Loading...
HomeMy WebLinkAbout20120712 Ver 1_Email_20130228RE: B -4488 Slocum Creek - Moratorium , Page 1 of 3 RE: B -4488 Slocum Creek - Moratorium (C' veL�7 Ward, Garcy Sent: Thursday, February 28, 2013 2:10 PM To: Johnson, Jay B; Lane, Stephen; Steffens, Thomas A SAW (Thomas.A.Steffens @usace.army.mil) Cc: Wainwright, David; Wilson, Travis W.; Carrillo, Sonia; Ward, Garcy Jay, This e -mail serves as authorization from DWQ to continue in -water work on Bridge 176 over Slocum Creek in Craven County (B -4488) through March 8th of this year. The in -water work moratorium will begin on March 9th and continue through September 30th. This supercedes condition 2 of the modification that was issued on 2/8/13. Please print out this e -mail to keep with the 401 Certification. Thanks. Garcy Ward Environmental Senior Specialist North Carolina Division of Water Quality Washington Regional Office From: Johnson, Jay B Sent: Thursday, February 28, 2013 10:15 AM To: Ward, Garcy; Lane, Stephen; Steffens, Thomas A SAW ( Thomas .A.Steffens @usace.army.mi1) Cc: Wainwright, David Subject: FW: B -4488 Slocum Creek - Moratorium Sirs, Requesting approval to move forward with the Bridge demo through 3/8. From: Johnson, Jay B Sent: Thursday, February 28, 2013 7:32 AM To: Ward, Garcy; Lane, Stephen; Steffens, Thomas A SAW ( Thomas .A.Steffens @usace.army.mil) Cc: Mcmannen, Brad T; Blankenship, Andrew; Bunn, Eddie J; Eatmon, Bryce E; Brame, Bill Jr. Subject: FW: B -4488 Slocum Creek - Moratorium Sirs, FYI. Travis granted extending in water work for bridge demo through March 8th. We can monitor their progress on Tues. 3/5. From: Wilson, Travis W. Sent: Wednesday, February 27, 2013 10:44 AM To: Mcmannen, Brad T Cc: Blankenship, Andrew; Johnson, Jay B Subject: RE: B -4488 Slocum Creek - Moratorium i WRC understands the contractor has run into problems that have delayed the removal of the old structure and concurs with NCDOT's assessment that leaving the partially demolished bridge would be hazardous. Therefore; WRC does not object to continuing in water work at this site through March 8 as requested. NOTE: NEW PHONE NUMBER AND MAILING ADDRESS Travis W. Wilson Eastern Region Highway Project Coordinator Habitat Conservation Program NC Wildlife Resources Commission 1718 Hwy 56 West https:Hmail.nc.gov /owa/ ?ae= Item& t = IPM. Note& id= RgAAAADMSzLcd9W2TJHI4 %2bm... 3/15/2013 RE: B -4488 Slocum Creek - Moratorium Creedmoor, NC 27522 Phone: 919 - 707 -0370 Fax: 919 - 528 -2524 Travis.Wilson @ncwildlife.org From: Mcmannen, Brad T Sent: Wednesday, February 27, 2013 9:58 AM To: Wilson, Travis W. Cc: Blankenship, Andrew; Johnson, Jay B Subject: FW: B -4488 Slocum Creek - Moratorium From: Mcmannen, Brad T Sent: Wednesday, February 27, 2013 9:45 AM If you have any questions, please let me know. Thanks, Brad McMannen, PE Assistant Resident Engineer North Carolina Department of Transportation 209 S. Glenburnie Rd. New Bern, NC 28560 (252) 514 -4759 (P) (252) 514 -4716 (F) Page 2 of 3 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. To: Mcmannen, Brad T Subject: B -4488 Slocum Creek - Moratorium Travis, Palmetto is currently working on removing the old bridge structure on Church Street over Slocum Creek. Contractor has been saw cutting the bridge (deck, rail and caps) into pieces to remove with a crane. They have been able to remove some of the pieces so far. Contractor has ran into several snags, which include containment continuously needing repair, saws being sent to have repaired, guy wire on the east side was in the way and crane not being delivered as scheduled. The guy wire on the east side of the bridge was 35 feet from end bent 2. This location was in conflict with the crane being able to function. Progress Energy was able to move the lines on Monday February 25. The crane which was scheduled to be delivered this week from Edwards, has been delayed and will not arrive until Monday March 4. The 2 cranes on site currently are not strong enough to remove this structure. This new crane is much bigger and will be able to handle the loads. If we stop work due the moratorium, the NCDOT feels that we are creating a hazard for the boating public. https:Hmail.nc. gov /owa/ ?ae= Item &t = IPM. Note& id= RgAAAADMSzLcd9 W2TJH14 %2bm... 3/15/2013 RE: B -4488 Slocum Creek - Moratorium Page 3 of 3 The NCDOT requests that the moratorium be extended to Friday March 8 for this project, at which time the contractor will be completed with bridge demolition. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. https:Hmail.ne. gov /owa/ ?ae= Item &t = IPM. Note& id= RgAAAADMSzLcd9 W2TJH14 %2bm... 3/15/2013