HomeMy WebLinkAbout820652_Compliance Inspection Routine_20210611 (2)Division of Water Resources
❑ Division of Soil and Water Conservation
❑ Other Agency
Facility Number: 820652
Facility Status: Active
Permit: AWS820652
Inspection Type: Compliance Inspection Inactive Or Closed Date:
Reason for Visit: Routine
Date of Visit: 06/11/2021
Entry Time: 08:00 am
County:
Sampson
Region:
Exit Time: 2:30 pm Incident #:
Farm Name: Sampson Boar Stud / Farm 78060 Owner Email:
❑ Denied Access
Fayetteville
Owner: Murphy -Brown LLC Phone: 910-296-1800
Mailing Address: PO Box 487 Warsaw NC 283980487
Physical Address: 9300 Tomahawk Hwy Harrells NC 28444
Facility Status: Compliant ❑ Not Compliant Integrator: Murphy -Brown LLC
Location of Farm: Latitude: 34° 42' 32" Longitude: 78° 20' 43"
From Fayetteville, NC take Hwy. 210 South to Hwy. 41. Turn left on Hwy. 41. Go — 2 miles. Farm is on left. Mail Box Number 9300
Question Areas:
▪ Dischrge & Stream Impacts
▪ Records and Documents
1. Waste Col, Stor, & Treat
Other Issues
• Waste Application
Certified Operator:
Secondary OIC(s):
Alton Eugene Mobley
Operator Certification Number: 25259
On -Site Representative(s): Name Title Phone
24 hour contact name Mike Norris
On -site representative Mike Norris
Primary Inspector:
Inspector Signature:
Secondary Inspector(s):
Steve Guyton
Phone: 910-433-3300
Date:
Inspection Summary:
most of the waste was trazfered to 82-216 Ezzell
reviewed records off site.
Page 1 of 5
Permit: AWS820652
Owner: Murphy -Brown LLC
Inspection Date: 06/11/21 Inspection Type: Compliance Inspection
Facility Number: 820652
Reason for Visit: Routine
Regulated Operations
Design Capacity
Current promotions
Swine
Swine - Boar/Stud
Waste Structures
Type
400
0
Identifier
Effective
Date
Total Design Capacity:
Total SSLW:
Built
Date
400
160,000
Closed Designated Observed
Date Freeboard Freeboard
Lagoon
1
09/18/2006
D1/01/1995
20.20
80.00
Page 2 of 5
Permit: AWS820652
Owner: Murphy -Brown LLC
Inspection Date: 06/11/21 Inspection Type: Compliance Inspection
Facility Number: 820652
Reason for Visit: Routine
Discharges & Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at:
Structure
Application Field
Other
a. Was conveyance man-made?
b. Did discharge reach Waters of the State? (if yes, notify DWQ)
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does discharge bypass the waste management system? (if yes, notify DWQ)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to Waters of the
State other than from a discharge?
Waste Collection, Storage & Treatment
4. Is storage capacity less than adequate?
If yes, is waste level into structural freeboard?
5. Are there any immediate threats to the integrity of any of the structures observed (I.e./ larc
trees, severe erosion, seepage, etc.)?
6. Are there structures on -site that are not properly addressed and/or managed through a
waste management or closure plan?
7. Do any of the structures need maintenance or improvement?
8. Do any of the structures lack adequate markers as required by the permit? (Not applicablE
to roofed pits, dry stacks and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
maintenance or improvement?
11. Is there evidence of incorrect application?
If yes, check the appropriate box below.
Excessive Ponding?
Hydraulic Overload?
Frozen Ground?
Heavy metals (Cu, Zn, etc)?
PAN?
Is PAN > 10%/10 lbs.?
Total Phosphorus?
Failure to incorporate manure/sludge into bare soil?
Outside of acceptable crop window?
Evidence of wind drift?
Application outside of application area?
Crop Type 1
Yes No NA NE
❑ • ❑ ❑
011100
❑ • ❑ ❑
❑•❑ ❑
01100
❑•❑ ❑
Yes No NA NE
❑ • ❑ ❑
IEI
❑ • ❑ ❑
0.00
❑ • ❑ ❑
❑•❑ ❑
Yes No NA NE
❑ • ❑ ❑
❑ • DE
❑❑❑❑❑❑❑❑❑❑❑
Natural Vegetation
Page 3 of 5
Permit: AWS820652
Inspection Date: 06/11/21
Owner: Murphy -Brown LLC
Facility Number: 820652
Inspection Type: Compliance Inspection Reason for Visit: Routine
Waste Application
Crop Type 2
Crop Type 3
Crop Type 4
Crop Type 5
Crop Type 6
Soil Type 1
Soil Type 2
Soil Type 3
Soil Type 4
Soil Type 5
Soil Type 6
14. Do the receiving crops differ from those designated in the Certified Animal Waste
Management Plan(CAWMP)?
15. Does the receiving crop and/or land application site need improvement?
16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre
determination?
17. Does the facility lack adequate acreage for land application?
18. Is there a lack of properly operating waste application equipment?
Records and Documents
19. Did the facility fail to have Certificate of Coverage and Permit readily available?
20. Does the facility fail to have all components of the CAWMP readily available?
If yes, check the appropriate box below.
WUP?
Checklists?
Design?
Maps?
Lease Agreements?
Other?
If Other, please specify
21. Does record keeping need improvement?
If yes, check the appropriate box below.
Waste Application?
Weekly Freeboard?
Waste Analysis?
Soil analysis?
Waste Transfers?
Weather code?
Rainfall?
Stocking?
Yes No NA NE
Cainhoy sand, 0 to 5%
slopes
❑ • ❑ ❑
❑•❑ ❑
❑•❑ ❑
❑•❑ ❑
❑•❑ ❑
Yes No NA NE
❑ •❑ ❑
❑•❑ ❑
0E100
❑❑❑❑❑❑❑❑
Page 4 of 5
Permit: AWS820652
Inspection Date: 06/11/21
Owner: Murphy -Brown LLC
Facility Number: 820652
Inspection Type: Compliance Inspection Reason for Visit: Routine
Records and Documents
Crop yields?
120 Minute inspections?
Monthly and 1" Rainfall Inspections
Sludge Survey
22. Did the facility fail to install and maintain a rain gauge?
23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipmen
(NPDES only)?
24. Did the facility fail to calibrate waste application equipment as required by the permit?
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check the
appropriate box(es) below:
Failure to complete annual sludge survey
Failure to develop a POA for sludge levels
Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge?
27. Did the facility fail to secure a phosphorous loss assessment (PLAT) certification?
Other Issues
28. Did the facility fail to properly dispose of dead animals within 24 hours and/or document
and report mortality rates that exceed normal rates?
29. At the time of the inspection did the facility pose an odor or air quality concern? If yes,
contact a regional Air Quality representative immediately.
30. Did the facility fail to notify regional DWQ of emergency situations as required by Permit:
(i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility?
If yes, check the appropriate box below.
Application Field
Lagoon / Storage Pond
Other
If Other, please specify
32. Were any additional problems noted which cause non-compliance of the Permit or
CAW M P?
33. Did the Reviewer/Inspector fail to discuss review/inspection with on -site representative?
34. Does the facility require a follow-up visit by same agency?
Yes No NA NE
El
El
El
❑ • ❑ ❑
❑ • ❑ ❑
❑ • ❑ ❑
❑ • ❑ ❑
❑ • ❑ ❑
❑ • ❑ ❑
Yes No NA NE
❑■❑❑
❑ • ❑ ❑
❑ • ❑ ❑
❑ • ❑ ❑
❑ ❑ ❑
Page 5 of 5