Loading...
HomeMy WebLinkAboutSW4210702_Plansheet - SCM Detail_20210729607.90 100 YR. FLOOD STAGE 10 YR. FLOOD STAGE 606.66 2 YR. FLOOD STAGE 606.00 6' VEG. SHELF (10H/1 V) 1 YR. FLOOD STAGE 605.75 T/SHELF 604.50 g� TEMP. BAFFLES TO REMAIN IN B/SHELF 603.50 SHELF PLACE DURING CONSTRUCTION 3 FOREBAY SEE PLAN 1 INSTALL AFTER ALL AREAS DRAINING INTO POND ARE STABILIZED FLOODWATER STAGE TEMP. W.Q. STORAGE 1' 3' 3' 0 > RIPRAP OUTLET FROM PIPE TO BOTTOM OF POND NOTE - VOLUME BELOW 8"0 DRAIN PIPE IS TO BE PUMPED OUT AT TIME OF CLEANING OR DURING MAINTENANCE. V THK. NCDOT #57 STONE 605.50 EL. 604.00 NP RISER - SEE DETAIL CONSTRUCT DAM WITH IMPERMEABLE SOILS. COMPACTED TO 98% STD. PROCTOR DENSITY W/ A MOISTURE CONTENT OF -1% TO +3% OF OPTIMUM. SOILS SHALL BE UNIFORM IN CHARACTER & INSTALLED IN 8" MAXIMUM LIFTS. SOILS SHALL BE FREE OF ORGANICS & PARTICLES OF 2" OR GREATER. EL. 600.00 10' 6' 10' MIN. HEL MIN. 3' 3' EL V_j INV. 2 E. 599.00 EL. 608.00 PROPOSED STM MH 47 TOP = 603.89 - - = 598.01 2 MAX SLOP 2 PERM. W.Q. STORAGE z 3 1 L � PE M. SEDIMENT STORAGE 1 L J 1 NCDOT CLASS B STONE, b 1 1 18" RCP TO STM 48 INSTALL DURING TRANSITION N INV. = 597.81 FROM SED. BASIN TO WET 2' 2' DETENTION POND 99.46 LF 18"0 CAP ® 1.00 CUT-OFF TRENC BACKFILL W/IMPERMEABLE SOILS COMPACTED TO -RISER NOTE- 95% STD. PROCTOR DENSITY THE RISER IS DESIGNED FOR THE 100 YR. STORM AND IS THE EMERGENCY SPILLWAY. WET DETENTION POND / SEDIMENT BASIN -NOTE- DETAIL TEMPORARY SEDIMENT BASIN SHALL BE COMPLETELY CLEANED OF SEDIMENT AND UPGRADED TO FUNCTION AS PERMANENT DETENTION POND AFTER ALL PERMANENT NO SCALE EROSION CONTROL METHODS ARE ESTABLISHED AS INDICATED ON FINAL SITEWORK PACKAGE DRAWINGS. 30'0 X 4.25' HIGH ALUM. EXPANDED METAL TRASH GUARD TOP FLOODWATER STORAGE EL. 607.91 TOP OF RISER EL. 605.50 Uo NORMAL POND LEVEL - EL. 604.00 SUPPORT BRACKET, SEE DIET. POND EL. 600.00 SEDIMENT LEVEL 1.0' EL. 599.00 -_ NOTE - VOLUME BELOW 8"0 DRAIN PIPE IS TO BE PUMPED OUT AT TIME OF CLEANING OR DURING MAINTENANCE. NOTE - DRAWING NOT TO SCALE. 8"0 DRAIN 777-1 I I l- INV=733.50 'b 4.0' 4.5'x4.5' -ROM TOE OF DAM POND RISER (10 YEAR DESIGN STORM) (1 REQUIRED) DETAIL #4 ® 6" O.C. E.W. 9- 1 /A" THK- ANTI-VORTFx ORIFICE, 1.5"0 30" CAP HELICAL ALUM. 14 GAGE PIPE 10.00 Q10= 20.48 CFS FLANGE JOINTS WITH 3/8" NEOPRENE GASKET ANCHOR INTO CONC. DAM 15" TYPICAL VARIES 13" TYPICAL VARIES CD CD 5/8" DIA. HOLES 9' SST U-BOLT W/DBL. NUTS TO STABILIZE LIFT ROD FOR GATE CONTRACTOR TO ATTACH TO ALUM. RISER LIFT ROD SUPPORT BRACKET DETAIL NO SCALE INLET ORIFICE 