Loading...
HomeMy WebLinkAbout20211109 Ver 1_Meeting Request Review_20210714 DWR Pre-Filing Meeting Request Form .:.. NORTH CAROLINA Environmental Quafity ID#* 20211109 Version* 1 Regional Office* Central Office-(919)707-9000 Reviewer List* Rob Ridings Pre-Filing Meeting Request submitted 7/14/2021 ........................................................................................................................................................................................................................................................................................................................................................................................................................................................ Contact Name* Robert Turnbull Contact Email Address* robert.turnbull@terracon.com Project Name* Eastfield Highway 70A Connector Project Owner* Town of Selma Project County* Johnston Owner Address: Street Address 101 S. Radford St., Suite 200 Address Line 2 Coy State/R-ovince/Region Selma NC Fbstal/Zip Code Country 27576 USA Is this a transportation project?* r Yes r No Type(s)of approval sought from the DWR: i7 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express I— Individual Permit I— Modification 1 Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below and include location information.* Realignment of US Highway 70A associated with the Eastfield Development in Selma. Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. . I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. . I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature Submittal Date 7/14/2021 Reviewer Meeting Request Decision .............................. Is a meeting required or is there more info needed?* r Yes C No If nrore information is needed,please add con II ents for the email notification below. Comment for Email: Accepted date for meeting