Loading...
HomeMy WebLinkAbout20110317 Ver 1_Certification of Completion_20130402HC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, RE Governor Director NCDWQ Project No.: 20110317 County: Wayne Applicant: NCDOT Project Name: Bride 120 on SR 1728 — TIP No. B4673 Date of Issuance of 401 Water Quality Certification: April 7, 2011 Dee Freeman Secretary Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. This form may be returned to NCDWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certijlcation I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Engineer's Cerdflcatlon Date: Partial X Final I, Corey D. McLamb , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, ll tim the construction of the project,for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, �the ,approved plans and specifications, and other supporting materials. Signature �--� Registration No. 032142 Date 12 lZ Transportation and Permitting Unit 1650 Mail Service Center, Ralegh, North Carolina 27699 -1617 Location: 512 N. Salisbury St Raleigh, North Carolina 27604 Phone: 919 -807 -63001 FAX: 919$07 =6492 Intemet: www.ncwaterouality.oro An Equal Opportunity 1 Affirmative Action Employer Noe Carolina )Vt7 11r111111 �0N _ one. Y� Noe Carolina )Vt7 11r111111