u J Q o (� rn N L = b (n N N E o0 J Q ° C3 - O E -4 C o0 C o U U E c,s .� ai CZ o LO _ c,s E 0 c ro o m MO W O Z LU J 0 Li (n Q v z 0 ~ 2 J �z LL Q � W 0 � rr^^ Vi Z O 0 oc Ln 0 O F--I LU LU O 0 I--� z 0 LU m J It LU LU iD � C ARO���i 048306 11 PLAN STATUS 2/16/21 UTILITY REVISIONS 4/6/21 CITY OF WINSTON-SALEM 5/28/21 CITY OF WINSTON-SALEM 7/16/21 CITY OF WINSTON-SALEM 7/23/21 CITY OF WINSTON-SALEM DATE DESCRIPTION HW DESIGN HW DRAWN YY CHKD SCALE H' V: JOB No.150048-01-00 DATE APRIL, 2020 FILE No. 150048-D-CP-001 NC LICENSE No. C-3556 Cad file name: V:\150048 - Culver's\150048-01-001 (ENG) - Culver's Restaurant Winston-Salem\Engineering\Engineering Plans\Construction Plans\150048-D-CP-001-ESP.dwg 7/23/2021 LOD HAS BEEN REVISED TO 2.58 AC SHEETC3 00 360-89, FAIRL A V1/N Dl (VARIABLE PUBLIC VE :.° IC WW) + r EROSION AND SEDIMENT CONTROL LEGEND —gr�— PROPOSED SILT FENCE LOD LOD LIMITS OF DISTURBANCE PROPOSED GRAVEL PROPOSED RIP -RAP IP STORM DRAIN INLET PROTECTION SILT FENCE STONE OUTLET ETEMPORARY SEEDING SCHEDULE / X / I I — — / I of / I / � ..•r'.3. \\ \ LO CD 2- S Y.. N c9, I \ \ \ \ — ---� 2,: 3.55' (tot.) — — — — _ WATER k, SEMEN I "'[..,::y ; 2- T \ \ / -T 215.3 \ I \ \ \ \ ASPHALTDRIVE TS o --- "oco 65 SOLID \ s s s s \\ I \ \ III IP - - - - - - - - - - - - - _ = LIMITS OF DISTURBANCE (2.58 AC) \ - j� -- TS f'\:[• X, \ \ �\ 1 \ / all \ �� �\ � � •.. �� 7 EIP 1/2" \� \ \ \\ 1\ ll 1 �' r` �. •9. / I OPEN �\ \ \ \ \ \ \I 1 \ I : 3 .: .•.: / TOP \�\ \ \ 11 all \ Cl) I P) �: 'F• f EROSION AND SEDIMENT CONTROL INITIAL PHASE SEQUENCE OF C NSTRUCTION: J�MSITE DEVELOPMENT LLC \ - •..:.„ (SCHEDULE PROVIDED AS PART OF CONSTRUCTION SEQUENCE IS FOR INFORMATION ONLY.) �� \I I PIN# 6817-73-9184 2\ \\ \ � \\\ \\ \ (DB.3246, PG.243) I I 1. BEGIN SITE GRADING. MAINTAIN EROSION CONTROL DEVICES IN ACCORDANCE WITH THE �2\ \\ \\ \I ll / I EMSITE DEVELOPMENT LLC C� I portion of 0 MAINTENANCE PLAN. INSTALL ADDITIONAL EROSION CONTROL MEASURES AS REQUIRED. �c\ \\ \ \\ II c� / / \ z I Y ..•:.:.•.:.:..:.:-., PIN# 6817-73-9184 \\v \ \� \ / 2 I z /'.��;:'�� �:`��'�::''�:'`,•�:-:v 2. INSTALL STORM DRAINAGE SYSTEM AND UTILITIES. STORM PIPING SHALL BE INSTALLED TO THE (DB.3246, PG. \\ \\ \\ / \ 57115.33 Sq. Feet [- ......: • . POINT WHERE IT ENTERS EACH DEVICE. COMPLETION OF PIPING WILL ONLY BE ALLOWED ONCE THE N \ \ 1.311 Acres : • .."..':�.:... ..; ....: z SITE HAS BEEN DEEMED STABLE BY THE EROSION CONTROL INSPECTOR. INSTALL PROTECTION -• AROUND ALL INLETS AS STORM DRAIN SYSTEM IS INSTALLED. 3. PRIOR TO THE CONTRACTOR DEMOBILIZING FROM THE SITE (AT APPROXIMATELY 45 DAYS PRIOR TO \ \ \\ �\ \ \ \ Ahl DEMOBILIZATION), THE FINANCIALLY RESPONSIBLE PARTY (OR THEIR DESIGNEE) WILL NOTIFY JOE \ \ \ \ \ \ \ \ \ ; \ \ _ I °; �, •:.•,f;.,:.,;f; :,:.'>�° :C�. N/F FOGARTY (CITY OF WINSTON-SALEM STORMWATER ENGINEER, 336-747-6961) AND THE DESIGNATED j\\� \` \ \ \ \ — \ \\ \ l / o /`° r'`'�:'''' .:'':`:!':': 99SNC LLC EROSION CONTROL INSPECTOR OF THEIR ANTICIPATED DATE TO LEAVE THE SITE. AN ON -SITE /� '[ : ' PIN# 6817-83 3089 \ \ M ; :.::..... ...:.:. . INSPECTION WILL BE CONDUCTED PRIOR TO THE LEAVE DATE BY MR. FOGARTY AND THE �\ \ \ — \\ \ \ I Cl (DB. 3368, PG.2225) DESIGNATED EROSION CONTROL INSPECTOR TO MAKE CERTAIN ALL ACTION ITEMS HAVE BEEN ADDRESSED BY THE CONTRACTOR.SEWER (Dg. EMENT 1 I 1 :::::.::- i:; ":.::.:,:'•.; ..:.•. �., .:., :: 4. CONTINUE TO MAINTAIN EROSION CONTROL MEASURES UNTIL VEGETATIVE COVER HAS BEEN \\ 2010, PG. 1605 ESTABLISHED OVER ALL DISTURBED AREAS AND SITE HAS BEEN STABILIZED. REMOVE EROSION \ \ \\ \ s \ \\ ` 917(PB. 40, PG. 80 ) CONTROL MEASURES ONLY AFTER FINAL INSPECTION AND APPROVAL BY INSPECTOR. ) \ '':'::�• .';::::'` .�::•:` EROSION AND SEDIMENT CONTROL MAINTENANCE PLAN \ P — \ \ ��� = a �g Ts) 5. INSPECT ALL SEDIMENTATION AND EROSION CONTROL DEVICES FOR STABILITY AND FUNCTION EACH WEEK AND FOLLOWING EACH RAINFALL EVENT. 905 6. REMOVE SILT/SEDIMENT FROM TEMPORARY DEVICES WHEN ACCUMULATED VOLUME HAS REACHED \ \ \ \\ \ \ — I / \ •':i Y•::'' ': : 50 CAPACITY. \\\ \ \ \ \\ 4, W /o / f -90 7. REMOVE ACCUMULATED SILT/SEDIMENT FROM BEHIND TEMPORARY SEDIMENT FENCE WHEN DEPTH f \ \ \ \ \ \ \ / 902, EXCEEDS APPROXIMATELY 0.5'. REPAIR AND REPLACE SILT FENCE AS NECESSARY. \\\ \ \ \ �\\ \ \\ \\ \ \ / sot — — — _ \ \ �� \ 1 \ / f , 4x~ :...:..,•..: ,'. �..: 8. SEED AND STABILIZE TEMPORARY DIVERSION BERMS IMMEDIATELY AFTER CONSTRUCTION INCLUDING "CLEAN" WATER DIVERSION BERMS. RE-GRADE/REPAIR BERMS AS REQUIRED. \� \ ! \\\\\ \ 899—BC 9. CONTRACTOR SHALL APPOINT AN ON -SITE INSPECTOR AND MAINTAIN RECORDS OF INSPECTIONS IN ACCORDANCE WITH THE PROVISIONS OF THE GENERAL NPDES STORMWATER DISCHARGE PERMIT FOR CONSTRUCTION ACTIVITIES. ((rr � \ \ 1\\ \ \ 1 1 E�EN�IO ANT PERMANENT STABILIZATION 0�DiPBP40 mil— o ANY DISTURBED AREA IS TO BE SODDED \f 'lot I 1 I1 1 c� 1 / \ EIP 1/2„ GROUND STABILIZATION CRITERIA STABILIZATION SITE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS TIMEFRAME PERIMETER DIKES, SWALES, 7 DAYS NONE DITCHES, & SLOPES SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 1 O' OR LESS IN LENGTH & ARE NOT STEEPER THAN 2:1, 14 DAYS ALLOWED SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES > 50 FEET IN LENGTH ALL OTHER AREAS WITH 14 DAYS NONE SLOPES FLATTER THAN 