2" VENT WITH BLUE TIP " 3" PVC FLOAT 2 SCH. 40 SOLID PVC BARREL OR "ARM" SUPPLIED BY USER . , e%^Ii 1 A n ALUMINUM STRAPS SUSPENDING INLET ,29 "- 3" INLET EXTENSIONS `5"' HEAD ON CEN IEH OF INLET AND 2" HOSE, SS CLAMPS ORIFICE 2" THREADED MALE PATENT #5,820,751 NIPPLE ON OUTLET END 3" FAIRCLOTH SKIMMER DETAIL NO SCALE NOT TO SCALE WET DETENTION POND CALCULATIONS ON -SITE OFF -SITE TOTAL TOTAL PROPOSED TEMP. W.Q. TEMP. W.Q. POND DRAINAGE DRAINAGE DRAINAGE BUILT -UPON AVG. PERM. W.Q. POND AREA POND AREA STORAGE STORAGE PERMANENT POOL PERMANENT SEDIMENT PERMANENT SEDIMENT FOREBAY VOLUME FOREBAY VOLUME W.Q. W.Q. RELEASE WEIR No. AREA AREA AREA AREA STORAGE DEPTH SA/DA REQUIRED PROVIDED REQ'D. PROVIDED VOLUME STORAGE REQUIRED STORAGE PROVIDED REQUIRED (15%-20%) PROVIDED OUTLET TIME RISER BARREL LENGTH 1 6.29 AC. 0.00 AC. 6.29 AC. 3.90 AC. 3.48 FT (AVG.) 2.01 5507 SF 5800 SF 13883 CF 14303 CF 24768 CF 6"-12" 13 3715 CF-4954 CF 4756 CF 1.5"0 2.26 DAYS 30"0 ALUM. 18"0 ALUM. 7.85' (RISER) * PIPE SHALL BE 14 GAGE HELICAL ALUMINUM CONSTRUCTION SEQUENCE FOR WET POND ET POND CONSTRUCTION NOTES 1. CLEAR AREA FOR POND AND POND DAM. 1. FILTER DIAPHRAGM SHALL BE INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS OF THE 2. BEGIN CONSTRUCTION OF POND DAM BEGINNING WITH THE INSTALLATION OF THE CITY OF GREENSBORO. DAM'S CUT OFF TRENCH AS SHOWN ON C2.4 OF THE APPROVED DRAWINGS. 3• 2. ALL AREAS LOCATED ALONG AND ABOVE THE POND BENCH SHALL RECEIVE A MINIMUM OF 4 4. CONTINUE WITH THE DAM CONSTRUCTION, AND INSTALL THE DAM'S RISER AND INCHES OF TOPSOIL AND BE PERMANENTLY SEEDED. SOIL STABILIZATION BLANKET SHALL BE BARREL KIT AND ANTI SEEP PLATES AS THE GRADING PROGRESSES. COMPACT APPLIED TO ALL AREAS WITH A FINISHED GRADE OF 6/1 OR GREATER. ALL METHODS AND SOILS WITHIN DAM AND AROUND BARREL AS INDICATED WITHIN THE POND DETAILS MATERIALS FOR SOIL STABILIZATION BLANKET SHALL BE IN ACCORDANCE WITH THE NORTH AND WET POND CONSTRUCTION NOTES. CAROLINA EROSION AND SEDIMENTATION CONTROL MANUAL. SODDING MAY BE SUBSTITUTED IN PLACE OF SOIL STABILIZATION BLANKET. 5. INSTALL OUTLET STABILIZATION DEVICE AT THE POND BARREL OUTLET AS INDICATED 3. THE BOTTOM OF THE BASIN AND THE SIDE SLOPE UP TO 18 INCHES ABOVE THE WATER ON THE PLANS. SURFACE ELEVATION SHALL BE OVER EXCAVATED BY A MINIMUM OF 12 INCHES AND 6. ONCE THE POND DAM IS CONSTRUCTED AND THE POND AREA HAS BEEN EXCAVATED REPLACED WITH A LAYER OF SILTY CLAY (CL) UNLESS OTHERWISE DIRECTED BY THE AS INDICATED ON THE PLANS, STABILIZE DISTURBED AREAS, AND DAM FACE WITHIN GEOTECHNICAL ENGINEER. THE SILTY CLAY LAYER SHALL BE PLACED ON APPROVED 14 DAYS OF REACHING FINISHED GRADE. SUBGRADES IN MAXIMUM 8 INCH LOOSE LAYER LIFTS AND SHALL BE COMPACTED TO AT LEAST 90 PERCENT OF THE STANDARD PROCTOR COMPACTION. COMPACTION SHALL BE ON 5. SET UP POND AS A TEMPORARY SEDIMENT BASIN FOR EROSION CONTROL PURPOSES. THE WET SIDE OF THE OPTIMUM MOISTURE CONTENT. 4. ALL BASINS SHALL FUNCTION AS A TEMPORARY SEDIMENT BASIN DURING CONSTRUCTION. 6. AS GRADING ON SITE PROGRESSES AND STORMDRAIN NETWORK IS INSTALLED, UPON COMPLETION OF CONSTRUCTION, THE BASINS SHALL BE CLEANED OF SEDIMENT AND INSTALL THE REQUIRED OUTLET STABILIZATION STRUCTURES WITHIN THE POND AS CONVERTED TO A STRRMWATER MANAGEMENT FACILITY. INDICATED ON THE PLANS. 5. THE CONTRACTOR SHALL ENGAGE THE SERVICES OF A STATE REGISTERED LAND SURVEYOR TO 7. ONCE BUILDING CONSTRUCTION IS COMPLETE AND ALL AREAS DRAINING TO POND PROVIDE AN AS -BUILT AND VOLUME COMPUTATIONS OF THE STORMWATER MANAGEMENT HAVE BEEN STABILIZED WITH PERMANENT VEGETATION, FINE GRADE MAKING SURE FACILITY AND SHALL PROVIDE THE AS -BUILT TO THE OWNER AND ENGINEER. POND BOTTOM, SHELF, AND DAM ARE AT THE ELEVATIONS AS INDICATED ON THE APPROVED DRAWINGS. 6. THE BERMS AROUND THE POND(S) SHALL BE CONSTRUCTED OF COMPACTED STRUCTURAL FILL 8. CLEAN ACCUMULATED SEDIMENT OUT OF BASIN PRIOR TO CONVERTING TO BMP/SCM. CLASSIFIED AS SM, SM-SP, SP, SC OR BETTER CONTAINING LESS THAN 30% BY WEIGHT SILT OF CLAY AND FREE OF DEBRIS. THIS MATERIAL SHALL BE PLACED ON APPROVED SUBGRADES AND IN HORIZONTAL LIFTS NOT EXCEEDING 8 INCHES IN LOOSE THICKNESS g• INSTALL STONE FOREBAY BAFFLE AND REMOVE E&SC BAFFLES FROM POND. MOISTURE CONDITIONED TO WITHIN -1% TO +3% OF OPTIMUM MOISTURE CONTENT AND COMPACTED TO MINIMUM OF 95% OF THE MAXIMUM DENSITY OBTAINED IN ACCORDANCE ASTM 10. CLEAN ALL RIP RAP ENERGY DISSIPATERS INTO POND AND BELOW POND DAM OF D698 STANDARD PROCTOR METHOD. SOILS SHALL BE FREE OF ORGANICS AND ANY ANY SEDIMENT, REPLACING RIP RAP IF REQUIRED. PARTICLES LARGER THAN 2" IN DIAMETER. EACH LIFT OF BERM SHALL BE SCARIFIED a PARALLEL TO THE BERM CREST AXIS TO A DEPTH OF 3 INCHES BEFORE PLACEMENT OF THE 11. DISPOSE OF THE SEDIMENT REMOVED FROM THE POND BOTTOM WITHIN AN APPROVED COMPACTED STRUCTURAL FILL. STRUCTURAL FILL SHALL BE ANALYZED AND APPROVED BY LOCATION. THE PROJECT GEOTECHNICAL ENGINEER PRIOR TO USE ON EMBANKMENT. AT ALL TIMES DURING THE CONSTRUCTION OF BMP EMBANKMENT, THE CONTRACTOR SHALL ENSURE THAT 12. CLOSE 8" DRAIN VALVE AND REMOVE SKIMMER FROM POND. THE GEOTECHNICAL INSPECTOR IS PRESENT AND OBSERVING THE INSTALLATION. N 0 13. PLANT VEGETATED SHELF AS REQUIRED. N 1-1 7. BEFORE THE PLACEMENT OF THE COMPACTED STRUCTURAL FILL FOR THE BERM THE rn SUBGRADES SHALL BE INSPECTED BY A GEOTECHNICAL ENGINEER. UNSUITABLE SOILS 14. 