HomeMy WebLinkAbout20110918 Ver 1_DCM Permit_20130422Permit Class k � _
MODIFICATION/MINOR
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and
Coastal Resources Commission
ermit
for
X Major Development in an Area of Environmental
pursuant to NCGS I I3A -118
X Excavation and/or filling pursuant to NCGS 113 -229
Issued to Osprey Oaks Marina, 3197 Hwy 24, Newport, NC 28570
Permit Number
148 -11
Authorizing development in Carteret County adi. to Broad Creek, at 3197
Hwy 24, in Newport , as requested by the permittee
This permit, issued on April 15, 2013 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
1) This minor modification shall be attached to the original of Permit No. 148 -11, which was issued on
12/15/11, and copies of both documents shall be readily available on site when Division personnel
inspect the project for compliance.
2) All conditions and stipulations of the active permit remain in force under this minor modification.
Maintenance Clause
3) The Division of Coastal Management shall be notified in writing at least two (2) weeks in advance of
any maintenance work authorized by this permit and that notification include:
A. The number of the original permit;
B. A statement that no dimensional changes are proposed;
C. A copy of the original permit plan(s) with cross - hatching indicating the area to be maintained
and the area to be used for dredge spoil, and the estimated amount of material to be removed;
D. The date of plan revision and the permittee's signature shown anew on the original plan.
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit shall be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work shall cease when the permit expires on
January 16, 2015
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DENR and the
Chairman of the Coastal Resources Commission.
Brax . Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee