Loading...
HomeMy WebLinkAboutSW4210702_Supplement-EZ Form_20210729SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Sauthem Alamar a High School Additions and Renovations 2 Project Area ac 89.5 0 m 3 Coastal Wetland Area ac 4 Surface Water Area ac 0 5 Is this P ro ect H ig h or Low Dens ? Hi fi Roes this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided feet NIA _ 8 Will the vegetated setback remain vegetated? NIA 9 If BUA is proposed in the setback, does it meet NCAC 02H.I003 4 o-d ? N/A 10 Is streambank stabilization proposed on this project? J No NUMBER AND TYPE OFSCMs: 11 infiltration System 12 Bioretention Cell 13 Wet Pond 1 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting RWH _ 18 Green Roof 19 Level S p reader -Filter Stri LS-FS 20 Disconnected Impervious Surface (DIS)_ 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter _ _ 26 Filterra FORMSLOADEQ DESIGNER CERTIFICATION 27 Name and Title: L. Allan Hill, PEJPrinci aI 28 Organization: _ Triad Design Group, PC 29 Street address: City, State, Zip: �T _4807-C "er. Boulevard_ Gre_ensbora, NC 27407 30 31 Phone numbers : 336-218-8282 32 Email: ahill@triad-designgroup.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete: and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. ,�\A C,4r901 �w o Q':,[I�. SEAL F 1580-9 r - + �'`'��LAN 1 ill. ,,�• r � Seal Signature of Designer 7 y has/ Date DRAINAGE AREAS f Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 1 3 ❑aes this pLoject. have low de ns ity areas? NO 4 If so, number of low densit y drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM Wet Pond Wet Pond 5 Total drainage area (sq ft 3898620 Z73992 6 Onsite drainage area (sq ft 3898520 273992 7 Offsite drainage area (sq ft 0 0 8 Total BUA in project (sq ft 1042609 sf 169884 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft 122055 sf 131966 sf 10permitting) New BUA not on subdivided lots (subject to s sf sf 11 Offsite BUA (sq ft sf sf 12 1 Breakdown of new BUA not on subdivided lots: - Parkin (sq ft sf sf Sidewalk ft sf sf - Roof (sq ft sf sf - Roadway s 1t sf sf - Future ft sf sf - Other, please specify in the comment box below (sq ft sf sf 13 New infiltrating permeable pavement on Isubdivided lots (sq ft sf sf 14 New infiltrating permeable pavement not on subdivided lots 1t sf sf 15permitting) Existing BUA that will remain (not subject to s ft 37918 sf 37918 sf 16 Existing BUA that is already permitted (sq ft sf sf 17 Existing BUA that will be removed (sq ft 205298 sf 82534 sf 18 Percent BUA 27% 62°% 19 Design storm inches .0 in 1.0 In 20 Design volume of SCM cu ft cf 13883 cf 21 Calculation method for design volume of SAIDA ADDITIONAL INFORMATION 22 _ Please use this space to provide any additional information about the drainage area(s): WET POND 1 Drains a area number j 1 2 1 Minimum required treatment volume cu tt 13883 cf GENERAL: MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? No 4 Is the SCM located away from contaminated sails? Yes 5 What are the side slopes of the SCM (H: ? :1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? Nc 7 Are the inlets, outlets, and receiving stream protected from erosion t 0 ear storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes 9 What is the method for dewatering the SCM for maintenance? Drawdown Orifice 10 If applicable, wilt the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the d rai nag a easement comply with General MDC 9 ? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General M DC 10 ? NIA i4 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Pie that complies with General MDC 12)? Yes 16 Does the SCM follow the devicespecific MDC? Yes 17 Was the SCM designed by an NO licensed professlonaI? I Yes WET POND MDC FROM 02H .3053 18 Sizing method used SAIDA 19 Has a stage/storage table been provided in the calculations? Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal fmsl 599.00 21 Elevation of the main pool bottom (top of sediment removal) (fmsl) 600.DO 221 Elevation of the bottom of the vegetated shelf (fmsl) 603.50 231 Elevation of the permanent pool fmsl 604.00 24 Elevation of the top of the vegetated shelf fmsl 604.50 25 Elevation of the temporary pool fmsl) 605.50 26 Surface area of the main permanent pool (square feet) 8172 27 Volume of the main permanent pool cubic feet) 22533 cf 28 Average depth of the main pool feet 3.46 It. 29 Average depth equation used Equation 3� 30 If using equation 3, main poolperimeter (feet) 31 If using equation 3, width of submerged . shelf feet 32 Volume of the forebay (cubic feet 33 Is this 15-20% of the volume in the main pool? 34 Clean -out depth for fore bay inches 35 Design volume of SCM (cu ft 36 Is the outlet an orifice or a weir? Orifice 37 If orifice, orifice diameter (inches) 2 in 38 if weir, weir height inches 39 If weir, weir length inches 40 Drewdown time for the tempora ry pool (days) 41 Are the inlets] and outlet located in a manner that avoids short- circuitin ? 42 1 Are berms or baffles providad to improve the flowpath? 43 Depth of forebay at entrance (inches) 4d Depth of forebay at exit [inches 45 Does water flow out of the forebay in a non -erosive manner? 46 Width of the vegetated shelf (feet) 47 Slope of vegetated shelf (H: 48 Does the orifice drawdown from below the top surface of the permanent ool. 49 Does the pond minimize impacts to the receiving channel from the 1- yr. 24-hr storm? 50 Are fountains proposed? (If Y, please provide documentation that MDC 9 is met. 51 Is a trash rack or other device provided to protect the outlet system? 52 Are the dam and embankment planted in non -clumping turf grass? 53 Species of turf that will be used on the dam and embankment 541 Hasa planting plan been g2vided for the vegetated shelf? ADDITIONAL INFORMATION T 55 Please use this space to provide any additional information about th wet ponds): et Pond 10:20 AM 7/28/2021 WET POND Wet Pond 2 16:26 AM 7/28/2021