13. ALLOW POND TO FILL TO NORMAL POOL ELEVATION FROM STORM RUNOFF. 1-1 CONTAINING BUILDING RUBBLE AND OTHER DEBRIS SHALL BE REMOVED FORM THE BERM AREA. SUITABLE, COMPACTED BERM FILL SUBGRADE SHALL BE SCARIFIED PARALLEL TO THE BERM SEDIMENT TRAP AND SEDIMENT BASIN MAINTENANCE NOTES o CREST AXIS TO A DEPTH OF 3 INCHES BEFORE PLACEMENT OF THE COMPACTED STRUCTURAL Z ALL. a- 1. INSPECT TEMPORARY SEDIMENT TRAPS AND SEDIMENT BASINS AT LEAST WEEKLY AND AFTER 0 8. THE GEOTECHNICAL ENGINEER SHALL DETERMINE MATERIALS SUITABLE FOR STRUCTURAL FILL. EACH SIGNIFICANT(<<" OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. N U 9. SEED ALL SIDE SLOPES AND EMBANKMENTS PER THE SEEDING SCHEDULE SHOWN ON SHEET 2. WHEN SEDIMENT REACHES ONE-HALF THE DESIGN DEPTH OF THE TRAP OR BASIN, REMOVE I C2.1 SEDIMENT AND RESTORE TRAP OR BASIN TO ITS ORIGINAL DIMENSIONS. PLACE SEDIMENT (3' 3 THAT IS REMOVED IN A DESIGNATED DISPOSAL AREA. 10. STABILIZE SIDE SLOPES AND EMBANKMENTS GREATER THAN 3/1 PER THE NCDENR EROSION N AND SEDIMENTATION CONTROL MANUAL. 3. REPLACE ANY PART OF THE GRAVEL FACING THAT IS IMPAIRED BY SEDIMENT. 0 M U 11. INSTALLATION SHALL BE IN GENERAL CONFORMANCE WITH NCDENR STATE STORMWATER 4. PERIODICALLY CHECK THE DEPTH OF THE SPILLWAY TO ENSURE IT IS A MINIMUM OF 1.5 FEET QMANUAL LATEST EDITION. BELOW THE LOW POINT OF THE EMBANKMENT. C. 5. IMMEDIATELY FILL ANY SETTLEMENT OF THE EMBANKMENT TO SLIGHTLY ABOVE DESIGN a MP LANDSCAPING GRADE. I j1. A DETAILED LANDSCAPE PLAN PREPARED BY A QUALIFIED DESIGN PROFESSIONAL SHALL BE 6. ANY RIP -RAP DISPLACED FROM THE SPILLWAY MUST BE REPLACED IMMEDIATELY. SUBMITTED PRIOR TO CONSTRUCTION. A SOIL SAMPLE/ANALYSIS MAY BE REQUIRED PRIOR TO PLANT SELECTION TO ENSURE STORMWATER NOTES j2. o GROWTH AND PERFORMANCE. 0 1. THE ENGINEER'S CERTIFICATION OF COMPLETION WILL BE REQUIRED PRIOR TO THE FINAL of SOIL MAY REQUIRE ADDITIONAL ENRICHMENT TO ENSURE PLANT GROWTH AND PLAT OF CERTIFICATE OF OCCUPANCY. THE STORMWATER CONTROL IS TO BE INSPECTED TO N PERFORMANCE. ENSURE IT IS FUNCTIONING AS DESIGNED AND HAS FULL DESIGN VOLUME PRIOR TO •5 ISSUANCE OF THE FINAL CERTIFICATE OF OCCUPANCY. v 4. SOIL SHALL NOT BE COMPACTED PRIOR TO PLANTING. N = 2. THE PROPERTY OWNER IS RESPONSIBLE FOR MAINTAINING THE STORMWATER CONTROL • PLANTS SELECTED SHALL BE OF RANDOM DIVERSITY AND DENSITY TO ENSURE SURVIVAL. ACCORDING TO THE APPROVED MAINTENANCE PLAN AND DIRECTION OF THE NCDEQ U o 6. NO TREES OR SHRUBS SHALL BE PLANTED WITHIN 10 FEET OF INLET OR OUTLET PIPES, OR 3. NCDEQ AND THEIR ASSIGNS HAVE RIGHT TO ACCESS THE STORMWATER CONTROL FOR o MANHOLE DRAINAGE STRUCTURES SUCH AS SPILLWAYS OR FLOW SPREADERS. INSPECTIONS OR MAINTENANCE, AS NECESSARY. a 7. LANDSCAPING SHALL BE WATERED FOR THE FIRST YEAR AFTER PLANTING. 4. ALL NECESSARY APPROVALS HAVE BEEN/WILL BE OBTAINED FROM THE STATE/CORPS FOR a ANY WETLAND DISTURBANCE, STREAM CROSSING/DISTURBANCE. a B. A MINIMUM TWO-YEAR WARRANTY PERIOD SHALL BE PROVIDED STIPULATING REQUIREMENTS jFOR PLANT SURVIVAL/REPLACEMENT. 5. IN ACCORDANCE WITH GS-143-215.25A AND 143-215.26 OF THE NC DAM SAFETY LAW AND ADMINISTRATIVE CODE 15A NCAC 2K.0200, THE STATE DAM SAFETY OFFICE HAS BEEN/WILL BE CONTACTED FOR DETERMINATION OF THE HAZARD CLASSIFICATION OF THE PROPOSED DAM. �.i z 0 z 3 Q 0 WET DETENTION POND OPERATION & MAINTENANCE A. THE FOLLOWING TASKS SHALL BE PERFORMED AFTER EVERY RUN-OFF PRODUCING RAINFALL EVENT, OR MONTHLY AS A MINIMUM. 1. REMOVE DEBRIS FROM TRASH RACK. 2. CHECK/CLEAR OBSTRUCTIONS FROM ORIFICE OUTLET. 3. CHECK POND SIDE SLOPES AND DAM EMBANKMENT. REMOVE TRASH AND REPAIR ERODED AREAS. 4. CHECK SEDIMENT LEVELS BEHIND BAFFLES. REMOVE SEDIMENT WHEN DEPTH REACHES 1/2 BAFFLE HEIGHT. B. THE FOLLOWING TASKS SHALL BE PERFORMED EVERY THREE MONTHS. 1. INSPECT STORMWATER COLLECTION SYSTEM (PIPING, STRUCTURES, SWALES) FOR PROPER OPERATION. REMOVE TRASH, SEDIMENTS & OBSTRUCTIONS FROM SYSTEM. 2. INSPECT RIPRAP ENERGY DISSIPATORS FOR EROSION AND UNDERCUTTING. REPAIR AS REQUIRED. 3. REPAIR ERODED AREAS AND RESEED BARE SPOTS THROUGHOUT, TO REDUCE SEDIMENT GENERATION. 4. INSPECT POND OUTLET DEVICES AND CHANNEL DOWNSTREAM OF DAM. REPAIR UNDERCUTTING OR DAMAGE TO CHANNEL LINING. 5. CHECK DOWNSTREAM DAM FACE FOR EVIDENCE OF SEEPAGE OR OVERTOPPING. C. THE FOLLOWING TASKS SHALL BE PERFORMED EVERY SIX MONTHS. 1. INSPECT INTERIOR OF OUTLET STRUCTURE. REMOVE ACCUMULATED SEDIMENTS OR OBSTRUCTIONS. 2. CHECK POND DEPTH AT VARIOUS LOCATIONS. REMOVE ACCUMULATED SEDIMENTS IF DEPTH IS LESS THAN 3/4 SPECIFIED. 3. CLEAR TREES AND SAPLINGS FROM DAM EMBANKMENT. D. GENERAL 1. MOW POND SIDES REGULARLY TO MAINTAIN MAXIMUM GRASS HEIGHT OF 6". 2. REMOVE VEGETATION WHICH GROWS WITHIN POND, EXCEPT WETLAND GRASSES ALONG PERIMETER. 3. MONITOR POND DRAWDOWN TIME. IF DRAWDOWN EXCEEDS TABULATED TIME, REMOVE OBSTRUCTIONS FROM RISER ORIFICE. 