4:1 North Coro l ino One -Coll Center 2300 W. Ideadowview Road, Suite 227 Greensboro, North Carolina 27407 (910) 855-5760 2 DAYS BEFORE DIGGING IN NORTH CAROLINA CALL UNDERGROUND LOCATORS. CONTRACTOR SHALL CONTACT THE UNDERGROUND LOCATORS EVERY 10 DAYS FOR AN UPDATE TO UTILITY LOCATIONS. Coll 5E�:ORE you ®Icz;1 ''It's The Law' REBAR I I I 11 1 \ 1 III I I II I\ I y o 000�0 00 y/ STD°3Ei'2�-- \ \ J \ PROPOSED 10 TONS AND 28SY FILTER FABRIC I I 1 1 20 vcE PSE (SEE DETAIL 8 ON SHEET C302 FOR I I 1 \ I sevl DIMENSIONS) II ij'�� // / f�IN# 6d1-82-3-5p /(/iW20 5(WG la) / ------ 11 00 i-L Lij U J In a- Lij w J m Q U� C/ ) rr� vJ F- of 0 z 30 15 0 30 60 GRAPHIC SCALE 1"=30' mi D La Q oCD (� N (n LOE 00 N N 0 Q ° C3 Um E 0 m c LO Y _ o o0 Cz E 0 o ro o m 0 R` LLJ J W y Z 0 Q J Z LL Q z 0 LL U J 0�/ z z Ln 0 O LU 0� w H Z m J It LU LU (D not C A RO���i I • 048306 11 PLAN STATUS 2/16/21 UTILITY REVISIONS 4/6/21 CITY OF WINSTON—SALEN 5/28/21 CITY OF WINSTON—SALEN 7/16/21 CITY OF WINSTON—SALEN 7/23/21 CITY OF WINSTON—SALEN DATE DESCRIPTION HW DESIGN HW DRAWN YY CHKD SCALE H' V: JOB No.150048-01-00 DATE APRIL, 2020 FILE No. 150048—D—CP-001 NC LICENSE No. C-3556 Cad file name: V:\150048 - Culver's\150048-01-001 (ENG) - Culver's Restaurant Winston-Salem\Engineering\Engineering Plans\Construction Plans\150048-D-CP-001-ESP.dwg 7/23/2021 LOD HAS BEEN REVISED TO 2.58 AC SHEETC3 01 0 oM 7C7C/)00 D 0 C/) H :z > =-nzDm = U O 0 zF,omT o C3 , nDyD Cn ' z rn C F-I v m 71 z o0 r- N Cn D D _ D 1 0 �> - 1--I H G) H M m 00 4 X D A OUTLET W/DITCH OUTLET W/O DITCH D CLASS W RIP RAP CLASS I RIP RAP CLASS W RIP RAP CLASS I RIP RAP TONS TER F. RXo S.Y. TONS F. Rx- TONS S.Y. TONS Fey= 12" 2 5 5 2 5 1 4 2 1 4 15" 2 7 7 3 7 1 5 3 2 6 18"1 3 10 9 4 10 2 7 4 2 8 24" 5 14 15 7 15 3 11 7 4 12 30" 8 21 21 11 22 1 5 16 11 7 17 36" 11 28 29 15 30 7 22 16 10 23 42" 15 37 39 20 39 10 28 22 13 30 48" - - 49 26 50 - - 28 17 38 54' - - 60 33 62 - - 36 21 47 60" - - 73 40 75 - - 44 26 56 66" - - 87 48 89 - - 54 32 67 72" - 102 1 57 104 - - 64 38 78 NOTE: FOR CALCULATION PURPOSES CLASS 'B' RIP RAP = 100 LB - CLASS I RIP RAP = 105 LB B PLAN �D SLOPE 11/2:1 OR FLATTER 11 D j T FILTER FABRIC m SECTION A -A N PIPE OUTLET WITH DITCH H= RIP RAP TO TOP OF PIPE (MAX. H = D + T) T= 15" CLASS I RIP RAP, UNLESS OTHERWISE SHOWN ON PLANS :HEFT 1 nc 1 T= 12" CLASS 'B' RIP RAP, UNLESS OTHERWISE SHOWN ON PLANS 876.02 1 RIP RAP DETAIL 4 X D z oCO QQ F-i 0 LL_j �Z OOO= Cr z wQQLi- m QO�OrOi H = ~ z Lu CnF- U_OJ 0 U) z H CL o Qo N r- W � O O O LL B z a ■ Q a o Q 0 <a z IOC �a = GG Cn J Ix CD O z U_ W T 0 ZD ZD SECTION B-B PIPE OUTLET WITHOUT DITCH SHEET 1 OF 1 876.02 TOP AND BOTTOM S' SHALL BE 10 GAUGI USE GEOTEXTILE A MINIMUM OF 36" IN WIDTH AND FASTEN ADEQUATELY TO THE POSTS AND WIRE AS DIRECTED. USE WIRE A MINIMUM OF 32" IN WIDTH AND WITH A MINIMUM OF 5 LINE WIRES WITH 12" VERTICAL SPACING. PROVIDE 5'-0" STEEL POST OF THE SELF -FASTENER ANGLE STEEL TYPE. FOR MECHANICAL SLICING METHOD INSTALLATION, GEOTEXTILE SHALL BE A MAXIMUM OF 18" ABOVE GROUND SURFACE. NTS 2 z OU) Q SEE APPROVED = CC U PRESERVATION P LL J I REQUIRED RADIU NOTES O 0 U) = z OF TREE BARRIE 1. PROVIDE TURNING RADIUS SUFFICIENT TO ACCOMMODATE LARGE Q Z o 0 TRUCKS. =' z Lu 2. LOCATE ENTRANCES TO PROVIDE FOR UTILIZATION C/) ALL O J BY ALL CONSTRUCTION VEHICLES. 0 Cf) < 3. MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT z j TRACKING OR DIRECT FLOW OF MUD ONTO STREETS. °T a PERIODIC TOPDRESSING WITH STONE WILL BE NECESSARY. o o r 4. ANY MATERIAL TRACKED ONTO THE ROADWAY MUST BE CLEANED UP IMMEDIATELY. 5. LOCATE GRAVEL CONSTRUCTION ENTRANCE AT ALL POINTS OF INGRESS AND EGRESS UNTIL SITE IS STABILIZED. PROVIDE FREQUENT CHECKS OF THE DEVICE AND TIMELY MAINTENANCE. 6. NUMBER AND LOCATION OF CONSTRUCTION ENTRANCES TO W BE DETERMINED BY THE ENGINEER. V 7. USE CLASS 'A' STONE OR OTHER COARSE AGGREGATE APPROVEDCE Z BY THE ENGINEER. o 8. INSTALL CONSTRUCTION ENTRANCES IN A WAY TO PREVENT VEHICLES LL FROM BYPASSING CONSTRUCTION ENTRANCE LEAVING PROJECT SITE. z Z W I. Q Z Cr O O N t- o � Z O m Q J W � > Q NOTE: PLACE GEOTEXTILE FOR DRAINAGE BENEATH STONE 1 OF 1 rSHEET _1_1607.01 4 CONSTRUCTION ENTRANCE DETAIL NTS,_ FOR LATE WINTER AND SOIL AMENDMENTS: EARLY SPRING: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER SEEDING MIXTURE: MULCH: RYE (GRAIN) - 120 LB/ACRE APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANNUAL LESPEDEZA (KOBE) - 50 LB/ACRE ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING (OMIT ANNUAL LESPEDEZA WHEN DURATION TOOL OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE) MAINTENANCE: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, FERTILIZE AND MULCH IMMEDIATELY FOLLOWING SEEDING DATES: EROSION OR OTHER DAMAGE JAN. 1 - MAY 1 FOR SUMMER: SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER SEEDING MIXTURE: GERMAN MILLET - 40 LB/ACRE MULCH: (A SMALL -STEMMED SUDANGRASS MAY BE APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH SUBSTITUTED AT A RATE OF 50 LB/ACRE) ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL SEEDING DATES: MAY 1 - AUG. 15 MAINTENANCE: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE FOR FALL: SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 1,000 LB/ACRE 10-10-10 FERTILIZER SEEDING