Loading...
HomeMy WebLinkAbout20211172 Ver 1_Meeting Request Review_20210721 4�P t DWR Pre-Filing Meeting Request Form NORTH CAROLINA EnYlmnal2nlrtl Qua fay ID#* 20211172 Version* 1 Regional Office* Central Office-(919)707-9000 Reviewer List* Rob Ridings Pre-Filing Meeting Request submitted 7/21/2021 ......................................................................................................................................................................................................................................................................................................................................................................................................................................................... Contact Name* Troy Beasley Contact Email Address* tbeasley@withersravenel.com Project Name* E. Front Street&N. Church Street Drainage Repair Project Owner* Town of Clayton Project County* Johnston Owner Address: Street Address PO Box 879 Address Line 2 City State/Rovince/Region Clayton NC Fbstal/Zip Code Country 27520 USA Is this a transportation project?* r Yes r No Type(s)of approval sought from the DWR: rJ 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express I— Individual Permit I— Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below and include location information.* Removal and replacement of the existing failing 36"RCP beneath E. Front Street and construction of riprap dissipator to address ongoing erosion that has caused failure of the existing culvert. Please attach the documentation you would like to have the meeting about. Impact_Exhibits.pdf 1.83MB pdI only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. . I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. . I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature Submittal Date 7/21/2021 Reviewer Meeting Request Decision Is a meeting required or is there more info needed?* r Yes (' No If rrnre information is needed,please add convents for the errail notification below.