4. INSPECT EMERGENCY SPILLWAY. REPAIR ERODED AREAS AND REMOVE OBSTRUCTIONS. STM 30 1 61 L t III I (� 1�p STM 26 �/- W-W%1164A ,9 612 61 NX , ` /b�0 I 3 _-� 3� 6' i Imo\ I1\11 O ST � I - rn (0 �O � • i _ STORMPIN POND PLAN HIGH MARSH 1166 SF Plant requirement - 50/200 sf. Plants provided - 292 HERBACIOUS SCHEDULE Scientific Name Common Name Size Quantity Carex Tenera Quill Sedge 1 qt 97 HERBACIOUS SCHEDULE Scientific Name Common Name Size Quantity Iris Virginica Blue Flag Iris 1 qt 91 Juncus Effusus Soft Rush 1 qt 91 Sagittaria Latifolia Duck Potato 1 qt 91 "= 20' POND VEGETATION NOTE(MDC 11) THE FOLLOWING CRITERIA APPLY TO VEGETATION IN AND AROUND THE WET POND: A. THE DAM STRUCTURE, INCLUDING FRONT AND BACK EMBANKMENT SLOPES, OF THE POND SHALL BE VEGETATED WITH NON -CLUMPING TURF GRASS; TREES AND WOODY SHRUBS SHALL NOT BE ALLOWED; AND B. THE VEGETATED SHELF SHALL BE PLANTED WITH A MINIMUM OF THREE DIVERSE SPECIES OF HERBACEOUS, NATIVE VEGETATION AT A MINIMUM DENSITY OF 50 PLANTS PER 200 SQUARE FEET OF SHELF AREA. MAINTENANCE SCHEDULE FOR WETLANDS/VEGETATED SHELF DESCRIPTION METHOD FREQUENCY TIME OF THE YEAR SOIL INSPECT AND REPAIR VISUAL MONTHLY MONTHLY EROSION ORGANIC LAYER REMULCH ANY VOID AREAS BY HAND WHENEVER NEEDED WHENEVER NEEDED REMULCH PLANTING AREAS BY HAND ONCE A YEAR SPRING REMOVE DEBRIS AND ALL FLOATABLE MATERIALS. BY HAND WHENEVER NEEDED. WHENEVER NEEDED. CHECK FILTRATION RATE. VISUALLY EVERY SIX MONTHS SPRING/FALL INSPECT PAVEMENT/GRASS INTERFACE FOR CRACKING -BREAKAGE. VISUALLY MONTHLY. MONTHLY PLANTS PLANTING DATES 3-15 TO 4-30 AND 10-1 TO 11-30 REMOVAL AND REPLACEMENT OF ALL DEAD AND DISEASED SEE PLANTING TWICE A YEAR 3-15 TO 4-30 AND VEGETATION CONSIDERED SPECIFICATIONS 10-1 TO 11-30 BEYOND TREATMENT TREAT ALL DISEASED MECHANICAL OR N/A VARIES DEPENDS ON INSECT TREES AND SHRUBS BY HAND OR DISEASE INFESTATION WATERING OF PLANT MATERIAL SHALL TAKE PLACE AT THE END OF EACH DAY FOR 14 BY HAND IMMEDIATELY AFTER N/A CONSECUTIVE DAYS AFTER PLANTING HAS BEEN COMPLETED. REPLACE DEAD PLANTS AFTER TWO YEARS BY HAND ONCE A YEAR WATERING OF PLANT MATERIAL BY HAND WEEKLY 3-15 TO 10-30 ENGINEER'S CERTIFICATION OF STORMWATER QUALITY CONTROL o I certify that, pursuant to generally accepted engineering standards in the community, it Is my professional opinion that runoff from the first inch of rainfall from areas that are required to be controlled per section 30-7-1.12 of the Greensboro Development Ordinance is controlled by a permanent engineered stormwater quality control that has been designed to meet or exceed the requirements in the Greensboro stormwater Management Manual. 