MIXTURE: RYE (GRAIN) - 120 LB/ACRE MULCH: / APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH l/ SEEDING DATES: ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING AUG. 15 - DEC 30 TOOL / MAINTENANCE: REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOPDRESS WITH 50 LB/ACRE OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB/ACRE KOBE LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. 1 FOR ADDITIONAL INFORMATION, REFER TO NCDENR EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL (ESCPDM), SECTION 6.10. FOR PERMANENT SEEDING SPECIFICATIONS, INCLUDING SEED BED PREP, SEASONAL LIMITATIONS FOR SEEDING OPERATIONS, THE KINDS OF GRADES OF FERTILIZERS, THE KINDS OF SEED, AND THE RATES OF APPLICATION OF LIMESTONE, FERTILIZER, AND SEED, REFER TO NCDENR ESCPDM SECTION 6.11 AND THE CHARLOTTE LANDSCAPE CONSTRUCTION STANDARDS SECTION 04200 SEEDING AND SODDING OF TURFGRASS. 7 TEMPORARY SEEDING SCHEDULE NTS 0 PLAN VIEW OF ROOT ZONE 8' MAX. WITH WIRE (6' MAX. WITHOUT WIRE) GEOTEXTILE COMPACTED FILL--,,,, , 4„ ' STEEL POST - 2'-0" DEPTH EXTENSION OF GEOTEXTILE AND WIRE INTO TRENCH SILT FENCE DETAIL ONE FOC INCH OF OR 1/2 FOR PRUNING SEE WHICHEVI INTERNATIONAL SOCIETY OF ARBORICULTURE SPECS. DEAD TREES AND SCRUB OR Ul' GROWTH SHALL BE CUT FLUSH ADJACENT GRADE. NO GRUBBIN ALLOWED UNDER DRIP LINE. 2"x4" STANDARDS + 1 "x4" RAILS OR ORANGE SAFETY FENCING MAY BE USED. "PF QVTWT i4ft1T MCA "Im NO 4EFNW {y M*L. 3 IL z OCO F- QQ LL Doc=z Cr wQQL= Q U O H H CnHLLOJ Orr OCnCC z .� l Lu m o W LL V 0 z z W LL o ~ J N C:j N Q O c O IL o Q W o m 1605.01 NTS NOTES: 1. REMOVE ALL BARRIERS UPON COMPLETION OF PROJECT. 2. LANDSCAPING PLANS SHALL SHOW THE LOCATIONS OF ALL TREE PROTECTION FENCES. 4 10 a4 54 100 21 ib M0 1000 DISCHARGE, FT31 SEC MANAGEABLE 2 FOOT CONTAINMENT AREA STEEL POST WIRE FENCING (I' APPLICABLE) WOVEN FILTER FABRIC - 4' MAX. CLASS 1 OR 2 RIP -RAP WITH b •INCHES Of WASHED STONE ON UPSTREAM FACE - LIFT STRAPS -OVERFLOW PORTS DUMPING STRAPS STORM INLET DANDY SACK TN DANDY SACKTN TO BE INSTALLED AFTER FILTER FABRIC INLET PROTECTION IS REMOVED FOR PAVING AND TO REMAIN IN PLACE UNTIL STABILIZATION IS MET AND ENGINEER APPROVES REMOVAL. 1. REMOVE ALL ACCUMULATED SEDIMENT AND DEBRIS FROM VICINITY OF UNIT AFTER EACH STORM EVENT. 2. AFTER EACH STORM EVENT AND AT REGULAR INTERVALS, LOOK INTO THE DANDY SACK UNIT. IF UNIT IS MORE THAN 1 FULL OF ACCUMULATED SEDIMENT, THE UNIT MUST BE EMPTIED. 3. TO EMPTY UNIT, USING THE LIFTING STRAPS LIFT THE UNIT OUT OF THE INLET AND REMOVE THE GRATE. TRANSPORT THE UNIT TO AN APPROPRIATE LOCATION FOR REMOVAL OF THE CONTENTS. HOLDING THE DUMPING STRAPS ON THE OUTSIDE AT THE BOTTOM OF THE UNIT, TURN THE UNIT UPSIDE DOWN, EMPTYING THE CONTENTS. REINSTALL UNIT. 4. FOR OIL AND SEDIMENT MODEL; REMOVE AND REPLACE ABSORBENT WHEN NEAR SATURATION. 