Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
770001_Routine Inspection_20210727
7 /; r/) Facility Number _©division of Water Resources 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit:-Stompliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: ..0'Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Farm Name: Owner Name: Mailing Address: Physical Address: Facility Contact: Arrival Time: f Ord Departure Time: F7 F, Ce4,1449-a �I Owner Email: Phone: County: 7, Region: cez,,u_r_6( Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: // Title: Phone: Latitude: Integrator: Certification Number: Certification Number: Longitude: Swine Design Current Capacity Pop. Wean to Finish Wean to Feeder Cr- Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Design Current Wet Poultry Capacity Pop. Layer Non -Layer Dry Poultry Design Current Capacity Pop. Layers Non -Layers Pullets Turkeys Turkey Poults Other Cattle Design Current Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes :]No ❑NA ❑NE ❑ Yes yi No ❑ NA ❑ NE ❑ Yes No ❑ NA 0 NE ❑ Yes yi No E NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes LI No ❑ NA ❑ NE Page 1 of 3 5/12/2020 Continued Facility Number: `7) - Q ) Waste Collection & Treatment Date of Inspection:?/d 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 i )- 3 C1 1 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes (gNo ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) �C 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes g' No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes `gl No ❑ NA n NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes IXNo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes cgiNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes5Z1-No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable -Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): e�..c�Gy�C�a i&e.- tlih 62' C,r),,„0 i) cD t yr of( C5, f -zee// v _.) 13. Soil Type(s): Ui e ! &&- t )4.1ei 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes El7j No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes IszZI No ❑ NA 0 NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable 0 Yes f No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes No 0 NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes tgl No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes 1 ' No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes 14 No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements El Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. n Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers 0 Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes El No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes Xi No ❑ NA ❑ NE Page 2 of 3 5/12/2020 Continued Facility Number: 1 - f7 Date of Inspection: 7 ,9..T) /�. I 24. Did the facility fail to calibrate waste application equipment as required by the permit? 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: ❑ Yes N.No ❑ NA ❑ NE ❑ Yes yj No ❑ NA ❑ NE 26. Did the facility fail to provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: ❑Yes No ❑NA ❑NE ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE E Yes No ❑ NA ❑ NE 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ipNo ❑NA ❑NE ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). form IooiK gooci, AAA - get IN deC €LPUtvi5 Reviewer/Inspector Name: - ' Hie /so it.) // / / FA,irep Or Phone: CJlf , 5-1 Reviewer/Inspector Signature: ,1A4,1' .1,4$tiL) Date: 7/01 7/d-1 Page 3 of 3 5/12/2020 FACILITY #: 111 FARM NAME: FREEBOARD ACTUAL LAGOON LEVEL PERMIT (#19) / 6-4- mac; - DUE EVERY 5 YEARS - EXPERIATION DATE Ott okt9 NUMBER OF ANIMALS I D ) - OIC CARD YES OR NO WASTE UTILIZATION PLAN (WUP) (#20) SOIL TYPES CROP TYPES - THE UTLIZATION PLAN SHOULD HAVE A (-) NEGATIVE NUMBER - ODOR CONTROL CHECK LIST YES OR NO - Irrigation Plan Maps WASTE REPORT (#21) -GOOD FOR 60 DAYS BEFORE OR AFTER DATE 6'72 f ! � NITROGEN LEVEL ). . 667 SOIL REPORT (#21) EVERY 3 YEARS: DATE P1PD P-I (NO MORE THEN 400) PH (Note if 4 or less) Cu/ZN (NO MORE THEN 3000) CU ZN (IF PEANUTS NO MORE THEN 300) MENTAL CHECK OF CROP AND FIELD NUMBERS IRR2 (#21) ZONE ACRES PAN CROP TYPE -I FLOW RATES , �� NITROGEN (N) O=�I 120 Min inspection initialed Weather Codes Commercial Fertilizer Chicken Litter i�i(F5 feScAle tiQ(mm) CALBRIATION (#24) EACH REEL SHOULD BE CALIBRATED / DATE DUE EVERY TWO YEARS I -I / I FLOW RATES 'I 5- RAIN FALL (#21) -INITIAL AFTER 1" RAIN EVENT -LOOK FOR ANY LEVEL THAT IS LESS THEN THE DESIGNED FREEBORED -LOOK FOR BIG NUMBER DIFFERENCES SEE THAT THEY MATCH THE IRR2 FORM LUDGE (#21 & 25) -DUE EVERY YEAR: DrFE �'. �rOdi qj 0: '7J P: 1 .1% RATIO OF SLUDGE y' l I (1) . a tIci Li)) OTHER FORMS (#22 AND #21) � RAIN BREAKER FORM CROP YEILDS MORTALITY VISUAL CHECK FOUNDATION OR PIT LEAKS PIPE LEAKS LAGOON SEEPAGE LAGOON BARE AREAS TREES OR GRASS NEED TO BE REMOVED EROSION DITCHES WINTER CROP(OVERSEEDED) ALIVE CROP HARVESTED FIELDS GOOD HEALTHY CORPS CORRECT CROPS NO PONDING REELS FEED BINS LAGOON GARBAGE