000000CA a00000 � Rp °° oo�OO OF E°S°S /0 /�� o0 O �j ° O as SEAL -7o a 0 15809 0 C, °°ti G I N �`iQ- � 000 o°° °°°0,90 �ANoa�o o �a APRILD26 2021 PROFESSIONAL OF RECORD: L. ALLAN HILL, P.E. ENGINEER'S CERTIFICATION NOTE OF STORMWATER QUANTITY CONTROL e The storm water control structure(s) shown on this plan is designed to reduce the post -development 1 year 24 hour storm event, 2 year 24 hour storm event and the 10 year 24 hour storm event to pre -development rates. 00000a0000a0000 o��°aO��N CAS�j°O`��i°°°o p 2° a °a SEAL � o 0 15809 0 O � a O � ° ono � °NQo°GIN 94 ` °�ANoo`,00�APRILDHe 2021 PROFESSIONAL OF RECORD: L. ALLAN HILL, P.E. ir IR ENGINEER'S CERTIFICATION OF POND AND DAM SAFETY I, L. Allan Hill, P.E. certify that the stormwater pond and dam shown on this plan satisfies requirements of the North Carolina State Dam Safety Law of 1967 (As Amended Through 1995) and the Rules and Regulations as presented in the North Carolina Administrative Code Title 15A, o00000000000000 Subchapter 2K - Dam Safety. In accordance with the requirements in articles GS 143-215.25A and 143-215.26 of �-�N CAiRO`�o°°° the NC Dam Safety Law and NC Administrative Code 15A NCAC 2K .0200 the Regional Engineer in the Winston-Salem Regional Office of he NC State's Land Quality Section has been /will be contacted or the determination of whether the o ��°pF E°S°S /O° ?i9 00 proposed dam is governed by or exempt from the Dam Safety Law. I, as the qualified design engineer, certify o oa SEAL �° that the pond and dam are designed to be safe and adequate for the protection of public a r-o 0 health, safety, welfare, and downstream property. I understand that this certification as the o 15809 0 design engineer shall not relieve the owner or operator of the pond and dam from the legal°° o duties, obligations, and liabilities arising from such ownership or operation. o 0 G I N�-- �-' � op °�� oANaallo APRILD26 2021 PROFESSIONAL OF RECORD L. ALLAN HILL, P.E. w VFW,0 J r LL triaddesigngroup � Architecture I Engineering I Interior Design Triad Design Group, P.C. � 4807-C Koger Boulevard o Greensboro, NC 27407 Telephone 336-218-8282 Facsimile 336-218-8010 www.triad-designgroup.com NC Architecture Reg. 50709 NC Engineering Lic. C-1108 CAP0,01101 S ° o p o p G O O Q P � G O p ° 4 °°°�LAN Ha �a°a °0�a00alf00a MAY 18, 2021 PROFESSIONAL OF RECORD: L. ALLAN HILL, P.E. Wz W� a o00 ao N ON � wC �z� a O w W o Q 00 �w °z� C203