5. DISPOSE OF UNIT AND/OR ABSORBENT IN ACCORD WITH APPLICABLE FEDERAL, STATE AND LOCAL ENVIRONMENTAL LAWS AND REGULATIONS. * NOTE: 1. FILTER SACKS TO BE USED FOR BOTH CURB INLETS AND CATCH BASIN INLETS INLET PROTECTION GENERAL NOTES: 1. SEDIMENT FILTER OUTLET SHALL BE 16 INCHES HIGH BUT NO TALLER THAN 18 INCHES. 2. CLASS I OR 2 RIP -RAP SHALL BE USED AND COVERED WITH 06INCHES OF NCDOT #5 OR #57 WASHED STONE ON THE UPSLOPE SIDE. RK MULCH, PLACE BARK 3. POSTS SHALL BE NO MORE THAN 4 FEET APART. i AT AREAS NOT 4. SITE OUTLETS AT ANY POINT SMALL CONCENTRATED FLOWS ARE ANTICIPATED AND AT THE :CTED BY BARRIER. DIRECTION OF THE INSPECTOR. 5. ONE ACRE MAXIMUM DRAINAGE AREA PER OUTLET. NOTE: CONTRACTOR CAN USE A MIXTURE OF CLASS B AND CLASS I RIPRAP AND USE THE LARGER STONES AS NEEDED FOR STABILIZATION CLASS 1 OR 2 RIP-RAP-\t' WIN. POST WASHED STONE (NCDOT /5 OR #57) FLOW NTS MAINTENANCE NOTES: i. FILTER OUTLETS SHALL BE INSPECTED BY THE FINANCIALLY RESPONSIBLE PARTY OR HIS AGENT IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REPAIRS NEEDED SHALL BE MADE IMMEDIATELY. 2. THE STONE SHALL BE REPLACED PROMPTLY AFTER ANY EVENT THAT HAS CLOGGED OR REMOVED IT. 3, SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN DEPOSITS REACH HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE OUTLET IS REMOVED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED. 6 SILT FENCE STONE OUTLET DETAIL 8' Outlet Protection Design Outlet Pipe Dia, in 15 Peak discharge, cfs 4.69 d 50, in 6 La, ft 8 3D°, ft 3.75 W, ft 9.25 D 6 SY CLASS B RIPRAP 3.75' 9.25' MINIMUM REQUIRED RIPRAP PER NCDEQ Outlet Protection Design Outlet Pipe Dia, in 15 Peak discharge, cfs 4.69 d50, in 6 La, ft 32 3D°, ft 5 W, ft 9.25 RIPRAP DATA 5' PROPOSED RIPRAP NTS 9.25' NTS oZ Imu° J J Ci C� c N J) LO b N Z T � E o ° 0 ELLO om m L� 2' n Y CZ = ai o ° C Cz E 0 o ro o � II J LL W O U 0 V 1 J O�/ LPL �Z 0 U O w � Ln Z O o U) LU LU O Z LU m J w w c� SEAL ; 048306 11110 PLAN STATUS 2/16/21 UTILITY REVISIONS 4/6/21 CITY OF WINSTON-SALEN 5/28/21 CITY OF WINSTON-SALEN 7/16/21 CITY OF WINSTON-SALEN 7/23/21 CITY OF WINSTON-SALEN DATE DESCRIPTION I HW HW YY DESIGN DRAWN CHKD SCALE H' V: JOB No.150048-01-00 DATE APRIL, 2020 FILE No. 150048-D-CP-001 NC LICENSE No. C-3556 Cad file name: V:\150048 - Culver's\150048-01-001 (ENG) - Culver's Restaurant Winston-Salem\Engineering\Engineering Plans\Construction Plans\150048-D-CP-001-ESP-DET.dwg 7/23/2021 FO SHEETC3 02